← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / SMBC/KN2

Site allocation SMBC/KN2

Safeguarding Land for Arden Academy

On pages 149 to 150 of the official PDF.

The human version

This site allocation safeguards land shown on the Policies Map for education uses linked to the expansion or redevelopment of Arden Academy. The wider site known as KN2, Land South of Knowle, now largely has planning permission for housing. After the 2020 plan was withdrawn in October 2024, an indicative masterplan was produced and endorsed at Cabinet in December 2024. This identified 1.8 ha of land for transfer to the Council, mainly linked to 200 dwellings on land west of Warwick Road. The land is expected to be transferred in phases later this year. The text then names land around Dorridge Railway Station, KN3, as a broad location.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 149

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/KN2: Safeguarding Land for Arden Academy 1 Land as identified on the Policies Map shall be safeguarded for education uses in connection with the expansion/redevelopment of facilities at Arden Academy. Justification 686. As noted in proceeding paragraphs, permissions are now largely in place for the residential development of the wider site known as KN2 (Land South of Knowle), which was proposed as an allocation in the 2020 plan. Part of the overall policy approach set out within the 2020 plan is that land would be made available for the expansion/redevelopment of Arden Academy to ensure sufficient space is available for both quantitative and qualitative improvements to facilities at the site. 687. Following the withdrawal of the 2020 plan in October 2024 the Council worked with the respective landowner's/site promoters and a n indicative land use masterplan was produced and consulted on in Autumn 2024. This was latterly endorsed at Cabinet in December 2024 and h elped provide a basis upon which subsequent planning applications have been considered. This included the provision of 1.8 ha of land being identified for transfer to the Council, primarily in connection with the development of 200 dwellings on land west of Warwick Road55 but also linked by way of condition to the other associated applications. In all cases this has been given significant positive weight when the applications were considered, helping support cases of Very Special circumstances. The Council remain in active engagement with all parties, and the land is expected to be formally transferred (on a phased basis) later this year. 55 Planning application reference 2025/00155. Broad Locations56 KN3 - Land around Dorridge Railway Station 688. NDMPs S5 (1)(h): Principle of development outside settlement and GB7 (1 )(h): Development which is not inappropriate in the Green Belt, now support development within reasonable walking distances of railway stations and as such development consistent with these national policies can be expected to come forward in this settlement. This will include development around Dorridge station and as such it is included as a broad location in this plan. 56 See Policy SMBC/HO2: Broad Locations for the policy wording relating to these areas.
Infrastructure & utilitiesSite allocationsTransport & travel📍 Dorridge📍 Knowle
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.