The human version (we wrote this, not the council)This section introduces the new Solihull Local Plan. It notes that two thirds of the Borough is in the Green Belt, including the Meriden Gap that separates Solihull and the Birmingham conurbation from Coventry. The current plan was adopted in December 2013 and covers 2011 to 2028, but is now seen as largely out of date. A 2020 Draft Submission Plan was withdrawn in October 2024 after a long examination. This plan replaces the 2013 plan and the 2014 Gypsy and Traveller Site Allocations DPD. Without a plan, the Council could not show a 5-year land supply. Five neighbourhood plans have been made and remain part of the development plan.
OpenConsult / Solihull Plan Explorer
Infrastructure & utilities
The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.
393 sections of the plan, in document order.
The human version (we wrote this, not the council)This section sets out the national and regional setting for the plan. The plan will be tested against the NPPF of December 2024, but planning applications are decided under the NPPF published in August 2026, which brings in National Development Management Policies. The West Midlands Combined Authority is preparing a Spatial Development Strategy for the region, guided by eight principles, with adoption expected from spring or summer 2028. Regulations from 25 March 2026 removed the legal duty to cooperate, but the soundness test remains. The Council plans to meet all of its own needs. If the strategy later shows Solihull should take more, a new plan may be needed sooner.
The human version (we wrote this, not the council)This section sets out the vision for the plan. It links to the Council Plan 2025-30, approved in July 2025, whose vision is 'Solihull: a great place to live, work, invest and enjoy'. The planning vision says that by 2043 Solihull will have built on its reputation as an attractive place. It will have made the most of HS2 Interchange, with key assets such as Birmingham Airport, the NEC and JLR backed by transport links. The Borough will meet its local housing needs. It will keep its sense of identity, including protecting the Green Belt and the Meriden Gap. Action on the Climate Change emergency will run through everything.
The human version (we wrote this, not the council)This section explains where development will go. The 2020 plan used a 'balanced dispersal' approach, mixing growth in a few large locations with growth spread over more places. Around 75% of residents live in the urban area, but land there is very limited, so Green Belt options were also needed. The 2026 NPPF promotes growth around railway stations, which the section says still fits this approach. Development will focus on the urban edge, towns, larger villages and land near suitable railway stations. Isolated development will be discouraged. A settlement hierarchy assessment adopted in October 2025 found Balsall Common and Knowle, Dorridge and Bentley Heath should be treated as towns.
The human version (we wrote this, not the council)This policy requires affordable housing on major residential sites of 10 or more homes, or 0.5 hectares or more. Sites in or released from the Green Belt must provide 50% affordable housing, and other sites 40%. The tenure split should be 65% social rent and 35% shared ownership, with set mixes of home sizes for each. Where on-site provision is not feasible or viable, a financial contribution will be sought, and the applicant pays for the Council's valuer. Vacant building credit may apply. Neighbourhood plan policies on mix can take precedence. The supporting text says the HEDNA identified a need for 714 affordable homes per annum.
The human version (we wrote this, not the council)This policy encourages developers to provide self and custom build housing on residential sites of 300 units or more. The plots should be offered for sale for 12 months to people on Solihull's Self and Custom Build Housing Register. They should have outline planning permission, be fully serviced to the boundary and have unconstrained access to the highway. A Registered Surveyor will value the plots independently. After 12 months, the plots go back to the developer and are built as market housing. The supporting text explains the 'Right to Build' from the Housing and Planning Act 2016, and how the Register is split into two parts.
The human version (we wrote this, not the council)This policy covers housing for older and disabled people. New housing should offer a mix of sizes and types to meet their needs. All new homes on major sites must meet Category M4(2) accessible and adaptable standards, unless built to M4(3). At least 5% of homes on major developments must be wheelchair user dwellings to M4(3). Developments of 300 dwellings or more must provide specialist housing or care bedspaces, though this will be applied flexibly. Specialist housing and care homes (Use Class C2) will be supported where they are close to shops, amenities, public transport and health care. Care homes must also meet Care Quality Commission standards.
The human version (we wrote this, not the council)This policy sets the preferred mix of market homes on allocated sites, broad locations and major windfall sites. The Council will seek 45% with 1 or 2 bedrooms, 40% with 3 bedrooms and 15% with 4 or more bedrooms. It will take into account site size, local need and demand, access to services and public transport, viability and the need for mixed communities. The mix is based on the 2026 HEDNA. Town centre sites may deliver a different mix. The HEDNA also shows a need for bungalows, mainly with 2 bedrooms. Any bedroom should meet national space standards.
The human version (we wrote this, not the council)This section introduces the economy chapter. It says Solihull has a strong and productive economy and is home to key assets such as Jaguar Land Rover, Birmingham Airport and the National Exhibition Centre. The HS2 rail link and Interchange Station will make the Borough more attractive to business. The Solihull Economic Strategy (2022 to 2032) aims for Solihull to be the 'UK's best-connected economy'. The UK Central Hub area includes these assets and Arden Cross, the land bounded by the A45, A452 and the M42. In 2016 the Council set up the UK Central Urban Growth Company to lead delivery. The plan aims to make the most of this growth.
The human version (we wrote this, not the council)This policy covers the UK Central Hub Area, which the plan says has the greatest potential for growth in the Borough. The Hub includes Birmingham Airport, the NEC, Birmingham Business Park and Jaguar Land Rover, and the Arden Cross site around the HS2 Interchange Station. Proposals must show how they support inclusive growth and the key assets, and improve connections and travel other than by car. They must not hold back development elsewhere in the Hub. They should provide green and blue infrastructure, good design, local jobs and low carbon energy. The Hub Framework Plan (2018) estimated up to 77,500 jobs and up to 4,000 new homes up to 2047.
The human version (we wrote this, not the council)This policy supports a broad range of development at the NEC to improve the visitor offer and its international competitiveness. This includes new or refurbished exhibition halls and transport facilities, and ancillary uses such as hotels, offices, warehouses, catering and leisure, if justified in scale and well located. Employment led development, including industrial and logistics uses, is supported, as is new housing on the campus in principle. Any loss of car parking needs a parking review. The supporting text says the NEC opened in 1976, attracts more than 7million visitors a year and generates £2billion a year in wider economic impact. Plans include an Industrial and Logistics Hub.
The human version (we wrote this, not the council)This policy supports the continued sustainable growth of Birmingham Airport as part of national aviation infrastructure and the main international gateway to the region. It supports operational development such as terminals, passenger and freight facilities, airfield works and surface access, to make the most of the extended runway. Ancillary uses such as hotels, offices and car parks are also supported if justified in scale and well located. Airport related uses beyond the boundary will be permitted where justified and where they meet other policies, including Green Belt policy, for example on site UK2. The 2018 Airport Master Plan forecast growth from 13m passengers a year in 2018 to 18m in 2033.
The human version (we wrote this, not the council)This policy supports Jaguar Land Rover (JLR) to compete and succeed in the global vehicles industry. The Council will support a broad range of development within the JLR boundary set in this plan, so it can keep or improve its role as a major vehicle maker. Site UK2 is being released from the Green Belt to meet the Borough's employment needs. This includes the needs of JLR and its component suppliers, which need a location close to the plant. The supporting text says JLR is limited in its ability to expand because it sits within the main urban area. The land at Damson Parkway will also provide local jobs.
The human version (we wrote this, not the council)This policy supports development at Birmingham Business Park within its boundary, as a prime, high quality managed employment location. Offices, light industrial, general industrial and warehousing uses are supported. Development should be well planned, keep the park attractive to investors and protect the environment. Ancillary uses such as hotels and business services are supported if their scale does not compete with facilities outside the park. The supporting text notes a 9ha allocation added in the SLP (2013). A green buffer next to homes on Coleshill Road and Blackfirs Lane will be managed and enhanced, helping a new bus link from Blackfirs Lane.
The human version (we wrote this, not the council)This section sets out the Council's vision-led approach to transport, which replaces the older 'predict and provide' method. The vision is of places where people can live without depending on their cars. Proposals should link into existing travel networks, give safe routes for active travel, help people with reduced mobility and reduce the need to travel. Proposals that generate a significant rise in trips need a transport assessment or statement and should be in sustainable locations. The section describes the transport strategy Solihull Connected (adopted 2023) and its four objectives, and the Cycling and Walking Strategy. It says no further local policy is needed beyond NDMP TR3.
The human version (we wrote this, not the council)This policy supports in principle the delivery of Metro and Sprint rapid transit lines, especially along three corridors serving the UK Central Hub. These run from Digbeth and the east of Birmingham, from Blythe Valley through central Solihull to Chelmsley Wood, and from Hall Green through central Solihull. Development in or next to these corridors will be asked to contribute to Metro or Sprint and to design in access from the start. The supporting text notes HS2 is expected to open between 2036-39, and that the HS2 Act limits how plan policies apply. It also says an alternative route for Balsall Common traffic is justified.
The human version (we wrote this, not the council)This section introduces health and wellbeing. It says the built and natural environment is a key factor in health. The health of Solihull residents is generally good, but outcomes are not equal across the Borough, and high deprivation is linked to lasting health inequalities. So the Local Plan must do more on wider factors such as housing, green infrastructure, active travel, access to services and the local food environment. The section lists the Council Plan (2025-2030), the Health and Wellbeing Strategy (2024-2032) and the Health Inequalities Strategy. Proposals should show how they help reduce health inequalities. Health Impact Assessments will be a material consideration in planning decisions.
The human version (we wrote this, not the council)This policy says the Council will work with partners to create healthier places and reduce health inequalities. Development will be supported where it shows how it improves health and wellbeing, using local evidence such as the Joint Strategic Needs Assessment. Particular emphasis will be given to development that reduces inequalities in areas with poorer health or higher deprivation, supports active lifestyles, applies Active Design principles with direct walking links, and creates safe, inclusive places. Emphasis also goes to schemes that deliver accessible homes for all ages, improve access to primary care where needed, keep air quality safe, and avoid or reduce harm from pollution, noise, overheating and social isolation.
The human version (we wrote this, not the council)This policy says relevant planning applications must be supported by a suitable Health Impact Assessment, and applicants must show how any harm to health will be dealt with. Health impact screening is needed for all major development. A Rapid HIA will normally be needed for 50 or more dwellings or non-residential schemes over 1,000 sqm. A Full HIA will normally be needed for 150 or more dwellings, or schemes over 5 hectares. Major housing must show there is enough health and care capacity. The section also covers hot food takeaways, air quality, open space and sport, and notes that four new sports hubs should be brought forward.
The human version (we wrote this, not the council)This section sets out why the historic environment matters to the Borough's character and civic pride. It lists features that add most to local character, including the historic core of Solihull Town Centre, the Mature Suburbs, the Arden landscape and historic villages such as Berkswell, Barston and Temple Balsall, and the canal and railway network. The Council's strategy is to sustain and enhance heritage assets and tackle risks from neglect and decay. It will keep a Local Heritage List, Conservation Area Appraisals and Management Plans, and a public Historic Environment Record. National policies HE4 to HE10 provide the basis for judging applications.
The human version (we wrote this, not the council)This policy supports a network of waste facilities that manages waste as high up the waste hierarchy as practical and meets identified needs. New or extended waste, recycling and recovery facilities will be supported if they meet a set of criteria. These include reuse or recycling of waste, low greenhouse gas emissions, suitable location and scale, and safe access to roads. Proposals must avoid unacceptable effects such as noise, dust, odour, litter and flood risk, and must not harm the safe operation of Birmingham Airport. Green Belt proposals will be judged against the NPPF. Expanding and modernising the existing HWRC at Bickenhill is supported in principle.
The human version (we wrote this, not the council)This policy says major development on allocated sites, broad locations or areas identified for significant growth must follow a comprehensive masterplanning approach. Applications must show how they fit an approved masterplan, or help build a framework for the wider site where none exists. They must support, not prejudice, adjoining land and later phases, and provide or contribute to the infrastructure the wider area needs. They must show how engagement shaped the plans. Where an application covers only part of a larger site, extra evidence is needed on how the rest can be developed and joined up. Proposals that fragment or compromise wider delivery will not be supported.
The human version (we wrote this, not the council)This policy says major development is expected to provide, or pay towards, measures that reduce its impact, plus the infrastructure it needs. The Council may use planning obligations, pool contributions and collect the Community Infrastructure Levy. Schemes that cannot meet policies on viability grounds need a detailed Viability Assessment. The text explains contributions for education, healthcare, sports hubs, public transport, travel plans and police. Sports hubs are planned to serve Balsall Common, Blythe, East of Solihull and Knowle. From the last quarter of 2024 to mid-2026, at least 14 major schemes for up to 3,700 dwellings were approved, with up to £44 million in commuted sums.
The human version (we wrote this, not the council)This site allocation is for 65 dwellings at Hallmeadow Road/Riddings Hill in Balsall Common. The site was allocated in the Solihull Local Plan (2013), and the Green Belt boundary was changed then, so no policy changes are needed to bring it forward. Development should include public open space, play areas and above ground SuDS. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The Council owns the site and is seeking to sell it to a housing developer. The text then lists four broad locations for growth, BC8 to BC11.
The human version (we wrote this, not the council)This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.
The human version (we wrote this, not the council)This site allocation safeguards land shown on the Policies Map for education uses linked to the expansion or redevelopment of Arden Academy. The wider site known as KN2, Land South of Knowle, now largely has planning permission for housing. After the 2020 plan was withdrawn in October 2024, an indicative masterplan was produced and endorsed at Cabinet in December 2024. This identified 1.8 ha of land for transfer to the Council, mainly linked to 200 dwellings on land west of Warwick Road. The land is expected to be transferred in phases later this year. The text then names land around Dorridge Railway Station, KN3, as a broad location.
The human version (we wrote this, not the council)This section describes the UK Central Hub around junction 6 of the M42, which includes Arden Cross and the HS2 interchange site, Birmingham Airport, the NEC, Jaguar Land Rover and Birmingham Business Park. First HS2 trains are forecast between 2036 and 2039, with a journey time from London of 38 minutes. The Hub is expected to deliver many jobs and homes. Key needs include transport upgrades, a new primary school, and green and blue infrastructure. The Green Belt boundary will be amended to release Arden Cross (140 hectares) and land at Damson Parkway for employment and possible airport or JLR expansion.
The human version (we wrote this, not the council)This site allocation is for mixed use development at Arden Cross, including the HS2 Interchange station, commercial uses, homes, retail, higher education and a health education campus. It should be delivered through a comprehensive masterplan that improves access, creates a green and blue network and builds a clear sense of place. The masterplan should create a high density, active place around the transport hub. The c140ha site will be released from the Green Belt. The first land is expected in 2030, and 1,600 homes are expected within the plan period. To limit harm to the setting of Park Farmhouse and Packington Hall and Park, planting should protect key views.