Policy SMBC/WM1

Waste Management Facilities

On pages 102 to 103 of the official PDF.

The human version

This policy supports a network of waste facilities that manages waste as high up the waste hierarchy as practical and meets identified needs. New or extended waste, recycling and recovery facilities will be supported if they meet a set of criteria. These include reuse or recycling of waste, low greenhouse gas emissions, suitable location and scale, and safe access to roads. Proposals must avoid unacceptable effects such as noise, dust, odour, litter and flood risk, and must not harm the safe operation of Birmingham Airport. Green Belt proposals will be judged against the NPPF. Expanding and modernising the existing HWRC at Bickenhill is supported in principle.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 102

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/WM1: Waste Management Facilities 1 The Council will support the development of an efficient and sustainable network of waste management infrastructure which enables waste to be managed at the highest practicable level of the waste hierarchy, contributes towards a circular economy and provides sufficient capacity to meet identified waste management needs. 2 Proposals for new waste management, recycling, recovery and processing facilities, or for the extension or intensification of existing facilities, will be supported where the following criteria are satisfied: A The proposal contributes to an appropriate network of waste management facilities and, where relevant, addresses an identified need for additional or replacement waste management capacity; B Facilitates the beneficial reuse, recycling or recovery of waste and, where appropriate, the production and use of secondary and recycled materials; C The design and operation of the facility should incorporate appropriate climate change adaptation measures that minimise greenhouse gas emissions; maximise resource and energy efficiency and facilitate the recovery and beneficial use of materials. Where practicable opportunities to utilise any heat or energy generated on site should be incorporated into the development. D Where a proposal is situated within the Green Belt, it will be considered in accordance with the policies of the NPPF . Particular regard will be given to the specific locational requirements of the proposed waste management activity; any existing onsite activity of a similar nature; and to whether a suitable alternative location outside the Green Belt is reasonably available. E The location and scale of the development must be appropriate to the proposed waste management activity. Particular support will be given to proposals which make effective use of: existing waste management sites; previously developed land; and/or land or b uildings within established employment or industrial areas where the proposed activity is compatible with neighbouring uses. F T h e r e i s s a f e a n d s u i t a b l e a c c e s s t o t h e h i g h w a y n e t w o r k a n d t h e v o l u m e , nature and routing of traffic generated can be satisfactorily accommodated without unacceptable effects on highway safety, congestion, residential amenity or the environment. This should have regard to operational hours and associated vehicle movements. G The proposal must demonstrate that it would not result in unacceptable effects upon local communities, sensitive receptors or the environment, including from: noise and vibration; dust, fumes and other emissions to air; odour; litter; vermin, insects or bi rds; artificial lighting; visual intrusion; land contamination or instability; effects upon surface water or groundwater; and flood risk. H The proposal must be capable of being satisfactorily integrated into its surroundings and must achieve a high standard of design appropriate to its context and function. This should include the appropriate consideration of landscape, ecology and heritage matters in accordance with the policies of this Local Plan, any respective Neighbourhood Plan and the NPPF . I The proposal should demonstrate that aviation safety and the safe operation of Birmingham Airport would not be adversely affected. 3 When considering the above points, the Council will have regard to the type and scale of the facility and the potential for impacts to occur throughout construction, operation and, where relevant, restoration. 4 Opportunities to expand and modernise the existing HWRC at Bickenhill will be supported in principle. The detailed design of the new facility will be considered against the appropriate criteria set out in part 2 of this policy. The site is considered to already satisfy the location requirements of part 2D of this policy. 5 Where the development is temporary, or where restoration will ultimately be required, proposals must provide for the timely restoration and appropriate after-use of the site to a high environmental standard. Where necessary, satisfactory arrangements for implementation, aftercare and long-term management will be secured by condition.
Climate & energyInfrastructure & utilitiesTransport & travel📍 Bickenhill📍 Birmingham Airport
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.