This section explains the overall Development Strategy, which directs large-scale growth to the most sustainable locations. Seven spatial options were narrowed through consultation to a hybrid strategy based on sustainable travel and the economy, and three priority areas were mapped using proximity to urban land, rail and bus stops, jobs and community needs. Growth broadly follows the A46 corridor and is focused on a small number of strategic sites and new settlements. Because many sustainable locations sit in the Green Belt, the plan carefully releases some Green Belt land.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
the first instance.
2.5 Development Strategy
Policies within this section contribute to achieving all of the Strategic Objectives
(SO)
2.5.1 The Development Strategy sets out in broad terms the locations to which large
scale and strategic growth should be directed; and conversely, those areas in which
growth should be more controlled. In practical terms, the Development Strategy will
help deliver the SWLP’s five overarching principles, determine where land
is allocated for homes and employment uses, and the infrastructure and open space
that supports this growth. In the SWLP , sustainability is achieved by:
• utilising available urban brownfield land
• building at densities that make efficient use of land
• using locations which are within reach of existing facilities, or providing new
facilities on site
• allowing for smaller-scale growth outside of strategic areas
2.5.2 The Development Strategy will accommodate South Warwickshire’s housing and
employment needs for the period to 2050. Figure 11 shows the priority areas that
were identified to inform the preparation of the Development Strategy. The background
to the development of the Priority Areas and subsequent selection of sites is set out in
the accompanying Growth Strategy Topic Paper. The starting point for was
the initial Scoping and Call for Sites consultation in 2021 that listed 7 spatial options,
which were then refined through public consultation into 5 options before the hybrid
strategy of sustainable travel and economy was agreed as the most appropriate
approach for South Warwickshire.
• Option A: Rail Corridors.
• Option B: Main Bus Corridors.
• Option C: Main Road Corridors.
• Option D: Enterprise Hubs
• Option E: Socio-economic
• Option F: Main Urban Areas
• Option G: Dispersed
2.5.3 This preferred option was further refined into preferred locations informed by
accessibility and connectivity technical work and the development of a spatial tool that
combines sustainable travel and economic factors to identify the most suitable
locations for development. This tool utilises buffer-informed proximity to the following
characteristics:
• Urban land ~ prioritised in accordance with NPPF and the substantial weight
given to the use of brownfield land.
• Sustainable Transport ~ Proximity to rail and bus stops is considered to be a key
indicator of locations for growth, providing residents with sustainable options by
shifting trips away from the private car.
• Economic Co-location ~ locating growth near existing employment sites allows
for sustainable commuting opportunities by placing homes in proximity to
potential places of work.
• Socioeconomic Improvements ~ This reflects the aspiration
to leverage development to deliver community infrastructure that improves
access to potential places of work.
2.5.3 As a result of this exercise, as shown in Figure 11, three priority areas have been
developed as an overarching spatial tool for site selection, with Priority Area
1 typically indicating more sustainable locations and Priority Area 3 indicating less
sustainable locations.
Figure 11: Spatial Growth Strategy Priority Areas
2.5.4 The approach takes account of the spatial drivers of development. Internally,
these include the urban areas within South Warwickshire. Externally, South
Warwickshire faces various directions but is most strongly aligned with Coventry as well
as Birmingham and Solihull (far less so the Black Country). South Warwickshire is also
influenced by London. The stronger interrelationships are therefore to the north and this
is reflected in the Development Strategy which is summarised in the SWLP Key Diagram
(Figure 12 overpage). A particular focus of the SWLP is on growing and diversifying the
local economy which is an integral component of the wider Coventry and Warwickshire
sub-region, with particular focus on automotive, advanced manufacturing and
engineering and research and development. Again, the Development Strategy aligns
with this ambition and seeks to couple locations of new homes and jobs into a core
area that reflects the identified priority areas. Broadly speaking the SWLP follows the
wider A46 corridor - a key national route that runs southwest-northeast and ultimately
connects Bristol, Gloucester, Cheltenham, Tewkesbury, Worcester, Evesham, Stratford-
upon-Avon, Warwick/Leamington, Kenilworth, Coventry and Leicester.
2.55 The Development Strategy has flowed from the earliest iterations of the SWLP
and reflects its vision of achieving sustainable development whilst strengthening local
communities and responding to the climate emergency. It does this by locating the
majority of development in places that can be accessed by means other than the
private car. Growth is focused on a small number of strategic allocations, including new
settlements, so as to ensure that the necessary infrastructure can also be
provided, benefitting both new and existing residents alike. The new settlements also
provide the foundation for sustainable growth beyond 2050, providing certainty to
communities in the long-term as well as enabling a continuation of housing delivery
across South Warwickshire. The strategic locations also provide for employment and
jobs, with many co-located to again reduce the need to travel and achieve balanced
sustainable communities. Key employment sites are also safeguarded to help further
grow the South Warwickshire economy. The focus on strategic growth locations
also helps to preserve the wider rural character and landscapes of South Warwickshire,
by rightly limiting growth in these more sensitive and inaccessible locations. The SWLP
does however seek to strike a balance by allowing some growth to maintain the vitality
of rural villages and support the rural economy.
2.5.6 Parts of South Warwickshire fall within the West Midlands Green Belt, the
fundamental aim of which is to prevent the sprawl of the West Midlands conurbation, by
keeping land permanently open. Notwithstanding this, some of South Warwickshire’s
most sustainable locations fall within the Green Belt. For example, all of our train
stations are either in or close to the Green Belt. The SWLP has therefore had to strike a
careful balance between maintaining the Green Belt and carefully releasing land from
the Green Belt to meet our development needs in the most appropriate locations. The
justification for releasing la