← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM10.4

Policy DM10.4

Telecommunications

On page 231 of the official PDF.

The human version

This policy sets out when telecommunications development will be supported where planning permission or prior approval is needed. A new mast is only supported if there are no suitable existing masts, buildings or other structures, including those used by other operators. New or extended equipment, including on street cabinets, must be designed and sited to limit visual impact and respect the character of the area. Effects on other electronic devices, noise, airspace for drones and aircraft, and highway safety must be addressed. Fibre to the Premise (FTTP) is expected for all new premises, unless covered by Building Regulations or shown not to be viable or feasible.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 231

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM10.4: Telecommunications 1. Where planning permission, including prior approval, is required, proposals will be supported where: i. if a new mast is proposed there are no suitable existing masts, buildings or other structures, including those used by other operators, where the proposed apparatus could be operated; ii. the design and siting of any new or extended infrastructure, including on street cabinets, seeks to minimise and mitigate visual impact and respects the character of the building or area in which it is located; iii. the siting of the proposed apparatus and associated structures minimises impacts on the operation of other electronic devices within the surrounding area; iv. any other impacts, including noise and impact on airspace for drones and other forms of aircraft, highway safety are addressed; v. supporting documentation is proportionate but related to the location. 2. Fibre to the Premise (FTTP) provision will be expected for all new premises (residential and non-residential) unless this is already covered by Building Regulations. Exceptions to this policy on the basis of viability or feasibility of making such provision should be supported by evidence to the satisfaction of the Council.
Infrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.