← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend Plan Explorer

Infrastructure & utilities

The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.

393 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.

The human version (we wrote this, not the council)This section sets out the vision and strategic objectives for the Local Plan. It draws on the Southend City Vision, 'Our City, Our Future', which looks to 2035. The long term vision is of a prosperous, well connected and sustainable "City by the Sea" with distinct neighbourhoods and a cherished coastal identity. There are 24 strategic objectives, grouped under themes from a city that is healthy and safe to a city that is connected and smart. They include an 'infrastructure led' approach, complete neighbourhoods, a choice of homes, a regenerated City Centre, more green space and the growth of London Southend Airport.

The human version (we wrote this, not the council)This policy, Strategic Policy SP1, sets out the Spatial Principles that all new development must follow where relevant. Development should be served by the infrastructure it needs, using an 'infrastructure led' approach. It should make the best use of previously developed land and minimise the use of greenfield land. The openness of the Green Belt will be protected. The policy supports tourism, culture and economic growth at the City Centre, London Southend Airport and the employment areas. It also asks for good design, sustainable travel, support for existing centres, resilience to climate change, protection of heritage, net gains in biodiversity, and care over unstable land.

The human version (we wrote this, not the council)This policy, Strategic Policy SP2, sets out where growth will go in Southend. The Local Plan provides for 14,700 new homes and 68,400sqm of employment space to 2045. The main focus is Southend Central Area, with 3,600 additional homes, and Land North of Southend, with a new neighbourhood of 4,900 homes. Other growth areas are Fossetts, with around 1,350 new homes, the Seafront, Shoeburyness, London Southend Airport and environs, and Priority Urban Areas such as Leigh, Westcliff and the A13 corridor. Airport jobs will be split 50-50 with Rochford District Council. New development must enhance local character and the sense of place.

The human version (we wrote this, not the council)This site allocation, Policy DM2b, allocates land north of Southend at Bournes Green, shown as BG001 on the Policies Map. It is for a minimum of 4,900 new homes, including 45% affordable housing and at least 150 self-build or custom-build plots, plus at least 12,500 sqm of employment floorspace. It must provide transport mitigation, new primary and secondary schooling, a purpose built primary care facility, a country park, sports pitches and a Golf Impact Assessment. Development must protect the Essex Coast Habitats Sites, with at least two seasons of wintering bird surveys. The text says exceptional circumstances justify removing this land and Fossetts Farm (HEA264) from the Green Belt.

The human version (we wrote this, not the council)This policy, Strategic Policy SP3, makes sure new development is backed by the infrastructure it needs. Infrastructure must be phased with new homes through an 'Infrastructure Led Approach' and must not overload what already exists. Required infrastructure includes highway upgrades, sustainable transport, more school places, healthcare, emergency services, Protected Green Space, broadband, sewer network improvements and flood prevention. The Council will use planning obligations to secure provision or money from developers. It will review the Southend Community Infrastructure Levy and may use compulsory purchase powers. The text notes problems such as Victorian sewers and parts of the Leigh electricity network operating close to capacity.

The human version (we wrote this, not the council)This section introduces the chapter on healthy lifestyles and wellbeing. Southend faces public health challenges and an ageing population. Life expectancy is around 10 years lower in the most disadvantaged areas than in the least disadvantaged. Healthy life expectancy is estimated at 61.3 years for males and 61.4 years for females. Nearly 1 in 4 adults are physically inactive, and around 26% of 4-5 year olds and 36% of 10-11 year olds are overweight or living with obesity. The section explains how planning can help, for example through safe play spaces, active travel networks, flexible homes and avoiding pollution and flood risk.

The human version (we wrote this, not the council)This policy, Policy DM4.1, supports a network of community facilities to help create healthy and complete neighbourhoods. New or improved facilities should be well designed, safe, inclusive and accessible to all. Existing facilities such as community centres, libraries, pubs, places of worship, health facilities, schools and theatres are protected. Their loss is only accepted if the community no longer needs them and alternatives exist, or if the use is no longer financially viable. This must include at least a 1-year active marketing exercise. New homes near such facilities must follow the agent of change principle. The policy also supports more space for burials and cremations, including green burials.

The human version (we wrote this, not the council)This policy, Policy DM4.2, supports new and improved sport and recreation facilities in line with local assessments of need. Planning obligations will be sought where new development creates or adds to local shortages. New or replacement facilities should be safe and inclusive, including changing rooms, and reachable by walking, cycling and public transport. Community Use Agreements will be needed to secure wider community use. Loss of outdoor sports facilities, children's play space or other sports land is only allowed if there is a surplus. The other option is equal or better replacement facilities in accessible places. New investment should follow the Built Facilities Strategy and Playing Pitch Strategy.

Policy SP5

Homes

pp. 57–67

The human version (we wrote this, not the council)This policy, Strategic Policy SP5, plans for 14,700 net dwellings to 2045. These are split between Southend Central Neighbourhood (3,600), Land North of Southend (4,900), Fossetts Farm (1,350), other neighbourhoods (1,850) and windfall (3,000). Delivery is stepped: 365 dwellings a year in 2025-2030, 655 in 2030-2035 and 960 in 2035-2045. Homes will come from existing permissions, site allocations, opportunity sites and windfall. Affordable housing is required on all sites of 10 or more dwellings, and the loss of homes will be resisted. No need for gypsy or traveller pitches is identified, but criteria are set for any future application.

The human version (we wrote this, not the council)This policy, Policy DM5.1, sets how much affordable housing new schemes must provide. Schemes of 10 dwellings or more must provide at least 30% affordable or key worker homes. The rate is 10% for brownfield flatted development in Value Area 1, which covers Westcliff, Prittlewell, Southend Central, Southchurch, Fossetts and part of Shoeburyness. Build to Rent schemes must provide at least 20%. Provision should normally be on-site. The Council will seek 80% as affordable housing for rent, with the rest as affordable home ownership. As a guide, this means 40% social rent, 40% affordable rent and 20% other ownership products.

The human version (we wrote this, not the council)This policy, Policy DM5.2, promotes a wide choice of homes to create mixed, balanced and inclusive communities, including family housing. Proposals for 10 or more dwellings must provide a mix of home sizes and types. This should have regard to the latest Housing Needs Assessment, as set out in Policy Table DM5.2. Where a proposal moves well away from this mix, the reasons must be justified. High density flatted schemes in highly accessible places may include more smaller units, but should still include some family sized homes. More suburban areas should provide a larger share of family housing than the preferred mix.

The human version (we wrote this, not the council)This policy, Policy DM5.4, controls the conversion of houses into smaller self-contained flats. Conversions are only allowed if the floor area is at least 124sqm or the home has four or more bedrooms. At least one new unit must be suitable for a family, with a minimum of three bedrooms. Schemes must meet Policy DM5.5 and must not harm living conditions, the look of the building or area, or a street's function. Parking standards in Policy DM10.3 must be met. The family unit is not needed where a different mix is essential for a listed building, for existing occupants who will remain, or for people with special housing needs.

The human version (we wrote this, not the council)This policy, Policy DM5.6, manages Houses in Multiple Occupation (HMOs) and other shared housing. Turning large sui generis HMOs back into family homes is allowed. New HMOs are only permitted if they would not make up over 10% of homes within a 50 metre radius. They must not sandwich a normal home between two HMOs or create a run of three or more HMOs. They must not cause harm through noise, on street parking, building alterations or poor bin and cycle storage. They must meet the Essex HMO Amenity Standards. The Council will investigate Article 4 Directions to control conversions of homes into small HMOs for three to six people.

The human version (we wrote this, not the council)This policy, Policy DM5.7, aims to provide enough housing for older people to live independently for as long as possible. New schemes must meet an identified need, be targeted at local residents and show there is no existing capacity in Southend. They must not create an over concentration of similar uses. They need good access to transport and services, suitable care, space for carers and visitors, and communal areas, including space to grow food. A 6-month marketing exercise should target people with a local connection. Loss of older people's housing is only allowed if it is surplus, outdated, residents can move elsewhere in the city, or better provision replaces it.

The human version (we wrote this, not the council)This policy, Policy DM5.8, supports a suitable range of housing for people with specialist and vulnerable needs. It covers supported housing not dealt with by Policy DM5.7. Permission will be granted where the scheme meets a demonstrable need in the city and is targeted at local residents, through a 6-month marketing exercise. It must be well designed, safe, accessible and suitable for the people who will live there, with facilities for carers and visitors. It must meet the standards in Policy DM5.5 or Care Quality Commission standards. Loss of such housing is only allowed if it is surplus, cannot meet modern standards, or will be replaced by better provision.

Policy DM5.9

Co-Living

p. 92

The human version (we wrote this, not the council)This policy, Policy DM5.9, sets criteria for co-living schemes, which are large purpose-built shared living blocks. They must be in well connected places with frequent public transport, with Southend Central Area as the main focus. Schemes must be under single management, with all units for rent on tenancies of at least three months. They must provide a communal kitchen, indoor and outdoor communal space, storage, a concierge, laundry and room cleaning. Each unit must have 18-27sqm of living space per person and a window. A management plan is required, plus an affordable housing contribution equivalent to at least 30% of the total number of units.

The human version (we wrote this, not the council)This policy, Policy DM6.1, supports new employment development that promotes sustainable economic growth. Schemes should add to the amount and quality of employment land, floorspace and jobs in the city. Southend City Centre and Southend Central Neighbourhood will be the main location for major economic growth. To attract investment, employment schemes in the key Economic Sectors listed in Policy Table DM6.1 will mainly be directed to the matching Priority Locations. They can also go to the rest of Southend's Employment Areas listed in Policy DM6.3a. Schemes must be of the right type, scale and character, and any exceptions will be considered on an individual site basis.

The human version (we wrote this, not the council)This policy says all major residential developments must provide public open space, on site where possible, or else make a financial contribution. Developers should provide for long-term upkeep. Public open space can only be lost if a replacement of equal or better quality and size serves the same area. New green space, play space, food growing and better walking and cycling access are strongly encouraged. Developments should protect habitats, support the Essex Nature Recovery Strategy and use nature-based SuDS where they can. Allotments can only be redeveloped if no longer needed or replaced. The Council will also support countryside recreation, more footpaths and horse-riding routes, and better local play areas.

The human version (we wrote this, not the council)This policy protects and enhances Southend's ecological network, focusing nature recovery on the priorities in the Essex Local Nature Recovery Strategy. Developments likely to harm European Designated Sites must meet the Habitats Regulations, with strategic mitigation through RAMS. Proposals must protect important habitats and species, with ecological surveys where designated sites may be affected. Applicants must show they first avoided harm, then reduced it, restored habitats and finally compensated for what remains. Irreplaceable habitats such as ancient woodland will be protected, and harm to Local Wildlife Sites is only allowed in strict cases. Qualifying developments must deliver 10% biodiversity net gain using the DEFRA metric, with on-site gains preferred.

The human version (we wrote this, not the council)This policy says all development should be energy and resource efficient and take a fabric first approach, building in energy saving from the start. New homes should use no more than 110 litres of water per person per day, falling to 100 litres by 2030 and 80 litres by 2035. Non-household schemes should aim for at least 3 credits under BREEAM measure WAT01. New buildings must meet future homes and building standards, cut energy demand first, then add renewable energy. Energy upgrades to existing buildings are encouraged if heritage is not harmed. Proposals must show how they reduce embodied carbon, putting reuse of existing buildings first.

The human version (we wrote this, not the council)This policy sets out how people and the environment will be protected from pollution. Building on or near contaminated land needs a Contaminated Land Assessment and suitable clean up secured by planning condition. Near the cliff frontages, schemes must show they can be built and used safely without making the land less stable. New development should not break legal air quality limits, and major schemes need an Air Quality Assessment. Schemes that harm water quality will be refused unless mitigated. New homes near existing noise must follow the 'agent-of-change' principle and must not threaten valued uses such as pubs and music venues. Major schemes need a Noise Impact Assessment.

The human version (we wrote this, not the council)This policy says all development should avoid areas at risk of flooding and give evidence for the Sequential Test. Schemes must use Sustainable Drainage Systems (SuDS) so peak flows after development are no higher than before, using nature-based solutions where possible. Surface water must never go into a separate foul sewer, and infiltration SuDS are only allowed where they pose no risk to water. Sites at risk of flooding need a Flood Risk Assessment covering all sources, with more vulnerable uses placed where risk is lowest, safe escape routes, and habitable floors above the design flood level. Coastal schemes must allow flood defences to be maintained and raised.

The human version (we wrote this, not the council)This policy seeks a 'step change' in transport, working with partners on a modern integrated system. Developments must contribute to improvements in the Southend Infrastructure Delivery Plan and Local Transport Plan where related and necessary. New development must provide for walking, cycling, public transport and new highways. This includes improving the A127/A1159 corridor, better access to places such as Bournes Green New Neighbourhood, Fossetts Farm and London Southend Airport, and high-quality interchanges at places like Leigh Railway Station. Other aims include better buses, use of the River Thames and electric and hydrogen vehicle charging. Large traffic generating schemes will go to well served areas near the City Centre.

The human version (we wrote this, not the council)This policy says development should be located and designed to improve health and wellbeing, encouraging walking, cycling and public transport and reducing reliance on private cars. Designs should put pedestrians, cyclists and public transport users first, with walking and cycling routes usable by first occupation. Access and traffic should not cause undue harm to the street scene, neighbours or highway safety. Schemes creating high travel demand should help fund off-site improvements such as bus priority measures. Proposals should show the network can cope, backed by a Transport Statement and Travel Plan Statement, or a Transport Assessment and full Travel Plan. Better railway stations, forecourts and step-free access will be supported.

The human version (we wrote this, not the council)This policy says all development should meet the parking standards, including cycle parking, in Appendix 9. Residential standards may be applied flexibly in sustainable locations with frequent public transport, or where strict use would harm local character. On-street parking is only acceptable where the applicant shows there is capacity. Proposals must put pedestrians, disabled people and cyclists first, with safe, secure and covered cycle parking. Major schemes must provide safe access to public transport and for emergency vehicles. Car Club parking is supported, especially in car free or car lite schemes. Vehicle crossovers should not harm highway safety. A 'Park and Ride/Rail' is supported if it meets set requirements.

Policy DM10.4

Telecommunications

p. 231

The human version (we wrote this, not the council)This policy sets out when telecommunications development will be supported where planning permission or prior approval is needed. A new mast is only supported if there are no suitable existing masts, buildings or other structures, including those used by other operators. New or extended equipment, including on street cabinets, must be designed and sited to limit visual impact and respect the character of the area. Effects on other electronic devices, noise, airspace for drones and aircraft, and highway safety must be addressed. Fibre to the Premise (FTTP) is expected for all new premises, unless covered by Building Regulations or shown not to be viable or feasible.

The human version (we wrote this, not the council)This section introduces the chapter on London Southend Airport. It says there has been an airfield on the site for over 100 years, and in the 1960s it was the 3rd busiest airport in the UK. The airport straddles the boundary between Rochford District Council and Southend City Council. It is a key employer, with 87% of staff living in the SS postcode area. A Joint Area Action Plan with Rochford sets the planning framework to 2031. In 2019 it had over 2.1 million passengers. Covid cut numbers by over 90%, but they are predicted to exceed pre-covid levels by 2026-27.

Policy N2

Leigh

pp. 253–255

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Leigh. New development must support healthy lifestyles and be matched by needed infrastructure. Existing homes, including family housing, should be safeguarded, and good quality windfall schemes are welcomed along the A13 Key Passenger Transport Corridor and in District and Neighbourhood Centres. It supports economic growth, including at Leigh Port, shops in Leigh District Centre, and visitor facilities around Leigh Old Town. Conservation Areas will be conserved. It seeks urban greening, better play space and tree planting. Transport aims include a Mobility Hub at Leigh Railway Station and better walking and cycling routes, including London Road and the Cinder Path.

The human version (we wrote this, not the council)This policy covers the homes around the City Centre and seafront in Southend Central. It supports new homes, including windfall sites and higher densities, matched by the infrastructure needed. It seeks a balance on homes in multiple occupation. It supports more homes, live work units, community and cultural uses near The Old Waterworks on North Road, and mixed use schemes on Sutton Road. Street improvements are planned for the Clifftown, Milton and Shorefields Conservation Areas, Sutton Road, Queensway, North Road and the Kursaal (Woodgrange) Estate. Policy N5ci allocates five sites, including Sutton Road for about 125 homes and 53 to 57 Sutton Road for about 50.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.