What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy DM8.2: Urban Greening Factor
1. Proposals for major development must apply an Urban Greening Factor (UGF) to provide a measurable increase in urban greening within the red
line boundary of the planning application, in accordance with the surface cover types and factor scores set out in Appendix 8.
2. Developments should meet a target UGF score of 0.4 for residential developments and 0.3 for commercial developments.
3. Developers are expected to meet the target UGF scores. In case of a shortfall, developers are required to provide justification of the specific
constraint to delivery. If the target is not met, the developer should secure offsite greening in the immediate vicinity of the site through planning
conditions and/or planning obligations.
4. Urban Greening Factor scores should be calculated as follows:
i. assign each surface cover type within the red line boundary a score in accordance with Appendix 8;
ii. measure the area of each surface type in square metres;
iii. for each surface type multiply the area by the factor score e.g. 2 sqm of amenity grass land x 0.4 = 0.8;
iv. add the scores together for each surface type;
v. divide the combined score by the total site area (square metres) to determine the UGF score for the proposal.
5. Any areas unchanged by the proposal, e.g. retained grassed areas, should be included in the calculation. Where a surface cover type is not
included in Appendix 8, the application should identify and use the nearest relevant factor score. Vertical surfaces such as green walls can be
included but should not be added to the site’s total area.
6. Urban Greening Factor calculations should be submitted as a separate drawing including colour coding or other method to identify each surface
type and their contribution to the overall UGF score, and a table showing the calculations.
*Major development is defined in the NPPF as: For housing, development where 10 or more home will be provided, or the site has an area of
0.5 hectares or more. For non-residential development, it means additional floorspace of 1,000sqm or more, or a site of 1 hectare or more, or as
otherwise provided in the T own and Country Planning (Development Management Procedure) (England) Order 2015.
Southend Foreshore – development
management policy
Reference to Strategic Objective and Strategic Policies
Strategic Objective 7 Strategic Objective 10 Strategic Objective 15
Strategic Objective 18 Strategic Policy SP8
Why we need this Policy
8.25 Southend’s residents benefit from their close relationship with
the River Thames, and the seafront is a major tourism and leisure
resource. The offer ranges from informal recreation along an
extensive promenade, to major tourism attractions within the
Central Seafront area, including the Grade II listed Pier, theme park,
arcades, and cafes, while water sport activities are present along
the length of the foreshore. The entire foreshore is also important as
a habitat for bird species, with five internationally designated sites
for nature conservation covering the intertidal part of the Thames
Estuary. These sites support a wide range of bird species, providing
overwintering feeding grounds.
8.26 As such, the complex range of activities taking place within and
adjacent to the foreshore must be considered in a holistic manner
to ensure that environmental and heritage assets are protected
without adverse impact on their purpose and integrity.
8.27 By 2050 there is likely to be 59% more winter rainfall and once a
century sea level events could become annual events by 2100. 99
Significant lengths of the seafront and adjacent homes and business
99 Thames Estuary 2100 (TE2100) - GOV.UK
100 https://www.gov.uk/government/publications/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2
premises are protected from tidal flooding by sea defences. The
Central Seafront area in particular includes areas at higher risk
of surface water flooding when periods of heavy rainfall coincide
with high tides and where gravity discharge to tide via drainage
outfalls is constrained or tide locked. The ‘riverside strategy’
approach advocated by the Environment Agency aims for upgrades
of coastal defences to be integrated into wider development and
enhancement of the riverside.
8.28 The National Flood and Coastal Erosion Risk Management
Strategy for England (2020) 100 aims to better manage the risks
and consequences of flooding from rivers, the sea, groundwater,
reservoirs, ordinary watercourses, surface water and sewers and
coastal erosion and making greater use of nature-based solutions
that take a catchment-based approach to both floods and droughts.
The Southend-on-Sea Shoreline Management Plan (2019) provides
a strategy for the next 100 years, to maximise the reduction of
coastal flood and erosion risk to properties and infrastructure at
significant or very significant risk of flooding as a result of climate
change, in support of the Essex and Suffolk Shoreline Management
Plan (2010) and Thames Estuary 2100 Plan (TE2100) (2012) and
subsequent reviews.
8.29 The c2c line runs between Hadleigh and Leigh through Hadleigh
Marshes, through an area at risk of tidal flooding. The TE2100 Plan’s
preferred tidal flood risk management policy for the Hadleigh
Marshes policy unit is to maintain flood defences at their current
level, accepting that the flood risk will increase. The Council will
seek to ensure, in collaboration with Network Rail, railway operators
(currently c2c), the Environment Agency and other partners, the
continued resilience of this vital transport route during the plan
period and beyond, considering the long-term impacts of climate
change. A partnership approach is essential as any interventions in
this policy unit will need substantial external financial contributions
to progress to delivery under the current (August 2025) DEFRA
funding and arrangements. The TE2100 Plan’s preferred tidal flood
risk management policy for the Leigh Old Town to Southend-on-
Sea policy unit is to take further action to keep up with climate and
land use change so that flood risk does not increase. Southend-on-
Sea City Council will work with the Environment Agency and other
partners to implement the capital works required.
8.30 The Council is not responsible for planning beyond the coastal
mean low water mark. However, all developments providing
sea-based activities (such as jet skiing, surfing, or boat facilities),
including above mean high-water springs, where both terrestrial
and marine habitats have the potential to be impacted should take
account of the South East Marine Plan, in line with the principles of
integrated coastal zone management. 101 Certain activities carried out
within the UK marine area may also require a marine licence.
8.31 Water recreation has increased in popularity in Southend,
particularly since the covid-19 pandemic, and the Estuary is used
by local groups and individuals and visitors for a variety of water
sports all year round, including yachting, windsurfing, stand-up
paddle boarding, swimming, and jet-skis. There is also a segregated
cycle path along most of the seafront (with shared space in some
of the busiest sections), and the King Charles III England Coast
101 South East Inshore Marine Plan (June 2021) https://assets.publishing.service.gov.uk/media/60f6f6dde90e0764ccfbd836/FINAL_South_East_Marine_Plan__1_.pdf
Path, a signed walking route along the foreshore providing almost
continuous public access along the coastline.
8.32 The historic environment plays an important role in the
development and continued success of Southend as a coastal
destination, beginning with the establishment of Royal Terrace in the
Georgian period, and improved access by rail for day trips during
the 19th Century to visit the seafront, amusements, and the Grade II
listed Pier. There are several Conservation Areas (CAs) adjacent to
the 7-mile length of the seafront from the working port at Leigh Old
Town Conservation Area to the former military Shoebury Garrison
Conservation Area, each with their own unique character.
8.33 The continued regeneration and sustainable development of
Southend’s foreshore is a key objective of the Local Plan (Strategic
Objective 10), including making more effective connections between
Southend High Street and the seafront. The Council’s tourism and
cultural strategies also seek to promote other parts of the seafront,
including East Beach and Old Leigh as visitor destinations, as well
as the Central Seafront area. Leigh Port is an active fishing port and
centre for maritime activities, and supports the tourism, retail and
hospitality sectors. It remains an ambition to enhance the condition
of the Cinder Path between Old Leigh and Chalkwell Station, part
of the Sustrans National Cycle Network and more recently the
King Charles III England Coast Path, as a route for pedestrians and
cyclists (see also Policy N2: Leigh Neighbourhood), as part of the
wider South Essex green and blue infrastructure network.
8.34 The cumulative (or “in combination”) impact of growth is being
addressed through the Essex Coast RAMS partnership, to alleviate
pressure on designated habitats. New housing in the area is likely
to increase the level of disturbance because of the additional visitor
pressure on coastal sites. Developers will therefore need to pay a
tariff if their new development is within a ‘Zone of Influence’ around
a designated site. The Essex Coast RAMS Strategy and technical
advice note102 sets out the justification for the tariff and the range of
mitigation measures that will be taken.
8.35 Some housing schemes, particularly those which are large in scale
or located close to a designated Habitats site boundary, may need
to provide extra bespoke mitigation, including Suitable Alternative
Natural Green Space (SANG). The local planning authority, with
advice from Natural England, will consider the mitigation requirements
for such development proposals on a case-by-case basis. SANG
should be directed away from designated sites and landscapes,
best and most versatile land, and areas at risk of flooding or coastal
erosion, where possible. SANG should be provided on site in the first
instance in accordance with Natural England guidelines or successor
document. Where this is not possible, SANG should be provided
off-site on sites identified within the Council’s SANG Strategy. There
is also a requirement for competent authorities (e.g. local authorities)
to consider the importance of functionally linked habitats in order to
ensure the integrity of designated habitats. Surveys will be required
for proposals affecting greenfield sites to establish if they support the
functionality and integrity of designated sites due to their frequent
use by qualifying species outside boundaries of designated habitats,
and consequently if appropriate mitigation measures are required.
See Policy DM2b for more details.
102 See RAMS strategy and technical advice note
103 http://www.gov.uk/government/collections/thames-estuary-2100-te2100
How the Policy Works
8.36 Proposals that may affect the foreshore area should be in
accordance with the provisions of Policy DM8.4, taking account of
the complex range of factors affecting the coastline and its use.
8.37 The TE2100 Plan 103 advocates a ‘Riverside Strategy’ approach
which emphasises the importance of partnership working on
development and coastal management, to achieve multiple
benefits for the environment and for people. This is particularly
important in Southend where an appropriate balance must be
struck between protecting environmental assets and achieving
coastal resilience, and the tourism role of the coast as an economic
driver. The Riverside Strategy will be produced for Southend in
support of Policy DM8.3 which will provide clear guidance for any
development affecting the Foreshore. Development proposals
within areas at risk of flooding must take account of the most up
to date Strategic Flood Risk Assessment with reference to Policy
DM9.4.
8.38 The historic character of the seafront will be conserved and
enhanced. New development should be appropriate to local
character and context, in accordance with the seafront character
zones set out in Policy Table DM8.3 (and as defined on the Policies
Map).
8.39 Applications where RAMS applies will be refused if a RAMS
mitigation payment has not been paid or secured as part of a legal
agreement. Applicants can also provide mitigation themselves, but
they will need to show the Council and Natural England that their
proposed measures will fully safeguard the habitat from the impact of their development. A technical advice note provides more guidance on
when the RAMS tariff applies and how the policy will be implemented.