← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend Plan Explorer

Old Leigh

4 sections of the plan, in document order.

The human version (we wrote this, not the council)This section sets out the vision and strategic objectives for the Local Plan. It draws on the Southend City Vision, 'Our City, Our Future', which looks to 2035. The long term vision is of a prosperous, well connected and sustainable "City by the Sea" with distinct neighbourhoods and a cherished coastal identity. There are 24 strategic objectives, grouped under themes from a city that is healthy and safe to a city that is connected and smart. They include an 'infrastructure led' approach, complete neighbourhoods, a choice of homes, a regenerated City Centre, more green space and the growth of London Southend Airport.

The human version (we wrote this, not the council)This policy, Policy DM6.5, sets the hierarchy of shopping and commercial centres. Southend City Centre comes first for retail and other uses that attract many people, as a sub-regional centre and the key driver of regeneration. Leigh and Westcliff are District Centres, and other places are Neighbourhood and Local Centres. Article 4 Direction(s) will be used to control ground floor changes from shops to homes in the City Centre and District Centres. Frontages must stay active, and betting shops, pay day loan shops and adult gaming centres must be separated by at least two units in other uses. Retail parks are promoted for larger format units.

The human version (we wrote this, not the council)This policy says major developments must use an Urban Greening Factor (UGF) to show a measurable increase in greening within the red line boundary, using the surface cover types and scores in Appendix 8. The target score is 0.4 for residential and 0.3 for commercial developments. If a scheme falls short, the developer must explain why and should secure offsite greening nearby through planning conditions or obligations. The score is found by multiplying the area of each surface type by its factor score, adding these together and dividing by the total site area. Calculations should be shown on a colour coded drawing with a table.

The human version (we wrote this, not the council)This policy protects Southend Foreshore. Development should maintain and improve designated habitats of international, European and national importance, and harmful schemes will be refused unless Habitats Regulations tests are met. Proposals should be resilient to flood risk and coastal change, must not harm the openness of the Thames Estuary or views across it, and should not restrict work on flood defences. Coastal resort schemes are supported if they keep beach space and public access, and beach huts can only be replaced like for like. Valued seafront buildings are protected under the Seafront Character Zones. Qualifying developments will contribute to RAMS, and schemes of 500 dwellings or more may need SANG.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.