1. Proposals for development should maintain and improve the integrity of designated habitats of International, European and national importance.
Individual proposals affecting the foreshore are likely to require assessment under the Habitats Regulations 2017 to ensure screening for
potential adverse impacts on internationally designated nature conservation sites in the area. Development adversely affecting integrity of
designated habitats will be refused unless Habitats Regulations tests are met.
2. Development which may affect the UK Marine Area should take account of the South East Marine Plan in assessing the potential impacts on the
marine environment. Proposals should demonstrate that they would be resilient to the impacts of flood risk, climate change and coastal change
for the lifetime of the project. Proposals that are likely to have significant adverse effects on coastal change will not be supported.
3. Development within or near to Southend Foreshore must not detrimentally impact upon the Thames Estuary’s openness or views across and
backdrops to the River Thames and Southend’s beaches.
4. Development proposals should take account of Strategic Flood Risk Assessments and Surface Water Management Plans to avoid and mitigate
flood risk and be flood resistant and resilient. Proposals should not prevent or restrict future maintenance and improvement of flood defences
and the ability to manage coastal change. Coastal defences should be renewed and/or replaced in accordance with the priorities set out in the
Shoreline Management Strategy and successor documents, including consideration for raising fixed defences in the future where required.
5. Proposals for development which enhance habitats providing flood defence or carbon sequestration are supported, where they integrate
nature-based solutions for sustainable drainage and landscaping and demonstrate how they contribute to and enhance the city’s green and
blue infrastructure network, as set out in Policy DM8.2.
6. Proposals for development that supports Southend-on-Sea as a thriving coastal resort will generally be supported where:
i. development would not detrimentally reduce the amount of beach available for public use or public accessibility to the foreshore; and
ii. where development would provide an inclusive means of access to the foreshore and would contribute to the positive appreciation of
natural resources and biodiversity of the foreshore;
iii. refurbishment and replacement of beach huts will only be permitted on a like for like basis to maintain the uniformity of height, footprint and
building line and avoid any significant change in scale or character.
Proposals for new and improved facilities, including additional slipways may be provided in appropriate locations where they do not conflict with
other beach activities, public accessibility, the general enjoyment of the foreshore and the natural environment, including designated habitat sites.
7. Proposals for development which improve walking and cycling connectivity, including links to the public right of way network will be supported.
8. Existing buildings along the Seafront that form a cohesive frontage, have an historic context or are recognised as key landmarks and/ or
contribute to a distinctive Southend sense of place will be retained and protected from development that would adversely affect, their character,
setting and the importance of the Seafront, in accordance with the Seafront Character Zones set out in Policy Table DM8.3 (and as defined on
the Policies Map). Proposals should take account of any known wreck sites or other heritage assets that may be affected.
9. Contributions from new developments that are likely to have a significant effect in combination with other developments will be secured
towards measures identified in the Essex Recreational disturbance Avoidance and Mitigation Strategy (RAMS) to mitigate the effects on
designated habitat sites. Where a development is likely to have a significant alone impact on designated habitats, bespoke mitigation may be
required.
10. New residential development, particularly close to designated habitat site boundaries or comprising developments of 500 dwellings or more,
may be required to provide project level mitigation, including Suitable Alternative Natural Greenspace (SANG) to safeguard designated habitats
from potential adverse impacts.
Policy Table DM8.3: Seafront Character Zones (defined on the Policies Map)
Seafront Character Zones Development Principles
SCZ1: Two Tree Island, Leigh
Marshes and Belton Hills
i) Maintain and enhance recreational facilities and their access to support the needs of residents and an improved
visitor offer;
ii) Protect the special character of the nature reserve including nationally significant seagrass beds;
iii) Maintain the openness and function of the Green Belt;
iv) Maintain character and appropriate building height and type along Marine Parade;
v) Manage flood risk and maintain and raise coastal defences including nature-based solutions wherever possible
and be flood resistant and resilient.
SCZ2: Leigh Port and Old
Town
i) Maintain a thriving working port and fisheries by resisting the loss of existing marine industrial activities;
ii) Enhance the leisure and tourism offer in a manner that does not compromise the marine industrial activities and
character of Leigh Old T own;
iii) Conserve and enhance the special character of Leigh Old Town Conservation Area;
iv) Maintain an appropriate balance between the working port, residential use and leisure and tourism activities;
v) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood
resistant and resilient.
SCZ3: The Cinder Path (Old
Leigh to Chalkwell Station
including Cliff Parade,
Grand Parade and Undercliff
Gardens)
i) Protect and enhance the open character and undeveloped green space, frontage and estuary views from Grand
Parade, Cliff Parade, The Gardens, Undercliff Gardens, Leigh Hill and The Ridgeway;
ii) Development should add to the overall quality of Undercliff Gardens, Grand Parade, Cliff Parade, The Gardens,
Leigh Hill and The Ridgeway, and reflect the characteristics and form of the area. Development that materially
changes the existing character, appearance and form of the area will be resisted;
iii) Conserve and enhance the special character of Leigh and Leigh Cliff Conservation Areas;
iv) Enhance the quality of the public realm and inclusive pedestrian and cycle connectivity along the cinder path
between Old Leigh and Chalkwell Railway Station, including access to and from the footbridge (‘Gypsy Bridge’);
v) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood
resistant and resilient.
Seafront Character Zones Development Principles
SCZ4: Chalkwell Esplanade
to San Remo Parade
i) Maintain and enhance the open aspect of the foreshore and beaches, promenade and landscaped areas;
ii) Replenish the beaches as the need arises to maintain and upgrade coastal defences;
iii) Ensure that established seafront architectural style and form is maintained in this location and inappropriate
frontage development is resisted;
iv) Total or partial demolition of a heritage asset will be resisted, and the special character of Crowstone and The
Leas Conservation Areas should be conserved and enhanced;
v) Preserve the vernacular form and fine urban grain of the character zone. Further amalgamation of existing plots
and large format bulky buildings will be resisted;
vi) Maintain the predominantly low-rise height of existing buildings. Development will only be allowed where it is
appropriate to the local context and where it adds to the overall quality of the area;
vii) Develop a quality promenade that incorporates the Sustrans cycle route and England Coastal Path, and
encourages sustainable access and activity along the seafront;
viii) Maintain and promote the commercial activities within the character zone;
ix) Encourage improvements to existing shelters and cafes. Refurbishment and renewal works should not impact on
foreshore views and should not unduly encroach onto the foreshore;(x) Manage flood risk and coastal defences
including nature-based solutions wherever possible and be flood resistant and resilient.
SCZ5: Central Seafront Area Refer to Policy N5b: Central Seafront.
SCZ6: Victoria Road to
Clievedon Road
i) Encourage enhancements that promote this location as a tourism and leisure destination and as a place to live;
ii) Encourage improvements to existing shelters and cafes and the rehabilitation of the Marine Activities Centre as
a centre for marine sports/restaurant/café facility. Refurbishment and renewal works should not impact on the
foreshore views and should not unduly encroach onto the foreshore;
iii) Development will be permitted where it would not be significantly out of keeping with the prevailing scale and
character of the area. The amalgamation of existing plots and large format bulky buildings will be resisted.
Seafront Character Zones Development Principles
SCZ7: Clieveden Road to
Maplin Way
i) Maintain existing built character and activities base around open spaces and beach recreation;
ii) Measures to improve the quality of beach huts including like for like replacement will be supported where this
maintains uniformity of size and building line to prevent encroachment onto the beach;
iii) Protect and enhance the green infrastructure network including connectivity between green spaces and the
seafront;
iv) Retain and enhance existing leisure activities including the tennis, bowls and yacht clubs;
v) Refurbishment and renewal works, including shelters, should not impact on the foreshore views and should not
unduly encroach upon it;
vi) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood
resistant and resilient.
SCZ8: Maplin Way to East
Beach
i) Maintain and enhance access along the coastal path for pedestrians and cyclists, and enhance connections with
Shoebury railway station;
ii) Measures to improve the quality of beach huts including like for like replacement will be supported where this
maintains uniformity of size and building line to prevent encroachment onto beach;
iii) Maintain the existing open character of East Beach and Gunners Park;
iv) Maintain and improve community facilities including shelters, cafes, seating and play facilities;
v) Preserve and enhance Shoebury Garrison Conservation Area and its setting;
vi) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood
resistant and resilient.
Biodiversity – development management
policy
Reference to Strategic Objective and Strategic Policies
Strategic Objective 4 Strategic Objective 16 Strategic Objective 17
Strategic Policy SP8
Why we need this Policy
8.40 The UK has lost almost half its biodiversity since the 1970s, 104 and
sits near the bottom of the Biodiversity Intactness Index. It is the
lowest of any G7 nation 105 and in the bottom 10% of all countries
globally, with only 50.3% of its biodiversity remaining. Southend is
densely urbanised, and land and buildings make up approximately
42% of the entire city (this includes private gardens and the intertidal
area). Quantitative evidence about loss of natural habitat in Essex is
hindered by a lack of systematic data collection 106.
8.41 The Environment Act (2021) introduced a mandatory requirement for
at least 10% biodiversity net gain (BNG) to be achieved for qualifying
developments which require planning permission. BNG aims to
create new habitat as well as enhancing existing habitat where
new development occurs, to leave biodiversity in a measurably
better state than before the development took place. It can help
mitigate climate change using “nature-based solutions 107” to address
104 www.nhm.ac.uk/discover/news/2019/october/the-state-of-nature-41-percent-of-the-uks-species-have-declined.html
105 www.nhm.ac.uk/discover/news/2020/september/uk-has-led-the-world-in-destroying-the-natural-environment.html
106 Essex Biodiversity Net Gain – Evidence for Need (ECC Place Services) (2024)
107 Nature Based Solutions can include protection, restoration or management of natural and semi-natural ecosystems and the integration of nature in and around cities. www.naturebasedsolutionsinitiative.org/what-
are-nature-based-solutions
108 Draft Essex Local Nature Recovery Strategy
109 www.southend.gov.uk/downloads/file/3557/local-biodiversity-action-plan-report-2013
wider environmental problems such as flooding, water quality
and reducing carbon emissions, and achieve greater resilience to
extremes of weather including heatwaves and flooding. Increased
biodiversity can also contribute towards place-making, creating
greener neighbourhoods that are more attractive to live, work and
do business and enhance health and wellbeing.
8.42 The Essex Local Nature Recovery Strategy 108, contributes to the
formation of the England-wide Nature Recovery Network, a national
network of wildlife rich places to increase and restore nature, and
sets out strategic opportunity areas for biodiversity enhancement.
Southend is home to a diverse range of sites of national and
international significance, which include conservation designations,
priority habitats and irreplaceable ecological features that support
the city’s biodiversity. Southend’s Biodiversity Action Plan 2013 109
identifies these.
How the Policy Works
8.43 The NPPF seeks to protect the natural environment. All
development proposals should aim to secure opportunities for
enhancing biodiversity. The focus for biodiversity gains is to:
● Protect and enhance the aquatic and terrestrial priority habitats and
species
● Create opportunities to better connect individual parks and open
spaces with green corridors to create an enhanced biodiversity
network.
● Increase access to nature for residents
8.44 Priority habitats and species are those listed under the Natural
Environment and Rural Communities Act 2006 or any subsequent
amendment to this Act. The Council will support the creation,
restoration, retention and enhancement of biodiversity in the city.
Where opportunities arise, the design of developments should
incorporate measures to enhance the biodiversity of the local area,
such as bird or bat boxes or bricks, hedgehog highways, green
or brown roofs, water features, wildflowers, tree planting or new
hedgerows. These measures should buffer existing sites and add or
improve links between existing sites. Proposals should also secure
management for long term enhancement where appropriate.
8.45 In England, biodiversity net gain is required under a statutory
framework.110 Qualifying developments will be deemed to have
been granted planning permission subject to the condition that
the biodiversity gain objective is met (“the biodiversity net gain
condition”). Some exceptions apply, including for householder
development, permitted development and self-build/custom build.
Applicants are advised to check the Planning Practice Guidance 111
for more information. T o achieve biodiversity net gain, applicants are
expected to:
● Use the latest available DEFRA Biodiversity Metric 112 to assess the
biodiversity value of the site, and identify relevant assets;
● Determine the impact of development options on the biodiversity
110 www.legislation.gov.uk/ukpga/2021/30/schedule/14/enacted
111 www.gov.uk/guidance/biodiversity-net-gain
112 Biodiversity Metric www.gov.uk/guidance/biodiversity-metric-calculate-the-biodiversity-net-gain-of-a-project-or-development
value of the site, using the Mitigation Hierarchy;
● Establish a design solution that delivers the greatest biodiversity net
gain and enhances the ecological network;
● Submit detailed solutions that demonstrate how Biodiversity Net
Gain would be delivered.
8.46 The requirements for biodiversity net gain will apply to
development projects, or components of projects, as far as the low-
water mark, including the intertidal zone. Projects, or components
of projects, in the marine environment beyond the intertidal zone
are not included within the scope of the mandatory requirements
for biodiversity net gain. Protected species, protected sites and
irreplaceable habitats will be dealt with in accordance with relevant
legislation and licensing regimes, but they must also be taken into
account as part of wider biodiversity considerations. The mandatory
biodiversity net gain process is additional to existing requirements
for Environmental Impact Assessment, Strategic Environmental
Assessment, and Habitat Regulations Assessment. There are
opportunities to align reporting so that efforts are not duplicated.
Irreplaceable habitats are excluded from the BNG metric.
8.47 The biodiversity gain condition is a pre-commencement condition:
once planning permission has been granted, a biodiversity gain
plan must be submitted and approved by the Council before
commencement of development. Submission of a draft biodiversity
gain plan with the planning application, whilst not legally required,
will assist in demonstrating prior to consent where and how the
measures will be implemented and secured. The biodiversity
gain plan must include the minimum national information
requirements113.
8.48 When evaluating biodiversity gain plans the Council will be seeking
to ensure that proposals provide good outcomes for nature, not just
achievement of the percentage BNG. Proposals will also need to
demonstrate that they provide a long-term benefit to biodiversity
that is compatible with other site uses such as recreational space
or sports pitches. Proposals should be informed by the Essex Local
Nature Recovery Strategy and any Southend specific biodiversity
evidence. Delivery of biodiversity units within the Local Nature
Recovery Strategy area will maximise ecological connectivity,
resilience and species recovery. Developers will therefore be
expected to demonstrate how biodiversity gain proposals contribute
to these strategic priorities.
8.49 Where off-site habitat measures are required, applicants must
provide UK habitat assessment surveys to agree a baseline metric
of the existing offsite habitats, conform to BNG CIEEM/IEMA/
CIRIA- Good Practice Principles for Development and seek to
deliver strategic BNG as close as feasible to the impacts of the
development. The Defra Biodiversity Metric trading rules should
also be observed.
8.50 The Council will provide further detailed guidance on BNG
setting out any local requirements for on-site and offsite habitat
enhancement or creation as well as application of the Biodiversity
Gain Hierarchy, including information required at validation, long-
term management and monitoring options, funding arrangements,
legal arrangements, and costs for any local or strategic offsetting
113 Planning Practice Guidance, Biodiversity Net Gain (paragraph 011) www.gov.uk/guidance/biodiversity-net-gain#para11
schemes. Sport England also has guidance on how habitat creation
or enhancement can be compatible with outdoor sports use.