← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM8.3

Policy DM8.3

Southend Foreshore

On pages 177 to 184 of the official PDF.

The human version

This policy protects Southend Foreshore. Development should maintain and improve designated habitats of international, European and national importance, and harmful schemes will be refused unless Habitats Regulations tests are met. Proposals should be resilient to flood risk and coastal change, must not harm the openness of the Thames Estuary or views across it, and should not restrict work on flood defences. Coastal resort schemes are supported if they keep beach space and public access, and beach huts can only be replaced like for like. Valued seafront buildings are protected under the Seafront Character Zones. Qualifying developments will contribute to RAMS, and schemes of 500 dwellings or more may need SANG.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 177

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM8.3: Southend Foreshore 1. Proposals for development should maintain and improve the integrity of designated habitats of International, European and national importance. Individual proposals affecting the foreshore are likely to require assessment under the Habitats Regulations 2017 to ensure screening for potential adverse impacts on internationally designated nature conservation sites in the area. Development adversely affecting integrity of designated habitats will be refused unless Habitats Regulations tests are met. 2. Development which may affect the UK Marine Area should take account of the South East Marine Plan in assessing the potential impacts on the marine environment. Proposals should demonstrate that they would be resilient to the impacts of flood risk, climate change and coastal change for the lifetime of the project. Proposals that are likely to have significant adverse effects on coastal change will not be supported. 3. Development within or near to Southend Foreshore must not detrimentally impact upon the Thames Estuary’s openness or views across and backdrops to the River Thames and Southend’s beaches. 4. Development proposals should take account of Strategic Flood Risk Assessments and Surface Water Management Plans to avoid and mitigate flood risk and be flood resistant and resilient. Proposals should not prevent or restrict future maintenance and improvement of flood defences and the ability to manage coastal change. Coastal defences should be renewed and/or replaced in accordance with the priorities set out in the Shoreline Management Strategy and successor documents, including consideration for raising fixed defences in the future where required. 5. Proposals for development which enhance habitats providing flood defence or carbon sequestration are supported, where they integrate nature-based solutions for sustainable drainage and landscaping and demonstrate how they contribute to and enhance the city’s green and blue infrastructure network, as set out in Policy DM8.2. 6. Proposals for development that supports Southend-on-Sea as a thriving coastal resort will generally be supported where: i. development would not detrimentally reduce the amount of beach available for public use or public accessibility to the foreshore; and ii. where development would provide an inclusive means of access to the foreshore and would contribute to the positive appreciation of natural resources and biodiversity of the foreshore; iii. refurbishment and replacement of beach huts will only be permitted on a like for like basis to maintain the uniformity of height, footprint and building line and avoid any significant change in scale or character. Proposals for new and improved facilities, including additional slipways may be provided in appropriate locations where they do not conflict with other beach activities, public accessibility, the general enjoyment of the foreshore and the natural environment, including designated habitat sites. 7. Proposals for development which improve walking and cycling connectivity, including links to the public right of way network will be supported. 8. Existing buildings along the Seafront that form a cohesive frontage, have an historic context or are recognised as key landmarks and/ or contribute to a distinctive Southend sense of place will be retained and protected from development that would adversely affect, their character, setting and the importance of the Seafront, in accordance with the Seafront Character Zones set out in Policy Table DM8.3 (and as defined on the Policies Map). Proposals should take account of any known wreck sites or other heritage assets that may be affected. 9. Contributions from new developments that are likely to have a significant effect in combination with other developments will be secured towards measures identified in the Essex Recreational disturbance Avoidance and Mitigation Strategy (RAMS) to mitigate the effects on designated habitat sites. Where a development is likely to have a significant alone impact on designated habitats, bespoke mitigation may be required. 10. New residential development, particularly close to designated habitat site boundaries or comprising developments of 500 dwellings or more, may be required to provide project level mitigation, including Suitable Alternative Natural Greenspace (SANG) to safeguard designated habitats from potential adverse impacts. Policy Table DM8.3: Seafront Character Zones (defined on the Policies Map) Seafront Character Zones Development Principles SCZ1: Two Tree Island, Leigh Marshes and Belton Hills i) Maintain and enhance recreational facilities and their access to support the needs of residents and an improved visitor offer; ii) Protect the special character of the nature reserve including nationally significant seagrass beds; iii) Maintain the openness and function of the Green Belt; iv) Maintain character and appropriate building height and type along Marine Parade; v) Manage flood risk and maintain and raise coastal defences including nature-based solutions wherever possible and be flood resistant and resilient. SCZ2: Leigh Port and Old Town i) Maintain a thriving working port and fisheries by resisting the loss of existing marine industrial activities; ii) Enhance the leisure and tourism offer in a manner that does not compromise the marine industrial activities and character of Leigh Old T own; iii) Conserve and enhance the special character of Leigh Old Town Conservation Area; iv) Maintain an appropriate balance between the working port, residential use and leisure and tourism activities; v) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood resistant and resilient. SCZ3: The Cinder Path (Old Leigh to Chalkwell Station including Cliff Parade, Grand Parade and Undercliff Gardens) i) Protect and enhance the open character and undeveloped green space, frontage and estuary views from Grand Parade, Cliff Parade, The Gardens, Undercliff Gardens, Leigh Hill and The Ridgeway; ii) Development should add to the overall quality of Undercliff Gardens, Grand Parade, Cliff Parade, The Gardens, Leigh Hill and The Ridgeway, and reflect the characteristics and form of the area. Development that materially changes the existing character, appearance and form of the area will be resisted; iii) Conserve and enhance the special character of Leigh and Leigh Cliff Conservation Areas; iv) Enhance the quality of the public realm and inclusive pedestrian and cycle connectivity along the cinder path between Old Leigh and Chalkwell Railway Station, including access to and from the footbridge (‘Gypsy Bridge’); v) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood resistant and resilient. Seafront Character Zones Development Principles SCZ4: Chalkwell Esplanade to San Remo Parade i) Maintain and enhance the open aspect of the foreshore and beaches, promenade and landscaped areas; ii) Replenish the beaches as the need arises to maintain and upgrade coastal defences; iii) Ensure that established seafront architectural style and form is maintained in this location and inappropriate frontage development is resisted; iv) Total or partial demolition of a heritage asset will be resisted, and the special character of Crowstone and The Leas Conservation Areas should be conserved and enhanced; v) Preserve the vernacular form and fine urban grain of the character zone. Further amalgamation of existing plots and large format bulky buildings will be resisted; vi) Maintain the predominantly low-rise height of existing buildings. Development will only be allowed where it is appropriate to the local context and where it adds to the overall quality of the area; vii) Develop a quality promenade that incorporates the Sustrans cycle route and England Coastal Path, and encourages sustainable access and activity along the seafront; viii) Maintain and promote the commercial activities within the character zone; ix) Encourage improvements to existing shelters and cafes. Refurbishment and renewal works should not impact on foreshore views and should not unduly encroach onto the foreshore;(x) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood resistant and resilient. SCZ5: Central Seafront Area Refer to Policy N5b: Central Seafront. SCZ6: Victoria Road to Clievedon Road i) Encourage enhancements that promote this location as a tourism and leisure destination and as a place to live; ii) Encourage improvements to existing shelters and cafes and the rehabilitation of the Marine Activities Centre as a centre for marine sports/restaurant/café facility. Refurbishment and renewal works should not impact on the foreshore views and should not unduly encroach onto the foreshore; iii) Development will be permitted where it would not be significantly out of keeping with the prevailing scale and character of the area. The amalgamation of existing plots and large format bulky buildings will be resisted. Seafront Character Zones Development Principles SCZ7: Clieveden Road to Maplin Way i) Maintain existing built character and activities base around open spaces and beach recreation; ii) Measures to improve the quality of beach huts including like for like replacement will be supported where this maintains uniformity of size and building line to prevent encroachment onto the beach; iii) Protect and enhance the green infrastructure network including connectivity between green spaces and the seafront; iv) Retain and enhance existing leisure activities including the tennis, bowls and yacht clubs; v) Refurbishment and renewal works, including shelters, should not impact on the foreshore views and should not unduly encroach upon it; vi) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood resistant and resilient. SCZ8: Maplin Way to East Beach i) Maintain and enhance access along the coastal path for pedestrians and cyclists, and enhance connections with Shoebury railway station; ii) Measures to improve the quality of beach huts including like for like replacement will be supported where this maintains uniformity of size and building line to prevent encroachment onto beach; iii) Maintain the existing open character of East Beach and Gunners Park; iv) Maintain and improve community facilities including shelters, cafes, seating and play facilities; v) Preserve and enhance Shoebury Garrison Conservation Area and its setting; vi) Manage flood risk and coastal defences including nature-based solutions wherever possible and be flood resistant and resilient. Biodiversity – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 4 Strategic Objective 16 Strategic Objective 17 Strategic Policy SP8 Why we need this Policy 8.40 The UK has lost almost half its biodiversity since the 1970s, 104 and sits near the bottom of the Biodiversity Intactness Index. It is the lowest of any G7 nation 105 and in the bottom 10% of all countries globally, with only 50.3% of its biodiversity remaining. Southend is densely urbanised, and land and buildings make up approximately 42% of the entire city (this includes private gardens and the intertidal area). Quantitative evidence about loss of natural habitat in Essex is hindered by a lack of systematic data collection 106. 8.41 The Environment Act (2021) introduced a mandatory requirement for at least 10% biodiversity net gain (BNG) to be achieved for qualifying developments which require planning permission. BNG aims to create new habitat as well as enhancing existing habitat where new development occurs, to leave biodiversity in a measurably better state than before the development took place. It can help mitigate climate change using “nature-based solutions 107” to address 104 www.nhm.ac.uk/discover/news/2019/october/the-state-of-nature-41-percent-of-the-uks-species-have-declined.html 105 www.nhm.ac.uk/discover/news/2020/september/uk-has-led-the-world-in-destroying-the-natural-environment.html 106 Essex Biodiversity Net Gain – Evidence for Need (ECC Place Services) (2024) 107 Nature Based Solutions can include protection, restoration or management of natural and semi-natural ecosystems and the integration of nature in and around cities. www.naturebasedsolutionsinitiative.org/what- are-nature-based-solutions 108 Draft Essex Local Nature Recovery Strategy 109 www.southend.gov.uk/downloads/file/3557/local-biodiversity-action-plan-report-2013 wider environmental problems such as flooding, water quality and reducing carbon emissions, and achieve greater resilience to extremes of weather including heatwaves and flooding. Increased biodiversity can also contribute towards place-making, creating greener neighbourhoods that are more attractive to live, work and do business and enhance health and wellbeing. 8.42 The Essex Local Nature Recovery Strategy 108, contributes to the formation of the England-wide Nature Recovery Network, a national network of wildlife rich places to increase and restore nature, and sets out strategic opportunity areas for biodiversity enhancement. Southend is home to a diverse range of sites of national and international significance, which include conservation designations, priority habitats and irreplaceable ecological features that support the city’s biodiversity. Southend’s Biodiversity Action Plan 2013 109 identifies these. How the Policy Works 8.43 The NPPF seeks to protect the natural environment. All development proposals should aim to secure opportunities for enhancing biodiversity. The focus for biodiversity gains is to: ● Protect and enhance the aquatic and terrestrial priority habitats and species ● Create opportunities to better connect individual parks and open spaces with green corridors to create an enhanced biodiversity network. ● Increase access to nature for residents 8.44 Priority habitats and species are those listed under the Natural Environment and Rural Communities Act 2006 or any subsequent amendment to this Act. The Council will support the creation, restoration, retention and enhancement of biodiversity in the city. Where opportunities arise, the design of developments should incorporate measures to enhance the biodiversity of the local area, such as bird or bat boxes or bricks, hedgehog highways, green or brown roofs, water features, wildflowers, tree planting or new hedgerows. These measures should buffer existing sites and add or improve links between existing sites. Proposals should also secure management for long term enhancement where appropriate. 8.45 In England, biodiversity net gain is required under a statutory framework.110 Qualifying developments will be deemed to have been granted planning permission subject to the condition that the biodiversity gain objective is met (“the biodiversity net gain condition”). Some exceptions apply, including for householder development, permitted development and self-build/custom build. Applicants are advised to check the Planning Practice Guidance 111 for more information. T o achieve biodiversity net gain, applicants are expected to: ● Use the latest available DEFRA Biodiversity Metric 112 to assess the biodiversity value of the site, and identify relevant assets; ● Determine the impact of development options on the biodiversity 110 www.legislation.gov.uk/ukpga/2021/30/schedule/14/enacted 111 www.gov.uk/guidance/biodiversity-net-gain 112 Biodiversity Metric www.gov.uk/guidance/biodiversity-metric-calculate-the-biodiversity-net-gain-of-a-project-or-development value of the site, using the Mitigation Hierarchy; ● Establish a design solution that delivers the greatest biodiversity net gain and enhances the ecological network; ● Submit detailed solutions that demonstrate how Biodiversity Net Gain would be delivered. 8.46 The requirements for biodiversity net gain will apply to development projects, or components of projects, as far as the low- water mark, including the intertidal zone. Projects, or components of projects, in the marine environment beyond the intertidal zone are not included within the scope of the mandatory requirements for biodiversity net gain. Protected species, protected sites and irreplaceable habitats will be dealt with in accordance with relevant legislation and licensing regimes, but they must also be taken into account as part of wider biodiversity considerations. The mandatory biodiversity net gain process is additional to existing requirements for Environmental Impact Assessment, Strategic Environmental Assessment, and Habitat Regulations Assessment. There are opportunities to align reporting so that efforts are not duplicated. Irreplaceable habitats are excluded from the BNG metric. 8.47 The biodiversity gain condition is a pre-commencement condition: once planning permission has been granted, a biodiversity gain plan must be submitted and approved by the Council before commencement of development. Submission of a draft biodiversity gain plan with the planning application, whilst not legally required, will assist in demonstrating prior to consent where and how the measures will be implemented and secured. The biodiversity gain plan must include the minimum national information requirements113. 8.48 When evaluating biodiversity gain plans the Council will be seeking to ensure that proposals provide good outcomes for nature, not just achievement of the percentage BNG. Proposals will also need to demonstrate that they provide a long-term benefit to biodiversity that is compatible with other site uses such as recreational space or sports pitches. Proposals should be informed by the Essex Local Nature Recovery Strategy and any Southend specific biodiversity evidence. Delivery of biodiversity units within the Local Nature Recovery Strategy area will maximise ecological connectivity, resilience and species recovery. Developers will therefore be expected to demonstrate how biodiversity gain proposals contribute to these strategic priorities. 8.49 Where off-site habitat measures are required, applicants must provide UK habitat assessment surveys to agree a baseline metric of the existing offsite habitats, conform to BNG CIEEM/IEMA/ CIRIA- Good Practice Principles for Development and seek to deliver strategic BNG as close as feasible to the impacts of the development. The Defra Biodiversity Metric trading rules should also be observed. 8.50 The Council will provide further detailed guidance on BNG setting out any local requirements for on-site and offsite habitat enhancement or creation as well as application of the Biodiversity Gain Hierarchy, including information required at validation, long- term management and monitoring options, funding arrangements, legal arrangements, and costs for any local or strategic offsetting 113 Planning Practice Guidance, Biodiversity Net Gain (paragraph 011) www.gov.uk/guidance/biodiversity-net-gain#para11 schemes. Sport England also has guidance on how habitat creation or enhancement can be compatible with outdoor sports use.
Flooding & waterNature & environmentTransport & travel📍 Chalkwell📍 Gunners Park📍 Leigh📍 Old Leigh📍 Southend📍 Southend-on-Sea📍 Two Tree Island📍 Victoria
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.