What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy DM8.4: Biodiversity
1. Southend’s ecological network will continue to be protected and enhanced, and opportunities for nature recovery will be focussed on the
strategic priorities identified within the Essex Local Nature Recovery Strategy.
2. Developments that are likely to have an adverse impact (either individually or in combination with other developments) on European
Designated Sites must satisfy the requirements of the Habitats Regulations, by determining site specific impacts and avoiding or mitigating
against impacts where identified, having regard to the mitigation hierarchy. Strategic mitigation through the RAMS mitigation scheme will be
required in line with the provisions of Policy DM8.4. Development must comply with the requirements of the Conservation of Habitats and
Species Regulations 2017.
3. All developments should conserve and enhance the network of habitats, species and sites (both statutory and non-statutory) of international,
national and local importance, and give appropriate weight to their importance. Development must ensure it would not result in deterioration
of breeding sites or resting places of European and nationally protected species. Any developments with potential for impact on designated
sites will be required to undertake ecological surveys. These will be undertaken in line with current best practice standards by a competent
ecologist.
4. Development proposals affecting biodiversity assets must demonstrate that the mitigation hierarchy has been applied throughout the design
process. Applicants shall submit proportionate ecological evidence demonstrating:
i. how impacts have been avoided through site selection, layout and design, including locating development away from priority habitats;
ii. where impacts cannot be avoided, how impacts have been minimised through construction and operational measures;
iii. how affected habitats will be restored or reinstated where practicable;
iv. how any residual impacts will be compensated through biodiversity net gain measures
5. Irreplaceable habitats, including ancient woodland, ancient and veteran trees, and priority habitats will be protected.
6. Development affecting Local Wildlife Sites will only be permitted where no alternative sites are available, the benefits clearly outweigh the
harm to biodiversity, and appropriate compensation measures are provided that deliver a net gain in biodiversity.
7. Biodiversity measures that help facilitate habitats and routes for wildlife, for example incorporating trees, wildflowers, ponds, bat and bird
boxes, bee and bird bricks, and hedgehog highways, should be incorporated into new developments in line with the LNRS priority to support
urban habitats. Opportunities for greening the public realm including green or brown roofs on public infrastructure such as bus shelters should
be included when such facilities are repaired or replaced.
8. Proposals for qualifying developments* requiring mandatory 10% biodiversity net gain must use the DEFRA metric or other agreed equivalent
to establish the baseline and proposed post-development biodiversity value of the development site, including any off-site areas proposed for
habitat creation; undertake the assessment by a suitably qualified person** and:
i. Submit the assessment in a digital format alongside the planning application, including a draft Biodiversity Gain Plan;
ii. Biodiversity Net Gain shall be delivered in accordance with the following hierarchy:
a. on-site creation and enhancement;
b. off-site habitat creation and enhancement in locations identified as priorities within the Local Nature Recovery Strategy;
c. off-site habitat creation and enhancement outside these strategic areas where it can be demonstrated that no suitable strategic
opportunities are available;
d. the purchase of biodiversity credits toward habitat banks should only be proposed as a last resort.
iii. The Council will give preference to biodiversity units delivered in locations identified within the Local Nature Recovery Strategy or other
adopted strategic ecological network plan. Where biodiversity units are provided outside areas of strategic significance, applicants may be
required to provide a greater number of biodiversity units to achieve an equivalent ecological outcome, reflecting the lower strategic value
assigned by the biodiversity metric.
iv. A draft Habitat Management and Monitoring Plan should be submitted with the planning application, indicating how the biodiversity net gain
will be achieved and maintained over this period.
v. Ecological impact assessment is required for individual proposals with adverse impact on designated habitats of International, European and
national importance, protected sites and local wildlife sites
vi. Where the watercourse metric applies, development should contribute to Water Framework Directive objectives.
*For qualifying developments please refer to The Biodiversity Gain (Town and Country Planning) (Modifications and Amendments) (England)
Regulations 2024 or successor requirements www.legislation.gov.uk/uksi/2024/50/contents/made
** If the small sites metric is used, the assessment must be undertaken by a competent person. If the full metric is used, the assessment must be
undertaken by a qualified CIEEM ecologist.
Trees – development management policy
Reference to Strategic Objective and Strategic Policies
Strategic Objective 17 Strategic Policy SP8
Why we need this Policy
8.51 Individual trees form a network that makes an essential and
positive contribution to the city’s green infrastructure. There are
approximately 30,000 trees within the Council’s highways, parks
and gardens, and more are located on private land including
residential gardens. In October 2019 the canopy cover of the entire
city was measured at 12%, below the UK average of 17% and slightly
lower than the average canopy cover of coastal towns at 13.7%. The
Woodland Trust also provide a Tree Equity Score UK Map which
takes into account a range of six equally weighted climate, health
and socio-economic variables to identify priorities for tree planting
to contribute towards achieving Tree Equity.
8.52 Tree coverage varies significantly across the city, from a high of
23.3% in Belfairs Ward, to just 8.5% in Westborough Ward. This
reflects the extensive woodland in Belfairs Woods and Golf Course
compared with the very urban nature of wards such as Westborough
where hard surfaces are the predominant ground material.
8.53 Trees provide significant benefits for our physical and mental health
and wellbeing by providing a sense of place and access to nature,
for biodiversity, provision of shade and cooling, and help to alleviate
surface water flooding by offsetting heavy rainfall.
8.54 The Council’s Tree Policy sets a target to increase the tree canopy
114 http://www.ltoa.org.uk/resources/cavat
in the city from 12% to 15% by 2030. This is equivalent to a 20%
increase in tree canopy cover in Southend and would cover an area
the size of 150 football pitches. It is an ambitious target for the city
which will be achieved by the Council acting in partnership with
local businesses, community groups and residents.
8.55 Many of the existing stock of trees within the city were planted
during the peak growth of the settlement, from the late 19th century
to the post war growth of the 1950s. Careful management of the
existing stock and careful selection of appropriate species for
each location will be necessary to achieve the desired increase in
canopy cover.
How the Policy Works
8.56 Policy DM8.5 seeks to protect the existing stock of trees within
the city and increase the tree canopy cover as opportunities arise
through new developments. Developers should set out proposals to
plan, plant, and manage trees within new developments, and agree
how they will be funded, including through developer contributions
and other mechanisms such as biodiversity net gain. The stacking
of appropriate green infrastructure measures including biodiversity
net gain, urban greening factor and SuDS is encouraged to make
effective use of land and secure multi-functional benefits.
8.57 Existing trees on site should be protected and retained wherever
possible, with any losses compensated using the CAVAT 114
methodology. This provides a capital asset value for amenity
trees which reflects their value as essential natural capital. Of
particular note for the Southend context, the CAVAT methodology
(amongst several other factors) assigns a greater weighting to
trees within areas of greater population density, reflecting the size
of the community that experiences benefits provided by the tree.
Developers should check the ancient tree inventory 115 in relation
to trees on their site to confirm the presence of ancient or veteran
trees that must be retained. Ancient and semi-natural woodland are
irreplaceable habitats. Refer to policy DM8.4 Biodiversity.
8.58 Trees may also be subject to a Tree Preservation Order and/ or be
located within a Conservation Area 116 which means that consent is
usually required for works to such trees (including cutting down,
topping, lopping or uprooting). Advice should be sought from
the local planning authority to establish if consent is required.
When granting planning permission, the Council may also where
appropriate, use planning conditions to provide for tree retention
and planting.
8.59 New streets should be tree lined, in accordance with the
expectations of the NPPF, and trees incorporated in other suitable
locations, such as in parks and open spaces. Major residential and
non-residential development should be designed to contribute
towards the tree canopy cover target.
8.60 The right tree should be planted in the right place. Where trees are
proposed to be planted as part of a development proposal, advice
should be sought from the Council’s arboriculture officer to ensure
that the species is appropriate for the site character and condition
and taking account of future maintenance requirements, for
example, tree age, height, form and root spread of future trees, and
115 Tree Search - Ancient Tree Inventory
116 http://www.gov.uk/guidance/tree-preservation-orders-and-trees-in-conservation-areas
117 http://www.gov.uk/government/publications/national-model-design-code
soil type. The impact of climate change on average temperatures
and rainfall levels in the future will also inform the selection of
tree species. There will be a presumption in favour of retention of
Category A/B trees.
8.61 There are constraints to tree planting within built up areas, including
underground services. Within new highway schemes or other hard
landscaping projects, special planting techniques which allow
adequate soil volume to be available and avoid tree roots damaging
the hard surface should be used. http://www.tdag.org.uk/trees-
in-hard-landscapes.html Proposals should accord with British
Standards relating to Trees.
8.62 Additional planting should be included wherever opportunities
arise, using creative solutions including the provision of planters,
green roofs and walls, rain gardens and other sustainable drainage
measures as appropriate.
Further guidance is available in the National Model Design Code on how
trees can be included in the built environment 117.