← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM8.4

Policy DM8.4

Biodiversity

On pages 185 to 188 of the official PDF.

The human version

This policy protects and enhances Southend's ecological network, focusing nature recovery on the priorities in the Essex Local Nature Recovery Strategy. Developments likely to harm European Designated Sites must meet the Habitats Regulations, with strategic mitigation through RAMS. Proposals must protect important habitats and species, with ecological surveys where designated sites may be affected. Applicants must show they first avoided harm, then reduced it, restored habitats and finally compensated for what remains. Irreplaceable habitats such as ancient woodland will be protected, and harm to Local Wildlife Sites is only allowed in strict cases. Qualifying developments must deliver 10% biodiversity net gain using the DEFRA metric, with on-site gains preferred.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 185

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM8.4: Biodiversity 1. Southend’s ecological network will continue to be protected and enhanced, and opportunities for nature recovery will be focussed on the strategic priorities identified within the Essex Local Nature Recovery Strategy. 2. Developments that are likely to have an adverse impact (either individually or in combination with other developments) on European Designated Sites must satisfy the requirements of the Habitats Regulations, by determining site specific impacts and avoiding or mitigating against impacts where identified, having regard to the mitigation hierarchy. Strategic mitigation through the RAMS mitigation scheme will be required in line with the provisions of Policy DM8.4. Development must comply with the requirements of the Conservation of Habitats and Species Regulations 2017. 3. All developments should conserve and enhance the network of habitats, species and sites (both statutory and non-statutory) of international, national and local importance, and give appropriate weight to their importance. Development must ensure it would not result in deterioration of breeding sites or resting places of European and nationally protected species. Any developments with potential for impact on designated sites will be required to undertake ecological surveys. These will be undertaken in line with current best practice standards by a competent ecologist. 4. Development proposals affecting biodiversity assets must demonstrate that the mitigation hierarchy has been applied throughout the design process. Applicants shall submit proportionate ecological evidence demonstrating: i. how impacts have been avoided through site selection, layout and design, including locating development away from priority habitats; ii. where impacts cannot be avoided, how impacts have been minimised through construction and operational measures; iii. how affected habitats will be restored or reinstated where practicable; iv. how any residual impacts will be compensated through biodiversity net gain measures 5. Irreplaceable habitats, including ancient woodland, ancient and veteran trees, and priority habitats will be protected. 6. Development affecting Local Wildlife Sites will only be permitted where no alternative sites are available, the benefits clearly outweigh the harm to biodiversity, and appropriate compensation measures are provided that deliver a net gain in biodiversity. 7. Biodiversity measures that help facilitate habitats and routes for wildlife, for example incorporating trees, wildflowers, ponds, bat and bird boxes, bee and bird bricks, and hedgehog highways, should be incorporated into new developments in line with the LNRS priority to support urban habitats. Opportunities for greening the public realm including green or brown roofs on public infrastructure such as bus shelters should be included when such facilities are repaired or replaced. 8. Proposals for qualifying developments* requiring mandatory 10% biodiversity net gain must use the DEFRA metric or other agreed equivalent to establish the baseline and proposed post-development biodiversity value of the development site, including any off-site areas proposed for habitat creation; undertake the assessment by a suitably qualified person** and: i. Submit the assessment in a digital format alongside the planning application, including a draft Biodiversity Gain Plan; ii. Biodiversity Net Gain shall be delivered in accordance with the following hierarchy: a. on-site creation and enhancement; b. off-site habitat creation and enhancement in locations identified as priorities within the Local Nature Recovery Strategy; c. off-site habitat creation and enhancement outside these strategic areas where it can be demonstrated that no suitable strategic opportunities are available; d. the purchase of biodiversity credits toward habitat banks should only be proposed as a last resort. iii. The Council will give preference to biodiversity units delivered in locations identified within the Local Nature Recovery Strategy or other adopted strategic ecological network plan. Where biodiversity units are provided outside areas of strategic significance, applicants may be required to provide a greater number of biodiversity units to achieve an equivalent ecological outcome, reflecting the lower strategic value assigned by the biodiversity metric. iv. A draft Habitat Management and Monitoring Plan should be submitted with the planning application, indicating how the biodiversity net gain will be achieved and maintained over this period. v. Ecological impact assessment is required for individual proposals with adverse impact on designated habitats of International, European and national importance, protected sites and local wildlife sites vi. Where the watercourse metric applies, development should contribute to Water Framework Directive objectives. *For qualifying developments please refer to The Biodiversity Gain (Town and Country Planning) (Modifications and Amendments) (England) Regulations 2024 or successor requirements www.legislation.gov.uk/uksi/2024/50/contents/made ** If the small sites metric is used, the assessment must be undertaken by a competent person. If the full metric is used, the assessment must be undertaken by a qualified CIEEM ecologist. Trees – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 17 Strategic Policy SP8 Why we need this Policy 8.51 Individual trees form a network that makes an essential and positive contribution to the city’s green infrastructure. There are approximately 30,000 trees within the Council’s highways, parks and gardens, and more are located on private land including residential gardens. In October 2019 the canopy cover of the entire city was measured at 12%, below the UK average of 17% and slightly lower than the average canopy cover of coastal towns at 13.7%. The Woodland Trust also provide a Tree Equity Score UK Map which takes into account a range of six equally weighted climate, health and socio-economic variables to identify priorities for tree planting to contribute towards achieving Tree Equity. 8.52 Tree coverage varies significantly across the city, from a high of 23.3% in Belfairs Ward, to just 8.5% in Westborough Ward. This reflects the extensive woodland in Belfairs Woods and Golf Course compared with the very urban nature of wards such as Westborough where hard surfaces are the predominant ground material. 8.53 Trees provide significant benefits for our physical and mental health and wellbeing by providing a sense of place and access to nature, for biodiversity, provision of shade and cooling, and help to alleviate surface water flooding by offsetting heavy rainfall. 8.54 The Council’s Tree Policy sets a target to increase the tree canopy 114 http://www.ltoa.org.uk/resources/cavat in the city from 12% to 15% by 2030. This is equivalent to a 20% increase in tree canopy cover in Southend and would cover an area the size of 150 football pitches. It is an ambitious target for the city which will be achieved by the Council acting in partnership with local businesses, community groups and residents. 8.55 Many of the existing stock of trees within the city were planted during the peak growth of the settlement, from the late 19th century to the post war growth of the 1950s. Careful management of the existing stock and careful selection of appropriate species for each location will be necessary to achieve the desired increase in canopy cover. How the Policy Works 8.56 Policy DM8.5 seeks to protect the existing stock of trees within the city and increase the tree canopy cover as opportunities arise through new developments. Developers should set out proposals to plan, plant, and manage trees within new developments, and agree how they will be funded, including through developer contributions and other mechanisms such as biodiversity net gain. The stacking of appropriate green infrastructure measures including biodiversity net gain, urban greening factor and SuDS is encouraged to make effective use of land and secure multi-functional benefits. 8.57 Existing trees on site should be protected and retained wherever possible, with any losses compensated using the CAVAT 114 methodology. This provides a capital asset value for amenity trees which reflects their value as essential natural capital. Of particular note for the Southend context, the CAVAT methodology (amongst several other factors) assigns a greater weighting to trees within areas of greater population density, reflecting the size of the community that experiences benefits provided by the tree. Developers should check the ancient tree inventory 115 in relation to trees on their site to confirm the presence of ancient or veteran trees that must be retained. Ancient and semi-natural woodland are irreplaceable habitats. Refer to policy DM8.4 Biodiversity. 8.58 Trees may also be subject to a Tree Preservation Order and/ or be located within a Conservation Area 116 which means that consent is usually required for works to such trees (including cutting down, topping, lopping or uprooting). Advice should be sought from the local planning authority to establish if consent is required. When granting planning permission, the Council may also where appropriate, use planning conditions to provide for tree retention and planting. 8.59 New streets should be tree lined, in accordance with the expectations of the NPPF, and trees incorporated in other suitable locations, such as in parks and open spaces. Major residential and non-residential development should be designed to contribute towards the tree canopy cover target. 8.60 The right tree should be planted in the right place. Where trees are proposed to be planted as part of a development proposal, advice should be sought from the Council’s arboriculture officer to ensure that the species is appropriate for the site character and condition and taking account of future maintenance requirements, for example, tree age, height, form and root spread of future trees, and 115 Tree Search - Ancient Tree Inventory 116 http://www.gov.uk/guidance/tree-preservation-orders-and-trees-in-conservation-areas 117 http://www.gov.uk/government/publications/national-model-design-code soil type. The impact of climate change on average temperatures and rainfall levels in the future will also inform the selection of tree species. There will be a presumption in favour of retention of Category A/B trees. 8.61 There are constraints to tree planting within built up areas, including underground services. Within new highway schemes or other hard landscaping projects, special planting techniques which allow adequate soil volume to be available and avoid tree roots damaging the hard surface should be used. http://www.tdag.org.uk/trees- in-hard-landscapes.html Proposals should accord with British Standards relating to Trees. 8.62 Additional planting should be included wherever opportunities arise, using creative solutions including the provision of planters, green roofs and walls, rain gardens and other sustainable drainage measures as appropriate. Further guidance is available in the National Model Design Code on how trees can be included in the built environment 117.
Design & placemakingInfrastructure & utilitiesNature & environment📍 Belfairs📍 Southend📍 Westborough
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.