Policy DM9.2

Energy

On pages 200 to 203 of the official PDF.

The human version

This policy supports public electric vehicle charging points and community battery storage in principle, subject to good design and protecting residents and groundwater. Every new dwelling with an on-plot parking space should have a charge point. Where a residential building has more than 10 communal or allocated spaces, there should be at least one charge point per dwelling and ducting for the rest. In commercial schemes, 40% of spaces should have a charge point and the other 60% should have ducting. All disabled and car club spaces should have one, rated at least 7kW. Developments of 50 or more dwellings should submit an Energy Masterplan covering layout, heat loads and energy networks.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 200

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM9.2: Energy Decentralised/Renewable Energy – Community 1. Proposals for public electric vehicle charging points and community battery storage will be supported in principle subject to appropriate design and safeguarding residential amenity and satisfactory assessment of risk to groundwater, including location away from vulnerable receptors Electric Vehicle Charging Points in new residential and commercial development 2. Every new dwelling with an associated on-plot car parking space should provide an electric vehicle charge point. This requirement also applies to buildings undergoing a material change of use to create a dwelling. Where there are more than 10 communal or allocated car parking spaces associated with the residential building, a minimum of one charge point should be installed for each dwelling, with ducting infrastructure for each remaining space to enable a future connection location for an electric vehicle charge point. 3. Where commercial developments include on plot car parking spaces, 40% of these should have an electric vehicle charge point. The remainder (60%) should include ducting infrastructure to enable a future connection location for an electric vehicle charge point. 4. All car parking spaces designated for disabled parking should have an EV charge point. 5. All car club parking spaces should have an EV charge point. 6. An electric vehicle charge point should have a minimum power rating output of 7kW, fitted with a universal socket that can charge all types of electric vehicle currently on the market and meet relevant safety and accessibility requirements. 7. Passive provision of ducting infrastructure may be positioned to serve more than one parking space provided that the enabling infrastructure is adequate for the future installation of electric vehicle charge points which enable each space to be used simultaneously for recharging e.g. a charge point with multiple outlets. 8. Where development schemes include on-site renewable energy generation, this should be harnessed to power any electric vehicle charging points provided, unless it can be clearly demonstrated that this is not technically feasible. 9. Where no car parking spaces are to be provided there is no requirement to install an electric vehicle charge point. (These standards should be read in conjunction with the parking standards set out in Appendix 9). Energy Masterplans 10. An Energy Masterplan should be submitted for developments of 50 or more dwellings. This should identify: i. how landform, layout, building orientation, massing and landscape minimises energy consumption; ii. major heat loads from the proposed development; iii. heat loads from existing buildings in the vicinity with the potential to link to the network; iv. primary heat supply plant; v. secondary heat sources; vi. possible land for energy centre or energy storage; vii. potential for decentralised energy networks within the development; viii. infrastructure and land requirements for energy generation. Environmental Protection – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 15 Strategic Policy 9 Why we need this Policy Contaminated Land 9.26 Contaminated land has the potential to pose a risk to the environment or to people. The urban nature of Southend means that most development will be built on previously developed (or brownfield) land. Some brownfield land may have previously been in industrial or commercial use and therefore potentially affected by contamination, requiring where appropriate further investigation as to the existence, nature and extent of any contamination. Redeveloping contaminated land does however provide opportunities for remediation to negate any threats to human health and the environment. Land Stability 9.27 There has been a history of movement of the cliffs along the Thames Estuary frontage, which are often steeper than the natural stable gradient for the materials of which they are composed. This has ranged from small scale slumping to major rotational and transitional movements, such as that in the vicinity of Prittlewell Gardens in 2002 which led to the relocation of the Southend Bandstand from its cliff top location to Priory Park. The cliffs, if not maintained, over 138 https://uk-air.defra.gov.uk/reports/cat09/0701110944_AQinequalitiesFNL_AEAT_0506.pdf a significant period of time, are likely to naturally degrade to a stable profile which would continue to slump and move northwards. This would have a significant and detrimental effect on the built environment, and thus measures are required to prevent and/ or reduce the movement, or where possible accommodate it. Air Quality 9.28 Pollutants from road transport, industry and burning wood and coal in domestic open fires and stoves can affect air quality through emissions released into the air and can constitute a major public health risk. There is also often a strong correlation between poor air quality and less affluent areas. 138 9.29 Levels of air pollution along the A127 road corridor are a particular concern and have led to the designation of two Air Quality Management Areas at the Bell junction and Victoria Avenue/East Street junction, where action to reduce transport related emissions is being focussed. The potential impacts of major developments on air quality, and developments within AQMAs, should therefore be properly assessed and mitigation provided where appropriate. Water 9.30 The Water Framework Directive Regulations 2017 provide a framework for managing the water environment in the UK, to protect and enhance water quality, both surface and ground water. Any developments with potential to affect water quality will need to demonstrate that there will be no deterioration in quality as a result of the proposals and should contribute to achieving an improvement in water quality. Agent of Change 9.31 In a dense urban area where land uses are changing over time and mixed uses are becoming more widespread, existing residents and businesses can be adversely affected by new development. The agent of change principle places the responsibility for mitigating noise and other nuisances on the new development. For example, where residential properties are proposed close to existing noise-generating uses such as pubs and clubs, theatres or sporting facilities, applicants will need to use sensitive design to avoid unacceptable impacts and ensure the continued success of established premises, for example by soundproofing new residential properties, or paying for soundproofing for existing noise-generating businesses. Conversely, if a new noise-generating use is proposed close to existing noise-sensitive uses, it should be designed to protect existing residents or other users from noise impacts. How the Policy Works 9.32 Where land is redeveloped, developers and landowners must ensure it is safe for future occupiers, through effective remediation, removing the source of contamination. Proposals to redevelop sites that are potentially contaminated, or could be affected by nearby sites, will require the developer to carry out an investigation to establish the existence, nature and extent of any contaminating substances, in accordance with best practice guidance. 9.33 Where there is reason to suspect that contamination may be present, for example due to former uses of the land, and the 139 BS 10175:2011+A2:2017 https://knowledge.bsigroup.com/products/investigation-of-potentially-contaminated-sites-code-of-practice-code-of-practice proposed end use is vulnerable, such as homes, schools, children’s play areas, or allotments, a Phase 1 Desk Study report must be submitted with the planning application. Depending on the outcome of the Phase 1 Desk Study, a Phase 2 (site investigation) report and Remediation Statement may also be required in support of the application. 9.34 A Contaminated Land Assessment must be carried out by a competent person and in accordance with the code of practice on investigation of potentially contaminated sites 139. Where appropriate planning conditions will be used to require remediation works to be carried out. Potential land contamination issues should be raised at an early stage and the scope of any site investigation works should be agreed with the Local Planning Authority in writing. It is the responsibility of the developer to ensure that the land is safe for the intended use. The full implications of building on unstable land must be considered at an early stage in the development process, and appropriate mitigation measures agreed prior to a planning application submission. 9.35 Proposals within or likely to affect the two AQMAs will be required to submit an Air Quality Assessment. Proposals for major development should ensure, in consultation with Anglian Water, that there is adequate capacity in foul water infrastructure to accommodate the proposed development to prevent the deterioration in current water quality standards and thus ensure the objectives of the Water Framework Directive are not compromised. 9.36 Where the agent of change principle applies, noise and other impact assessments should be submitted where appropriate and
Design & placemakingHealth, schools & communityTransport & travel📍 Priory Park📍 Prittlewell📍 Southend📍 Victoria
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.