← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend Plan Explorer

Health, schools & community

Health and wellbeing, GP and hospital capacity, schools, sport, open space, play areas and community buildings.

301 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.

The human version (we wrote this, not the council)This section sets out Southend's context and main issues. The city boundary tightly abuts the urban area and the countryside around it is Green Belt, so land is very limited. Southend has 83,500 dwellings housing 182,000 people, and the Government Standard Method says 1,405 new homes are needed each year. There are around 80,000 jobs, and 86% of companies employ 10 staff or fewer. The resort draws around 7 million day visitors and over 200,000 staying visitors a year. The section also covers seven miles of foreshore, over 500 hectares of green space, flood risk, congestion on the A127 and A13, and the Airport's recovery after Covid-19.

The human version (we wrote this, not the council)This section sets out the vision and strategic objectives for the Local Plan. It draws on the Southend City Vision, 'Our City, Our Future', which looks to 2035. The long term vision is of a prosperous, well connected and sustainable "City by the Sea" with distinct neighbourhoods and a cherished coastal identity. There are 24 strategic objectives, grouped under themes from a city that is healthy and safe to a city that is connected and smart. They include an 'infrastructure led' approach, complete neighbourhoods, a choice of homes, a regenerated City Centre, more green space and the growth of London Southend Airport.

The human version (we wrote this, not the council)This policy, Strategic Policy SP2b, sets the guiding principles for the Bournes Green New Neighbourhood on Land North of Southend. It will deliver a minimum of 4,900 new homes and 12,500 sqm of employment floorspace as a series of urban villages. Design must have regard to a Council endorsed Concept Framework, with design codes informed by a Quality Review Panel. The principles include a country park, green and blue corridors along brooks, phased schools and healthcare, road and public transport improvements, links to Garon Park, a high proportion of family homes and local centres. A 9-hole golf course at Garon Park would be lost, but the 18-hole course is kept.

The human version (we wrote this, not the council)This site allocation, Policy DM2b, allocates land north of Southend at Bournes Green, shown as BG001 on the Policies Map. It is for a minimum of 4,900 new homes, including 45% affordable housing and at least 150 self-build or custom-build plots, plus at least 12,500 sqm of employment floorspace. It must provide transport mitigation, new primary and secondary schooling, a purpose built primary care facility, a country park, sports pitches and a Golf Impact Assessment. Development must protect the Essex Coast Habitats Sites, with at least two seasons of wintering bird surveys. The text says exceptional circumstances justify removing this land and Fossetts Farm (HEA264) from the Green Belt.

The human version (we wrote this, not the council)This policy, Strategic Policy SP3, makes sure new development is backed by the infrastructure it needs. Infrastructure must be phased with new homes through an 'Infrastructure Led Approach' and must not overload what already exists. Required infrastructure includes highway upgrades, sustainable transport, more school places, healthcare, emergency services, Protected Green Space, broadband, sewer network improvements and flood prevention. The Council will use planning obligations to secure provision or money from developers. It will review the Southend Community Infrastructure Levy and may use compulsory purchase powers. The text notes problems such as Victorian sewers and parts of the Leigh electricity network operating close to capacity.

The human version (we wrote this, not the council)This section introduces the chapter on healthy lifestyles and wellbeing. Southend faces public health challenges and an ageing population. Life expectancy is around 10 years lower in the most disadvantaged areas than in the least disadvantaged. Healthy life expectancy is estimated at 61.3 years for males and 61.4 years for females. Nearly 1 in 4 adults are physically inactive, and around 26% of 4-5 year olds and 36% of 10-11 year olds are overweight or living with obesity. The section explains how planning can help, for example through safe play spaces, active travel networks, flexible homes and avoiding pollution and flood risk.

The human version (we wrote this, not the council)This policy, Strategic Policy SP4, requires new buildings and spaces to support healthy lifestyles, physical activity and safe, inclusive places. Development should not harm the city's ability to improve education, health and wellbeing. The Council will support schemes that improve the primary care network with the NHS. A Health Impact Assessment is needed for developments of 50 or more dwellings or 5000sqm or more of non-residential floorspace. It is also needed where an Environmental Impact Assessment is required, or for a large HMO of 7 or more unrelated people. A full assessment may follow if significant issues are found. Policy Table SP4.1 lists other policies that affect health.

The human version (we wrote this, not the council)This policy, Policy DM4.1, supports a network of community facilities to help create healthy and complete neighbourhoods. New or improved facilities should be well designed, safe, inclusive and accessible to all. Existing facilities such as community centres, libraries, pubs, places of worship, health facilities, schools and theatres are protected. Their loss is only accepted if the community no longer needs them and alternatives exist, or if the use is no longer financially viable. This must include at least a 1-year active marketing exercise. New homes near such facilities must follow the agent of change principle. The policy also supports more space for burials and cremations, including green burials.

The human version (we wrote this, not the council)This policy, Policy DM4.2, supports new and improved sport and recreation facilities in line with local assessments of need. Planning obligations will be sought where new development creates or adds to local shortages. New or replacement facilities should be safe and inclusive, including changing rooms, and reachable by walking, cycling and public transport. Community Use Agreements will be needed to secure wider community use. Loss of outdoor sports facilities, children's play space or other sports land is only allowed if there is a surplus. The other option is equal or better replacement facilities in accessible places. New investment should follow the Built Facilities Strategy and Playing Pitch Strategy.

Policy DM4.3

Hot Food Takeaways

p. 54

The human version (we wrote this, not the council)This policy, Policy DM4.3, controls where new hot food takeaways can open, to support health and wellbeing. Planning applications for hot food takeaways will be refused if they are within 400 metres of a school. The distance is measured from the centre point of the school site. The only exception is where the takeaway would be inside a designated City, District or Neighbourhood Centre. These centres are set out in Policy DM6.5. This means that a new takeaway close to a school will only be allowed if it is within one of these designated centres.

The human version (we wrote this, not the council)This policy, Strategic Policy SP6, supports at least 68,400sqm of employment space by 2045 to accommodate job growth. Offices, retail and other uses that attract many people will be focused on the City Centre. Development should support key sectors, jobs and training, small businesses, London Southend Airport, fishing at Leigh Port and better broadband. The loss of employment land will not normally be allowed. Designated Employment Areas will be safeguarded for employment uses. Home businesses and live/work units are supported in principle. Hotels, visitor accommodation and leisure are supported to make Southend a year-round destination. The text links this to a projected 9,500 additional jobs by 2045.

The human version (we wrote this, not the council)This policy sets out how Southend's green and blue infrastructure will be protected and strengthened for flood management, biodiversity, recreation and health. Protected Green Space on the policies map will be protected, and new public open space will come through development. Priorities include protecting key nature sites and the River Thames foreshore, more urban greening along Southend High Street, and a target of 15% tree canopy cover by 2030. Qualifying developments must secure at least a 10% net gain in biodiversity. Other aims include sustainable drainage, tackling heat stress, local food growing, new strategic green space within allocation BG001 and on land west of Star Lane, and RAMS contributions.

The human version (we wrote this, not the council)This policy says all major residential developments must provide public open space, on site where possible, or else make a financial contribution. Developers should provide for long-term upkeep. Public open space can only be lost if a replacement of equal or better quality and size serves the same area. New green space, play space, food growing and better walking and cycling access are strongly encouraged. Developments should protect habitats, support the Essex Nature Recovery Strategy and use nature-based SuDS where they can. Allotments can only be redeveloped if no longer needed or replaced. The Council will also support countryside recreation, more footpaths and horse-riding routes, and better local play areas.

Policy DM9.2

Energy

pp. 200–203

The human version (we wrote this, not the council)This policy supports public electric vehicle charging points and community battery storage in principle, subject to good design and protecting residents and groundwater. Every new dwelling with an on-plot parking space should have a charge point. Where a residential building has more than 10 communal or allocated spaces, there should be at least one charge point per dwelling and ducting for the rest. In commercial schemes, 40% of spaces should have a charge point and the other 60% should have ducting. All disabled and car club spaces should have one, rated at least 7kW. Developments of 50 or more dwellings should submit an Energy Masterplan covering layout, heat loads and energy networks.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says Southend sits on a peninsula at the mouth of the Thames Estuary, with a mainly east to west transport corridor. The main roads are the A127 and A13/A1159, linking to the M25, the Dartford River Crossing and the A130. Two railway lines, the c2c line and the Great Eastern main line, link the city to London, and there are nine railway stations in the area. North to south links are limited, especially by public transport. Road congestion affects the economy and tourism, car ownership is just over one car per household, and electric charging points are limited.

The human version (we wrote this, not the council)This policy seeks a 'step change' in transport, working with partners on a modern integrated system. Developments must contribute to improvements in the Southend Infrastructure Delivery Plan and Local Transport Plan where related and necessary. New development must provide for walking, cycling, public transport and new highways. This includes improving the A127/A1159 corridor, better access to places such as Bournes Green New Neighbourhood, Fossetts Farm and London Southend Airport, and high-quality interchanges at places like Leigh Railway Station. Other aims include better buses, use of the River Thames and electric and hydrogen vehicle charging. Large traffic generating schemes will go to well served areas near the City Centre.

The human version (we wrote this, not the council)This policy says development should be located and designed to improve health and wellbeing, encouraging walking, cycling and public transport and reducing reliance on private cars. Designs should put pedestrians, cyclists and public transport users first, with walking and cycling routes usable by first occupation. Access and traffic should not cause undue harm to the street scene, neighbours or highway safety. Schemes creating high travel demand should help fund off-site improvements such as bus priority measures. Proposals should show the network can cope, backed by a Transport Statement and Travel Plan Statement, or a Transport Assessment and full Travel Plan. Better railway stations, forecourts and step-free access will be supported.

The human version (we wrote this, not the council)This policy aims to keep the highway and sustainable transport network safe and efficient while allowing growth. Major development, meaning 10 or more dwellings or a site of 0.5 hectares or more, must consider its effects on traffic, congestion, noise and air quality, and plan for servicing and emergency vehicles. It must use innovative ways to limit disruption during building and use, and deliver highway safety measures, including temporary ones during construction. In Southend Central neighbourhood, major schemes should reduce and combine freight and servicing trips, use technology for efficient deliveries, and provide on site servicing areas where practicable so goods and refuse vehicles can load and unload.

The human version (we wrote this, not the council)This policy says all development should meet the parking standards, including cycle parking, in Appendix 9. Residential standards may be applied flexibly in sustainable locations with frequent public transport, or where strict use would harm local character. On-street parking is only acceptable where the applicant shows there is capacity. Proposals must put pedestrians, disabled people and cyclists first, with safe, secure and covered cycle parking. Major schemes must provide safe access to public transport and for emergency vehicles. Car Club parking is supported, especially in car free or car lite schemes. Vehicle crossovers should not harm highway safety. A 'Park and Ride/Rail' is supported if it meets set requirements.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Eastwood. New development must support healthy lifestyles and be matched by needed infrastructure. Existing homes, including family housing, should be safeguarded, and good quality windfall development is welcomed in the Neighbourhood Centre and Passenger Transport Corridor. Employment floorspace will be protected, including at the Progress Road growth area. Densities may rise along Rayleigh Road where flats suit the local character. The policy seeks public realm improvements, urban greening, better parks such as Oakwood and Eastwood, and tree planting. It also promotes better links to Leigh Railway Station and London Southend Airport, and safer walking and cycling routes.

Policy N2

Leigh

pp. 253–255

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Leigh. New development must support healthy lifestyles and be matched by needed infrastructure. Existing homes, including family housing, should be safeguarded, and good quality windfall schemes are welcomed along the A13 Key Passenger Transport Corridor and in District and Neighbourhood Centres. It supports economic growth, including at Leigh Port, shops in Leigh District Centre, and visitor facilities around Leigh Old Town. Conservation Areas will be conserved. It seeks urban greening, better play space and tree planting. Transport aims include a Mobility Hub at Leigh Railway Station and better walking and cycling routes, including London Road and the Cinder Path.

The human version (we wrote this, not the council)This section describes Prittlewell and sets out its vision. The area has a historic core around St Mary's Church, the Grade I listed Prittlewell Priory in Priory Park, and Prittlewell Conservation Area. Key places include Southend University Hospital, Roots Hall and London Southend Airport just to the north. There are five Local Centres, two employment areas at Priory Works and Thanet Grange, and two Air Quality Management Areas. The vision is for better parks, play areas, tree cover and walking and cycling links, cleaner air, and better access to the airport and Prittlewell station. New homes will focus on passenger transport corridors.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Prittlewell. New development must support health and wellbeing and be matched by the infrastructure it needs. Urban greening along the A127 is encouraged to help air quality. Existing homes are safeguarded and new homes come from sites in Policy N3i. The employment areas at Thanet Grange and Priory Works are protected. The policy supports renewing Roots Hall stadium, linked to Fossetts Farm. It aims to conserve Prittlewell Conservation Area, protect green space, plant trees and avoid flood risk. It also backs better bus, walking and cycling routes, step free access at Prittlewell station and growth at London Southend Airport.

The human version (we wrote this, not the council)This section describes Westcliff and sets out its vision. Westcliff lies between Leigh and Southend Central and has the highest population density in the city, at around 46 homes per hectare. Many older houses have been split into flats. Shops focus on the District Centre at Hamlet Court Road and along the A13 London Road. It has little Protected Green Space, and tree cover is the lowest in the city at 8.5%. The vision keeps Hamlet Court Road as the focus for daily life and makes the A13 a focus for new homes. It also aims to conserve heritage, improve streets and add green space and play facilities.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Westcliff. New development must support health and wellbeing and be matched by the infrastructure it needs. Existing homes, including family housing, are safeguarded, and new homes come from sites in Policy N4i. Good quality windfall schemes along the A13 Key Passenger Transport Corridor and in the centres will be positively considered. The policy seeks a balance on homes in multiple occupation. It protects shops, visitor accommodation, Conservation Areas and the foreshore. It also seeks new green space, play space, tree planting and flood protection, and supports better walking routes along London Road and improvements to Westcliff railway station.

The human version (we wrote this, not the council)This policy sets out extra rules for car parking and traffic in Southend Central, alongside Policy DM10.3. The Council will keep enough parking to support the area and its visitors while allowing planned sites to come forward. Any major scheme that loses visitor parking south of the Central Area, shown on Map N5d, needs a detailed transport assessment. Any replacement parking should be provided within that area. The Council will use signs, pricing and journey information to spread demand between car parks. Routes from car parks and stations should be direct, well lit and signposted, and car parks should look good. The Council will work with partners to secure funding.

The human version (we wrote this, not the council)This section describes Southchurch and sets out its vision. Southchurch is a residential area east of the City Centre, centred on the Southchurch Road neighbourhood centre, with Southend East railway station to the south. Homes range from tightly knit Victorian and Edwardian terraces to lower density post war homes at Bournes Green. The average density is 30 homes per hectare, and parking stress is an issue in denser streets. The vision keeps the area's residential character, with more tree planting in denser streets. New homes may come through intensification along the Southchurch Road A13 corridor. New cycle routes and the conservation of Southchurch Hall are also planned.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Southchurch. New development must support health and wellbeing and be matched by the infrastructure it needs. Existing homes are safeguarded and new homes come from sites in Policy N6i, with growth focused along Southchurch Road and through renewal of housing areas. The policy seeks a balance on homes in multiple occupation and supports shops in the Southchurch Road Neighbourhood Centre. It aims to conserve heritage, protect green space and the foreshore, improve play space and plant more trees, including in Kursaal Ward. Coastal defences will be upgraded where needed. It also supports better transport and Southend East railway station.

The human version (we wrote this, not the council)This section describes Fossetts and sets out its vision. The area lies on the northern edge of Southchurch and the eastern edge of Prittlewell, up to the boundary with Rochford District Council. It holds the fire station, cemetery and crematorium, Garon Park, Fossetts Way retail park and the Temple Farm, Stock Road and Rosshill employment areas. Prittlewell Camp Hillfort is a Scheduled Monument. Development at Fossetts Farm already has planning permission. The vision is for Fossetts to become a new neighbourhood with homes, community and commercial uses and a green setting. New walking and cycling routes, better bus and rail access and a stronger role for Garon Park are planned.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.