What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy DM9.3: Environmental Protection
1. Development on or near land that is known to be contaminated, or which may be affected by contamination will only be permitted where:
i. An appropriate Contaminated Land Assessment has been undertaken to identify risks to human health, the natural environment or water
quality; and
ii. Any contamination found which would pose unacceptable risks to human health, the natural environment or water quality would be subject
to appropriate remedial measures, secured by planning condition, to ensure the site is suitable for the proposed use and development can
safely proceed.
2. Proposals in the vicinity of the cliff frontages will only be considered where:
i. It has been demonstrated to the satisfaction of the Council that the development of unstable or potentially unstable land will be constructed
and used safely without increasing instability of the site and surrounding land; and
ii. It can be demonstrated that mitigation measures to stabilise land are environmentally acceptable and will not adversely impact upon
neighbouring uses or sites.
3. New developments should not cause exceedances of legal air quality standards. Major developments*, and those developments requiring an
Environmental Impact Assessment, should demonstrate measures to actively reduce air pollution in the vicinity of the site, through an Air Quality
Assessment, submitted with the planning application.
4. Within Air Quality Management Areas proposals should identify design solutions to address local problems of air quality, particularly where
developments are likely to be used by people who are vulnerable to poor air quality, such as children or older people.
5. Developments that adversely affect surface and ground water quality will be refused unless adequate mitigation is secured. Proposals should
include measures to reduce risks to the water environment and its ecology; aim to improve water quality (surface, ground and the sea) and
ensure that new development does not unduly burden the existing foul water system.
6. In areas of existing noise and other types of pollution, new development sensitive to the effects of that pollution, including new homes, must
follow the ‘agent-of-change’ principle, which requires the person or organisation responsible for change to manage the impact of that change.
should relate clearly to the specific local circumstances of the application site and environments, identifying all relevant noise receptors, taking
into account the nature of the proposal, and considering ongoing and longer-term mitigation of noise impacts by means of a noise management
plan. Where significant adverse impacts are identified as a result of the assessment, an application is likely to be refused.
Measures to mitigate the impact of the existing pollution on the future occupiers will be secured as part of any planning permission. New
development sensitive to pollution will not be permitted where the presence of that sensitive development could threaten the ongoing viability
of existing uses that are considered desirable for reasons of economic or wider social need, such as industrial uses, sports facilities, public
houses and music venues, through the imposition of undue operational constraints.
7. The Council will require a Noise Impact Assessment and Acoustic Design Statement as part of all major* developments; any other
developments which give rise to potential noise and vibration impacts; or any other application where agent-of-change is considered relevant.
* Major development is defined as:
● The number of dwellings to be provided is 10 more; or
● The development is to be carried out on a site having an area of 0.5 hectares or more and it is not known whether the development would
constitute 10 dwellings or more.
Flood Risk and Sustainable Drainage –
development management policy
Reference to Strategic Objective and Strategic Policies
Strategic Objective 10 Strategic Objective 15 Strategic Objective 18
Strategic Policy SP9
Why we need this Policy
9.37 The city has areas at risk from flooding, which lie within Flood Zones
2 and 3, where new development should be avoided. The Central
Seafront area and City Centre are also subject to surface water
flooding, as indicated in the SFRA and Environment Agency online
mapping, and this can coincide with high tides and periods of heavy
rainfall to cause more complex flooding events. This can lead to
sewer flooding and environmental pollution, including impacts on
water quality. It is therefore important to take a whole catchment
approach to flood risk management, taking into account all sources
of flooding and the lifetime impacts of climate change on all sources
of flood risk.
9.38 The New Water Strategy for Essex (2024) 140 outlines the current
and future water issues facing Essex. There is likely to be sufficient
water capacity to accommodate growth until at least 2045.
However, by 2050 new sources of water supply are likely to be
needed in the East of England. Anglian Water are the sewerage
provider for Southend. Due to historic reasons a large element
140 http://www.essex.gov.uk/sites/default/files/2024-03/Water Strategy for Essex March 2024.pdf
141 https://www.anglianwater.co.uk/corporate/strategies-and-plans/water-resources-management-plan
142 https://environment.data.gov.uk/shoreline-planning/shoreline-management-plan/SMP8
of the system is based on combined sewers (i.e. surface water
and sewerage discharge into the same pipes). This causes issues
with the capacity of the pipes at times of peak flow as well as
contributing to problems with meeting the Water Framework
Directive, in particular for bathing water. Adding new connections to
existing combined sewers exacerbates existing problems. Existing
water and wastewater networks must have the necessary capacity
to accept flows from developments at the point of occupancy.
Appropriate capacity at Southend Water Recycling Centre will help
ensure effluent is sufficiently treated to minimise impact on bathing
and shellfish waters.
9.39 The Anglian Water Drainage and Wastewater Management Plan
(2025-2050)141 includes a range of scenarios to take account of
climate change and a variety of growth projections. The Council
and developers will need to work closely with Anglian Water with
respect to the sewerage network, to ensure there is adequate
capacity in foul water infrastructure to accommodate the scale of
growth as set out in the range of growth scenarios presented, to
prevent the deterioration in current water quality standards.
9.40 NPPF requires that Local Plans should reduce risk from coastal
change by avoiding inappropriate development in vulnerable areas.
The Shoreline Management Plan (SMP) 142 sets out a sustainable
management approach for the Southend coastline over a 25-year
period. The overall intent of the SMP is to sustain and support the
viability of the seafront related tourism and commercial activities
and protect the communities living along the coastline. This means
a continuation of the current management approach that seeks to
hold the current alignment where there are defences. Although
the integrity of defences is at risk of erosion, holding the line is
necessary to sustain the viability of Southend as a seaside resort.
This is reflected in the Southend-on-Sea Shoreline Strategy.
9.41 The Essex and South Suffolk SMP has a policy of “Hold the Line” for
the Southend on Sea management unit through the short, medium
and long term periods to 2105. The management intention from the
SMP is that “the current line will be held throughout the duration of
the SMP. The standard of protection will be maintained or upgraded.
Economic case could be challenging, and a partnership approach
may be needed to maintain defences. Hold the Line at Two Tree
Island is driven by presence of historic waste facilities.”
9.42 Sustainable drainage systems (SuDS), such as permeable surfaces,
rain gardens and ponds, reduce the risk of surface water flooding.
Sustainable drainage solutions can be integrated with public realm
enhancements and green infrastructure to reduce surface water
run-off and provide more attractive places. The Council will work
closely with the Environment Agency and Anglian Water as well as
developers to deliver appropriate solutions.
9.43 The Catchment to Coast project143 aims to test innovative methods
of tackling flooding and coastal erosion, including enhancing and
regenerating saltmarsh at Two Tree Island and improved sustainable
drainage measures at Marine Parade, incorporating nature-based
solutions and integrated water management where possible to
become more resilient to climate change impacts.
143 Catchment to Coast: www.catchmenttocoast.uk/
How the Policy Works
9.44 The risk of flooding in Southend will be managed by ensuring
that individual developments that have to be located in areas
of flood risk are safe and flood resilient and, in the longer term,
implementing a strategic shoreline defence to protect the city as
a whole. Parts of the city along the seafront as well as areas of
Shoeburyness are currently at increased risk of tidal flooding. New
development and growth in this area will need to include design
solutions and funding mechanisms and /or arrangements which do
not prevent or restrict future maintenance and improvement of flood
defences and the Council’s ability to manage coastal change and to
increase crest levels to mitigate future tidal flood risk. Policy DM9.4
seeks to direct new development away from areas at highest risk
of flooding, and to design developments to be more resilience to
flood events. By tackling flood risk, developers and businesses will
have confidence to invest in, and people to live in, the City Centre,
securing sustainable economic growth. New defences can also
be integrated into the cityscape and within new developments. It
is important that developments connect appropriately to water
and wastewater infrastructure, incorporate sustainable drainage
wherever possible, and take account of infrastructure easements.
9.45 Sustainable urban drainage systems (SuDs) are designed to reduce
the potential impact of new and existing developments with respect
to surface water drainage discharges. SuDS try to replicate natural
systems and use cost effective solutions with low environmental
impact to drain away dirty and surface water run-off through
collection, storage, and cleaning, and form an integral part of the
city’s green and blue infrastructure network. Integrating green and
blue infrastructure into new developments, at all scales, will be the
default approach. This is necessary to manage surface water within
the catchment of Southend in a pro-active manner, considering the
inter-connected nature of sources of flooding within the city.
9.46 Policy DM9.4 will ensure that development in one part of Southend
will not have an adverse effect on residents and business
elsewhere in the city. SuDS should replicate natural systems and
use cost effective solutions with low environmental impact to
drain away surface water run-off through collection, storage and
cleaning. The type of SuDS measures for a particular site should be
informed by specific catchment and ground characteristics, taking
a landscape-led approach. SuDS should form part of the design at
an early stage to secure the most appropriate solution and should
be integrated into the site layout proposals prior to undertaking any
other site masterplanning, to ensure proposals are practical and
feasible.
9.47 SuDS should be designed in accordance with the Non-statutory
technical standards for sustainable drainage systems (2015) and
guidance in the SuDS Manual (2015) published by Construction
Industry Research and Information Association (CIRIA). Please
also refer to the Susdrain website (www.susdrain.org) for more
information.
9.48 The design target will be to limit the discharge of the site run-
off to green-field levels wherever possible. It may be found that
this standard is not achievable, but any derogation will have to
be approved by the organisation managing the receiving water
144 http://www.southend.gov.uk/protecting-environment-emergencies/climate-change-2
system. For main rivers and ordinary watercourses this will be the
Council, and for public surface water sewers Anglian Water. Detailed
guidance will be produced to support the policy, demonstrating
how nature-based solutions can be implemented within the
Southend context, illustrated by real life examples from local
projects such as SARCC, Catchment to Coast project, and the Cool
Towns project144.
9.49 It should be noted that SuDS must receive planning approval before
construction is commenced and:
● for extensions and other single property developments the owner
or developer will remain responsible for maintaining the system in
good working order;
● for developments above single property scale, once the Council, as
the Lead Local Flood Authority, is satisfied it has been constructed
to an appropriate standard, the Council will adopt the SuDs for
maintenance.