← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / DM9.3

Policy DM9.3

Environmental Protection

On pages 204 to 208 of the official PDF.

The human version

This policy sets out how people and the environment will be protected from pollution. Building on or near contaminated land needs a Contaminated Land Assessment and suitable clean up secured by planning condition. Near the cliff frontages, schemes must show they can be built and used safely without making the land less stable. New development should not break legal air quality limits, and major schemes need an Air Quality Assessment. Schemes that harm water quality will be refused unless mitigated. New homes near existing noise must follow the 'agent-of-change' principle and must not threaten valued uses such as pubs and music venues. Major schemes need a Noise Impact Assessment.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 204

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM9.3: Environmental Protection 1. Development on or near land that is known to be contaminated, or which may be affected by contamination will only be permitted where: i. An appropriate Contaminated Land Assessment has been undertaken to identify risks to human health, the natural environment or water quality; and ii. Any contamination found which would pose unacceptable risks to human health, the natural environment or water quality would be subject to appropriate remedial measures, secured by planning condition, to ensure the site is suitable for the proposed use and development can safely proceed. 2. Proposals in the vicinity of the cliff frontages will only be considered where: i. It has been demonstrated to the satisfaction of the Council that the development of unstable or potentially unstable land will be constructed and used safely without increasing instability of the site and surrounding land; and ii. It can be demonstrated that mitigation measures to stabilise land are environmentally acceptable and will not adversely impact upon neighbouring uses or sites. 3. New developments should not cause exceedances of legal air quality standards. Major developments*, and those developments requiring an Environmental Impact Assessment, should demonstrate measures to actively reduce air pollution in the vicinity of the site, through an Air Quality Assessment, submitted with the planning application. 4. Within Air Quality Management Areas proposals should identify design solutions to address local problems of air quality, particularly where developments are likely to be used by people who are vulnerable to poor air quality, such as children or older people. 5. Developments that adversely affect surface and ground water quality will be refused unless adequate mitigation is secured. Proposals should include measures to reduce risks to the water environment and its ecology; aim to improve water quality (surface, ground and the sea) and ensure that new development does not unduly burden the existing foul water system. 6. In areas of existing noise and other types of pollution, new development sensitive to the effects of that pollution, including new homes, must follow the ‘agent-of-change’ principle, which requires the person or organisation responsible for change to manage the impact of that change. should relate clearly to the specific local circumstances of the application site and environments, identifying all relevant noise receptors, taking into account the nature of the proposal, and considering ongoing and longer-term mitigation of noise impacts by means of a noise management plan. Where significant adverse impacts are identified as a result of the assessment, an application is likely to be refused. Measures to mitigate the impact of the existing pollution on the future occupiers will be secured as part of any planning permission. New development sensitive to pollution will not be permitted where the presence of that sensitive development could threaten the ongoing viability of existing uses that are considered desirable for reasons of economic or wider social need, such as industrial uses, sports facilities, public houses and music venues, through the imposition of undue operational constraints. 7. The Council will require a Noise Impact Assessment and Acoustic Design Statement as part of all major* developments; any other developments which give rise to potential noise and vibration impacts; or any other application where agent-of-change is considered relevant. * Major development is defined as: ● The number of dwellings to be provided is 10 more; or ● The development is to be carried out on a site having an area of 0.5 hectares or more and it is not known whether the development would constitute 10 dwellings or more. Flood Risk and Sustainable Drainage – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 10 Strategic Objective 15 Strategic Objective 18 Strategic Policy SP9 Why we need this Policy 9.37 The city has areas at risk from flooding, which lie within Flood Zones 2 and 3, where new development should be avoided. The Central Seafront area and City Centre are also subject to surface water flooding, as indicated in the SFRA and Environment Agency online mapping, and this can coincide with high tides and periods of heavy rainfall to cause more complex flooding events. This can lead to sewer flooding and environmental pollution, including impacts on water quality. It is therefore important to take a whole catchment approach to flood risk management, taking into account all sources of flooding and the lifetime impacts of climate change on all sources of flood risk. 9.38 The New Water Strategy for Essex (2024) 140 outlines the current and future water issues facing Essex. There is likely to be sufficient water capacity to accommodate growth until at least 2045. However, by 2050 new sources of water supply are likely to be needed in the East of England. Anglian Water are the sewerage provider for Southend. Due to historic reasons a large element 140 http://www.essex.gov.uk/sites/default/files/2024-03/Water Strategy for Essex March 2024.pdf 141 https://www.anglianwater.co.uk/corporate/strategies-and-plans/water-resources-management-plan 142 https://environment.data.gov.uk/shoreline-planning/shoreline-management-plan/SMP8 of the system is based on combined sewers (i.e. surface water and sewerage discharge into the same pipes). This causes issues with the capacity of the pipes at times of peak flow as well as contributing to problems with meeting the Water Framework Directive, in particular for bathing water. Adding new connections to existing combined sewers exacerbates existing problems. Existing water and wastewater networks must have the necessary capacity to accept flows from developments at the point of occupancy. Appropriate capacity at Southend Water Recycling Centre will help ensure effluent is sufficiently treated to minimise impact on bathing and shellfish waters. 9.39 The Anglian Water Drainage and Wastewater Management Plan (2025-2050)141 includes a range of scenarios to take account of climate change and a variety of growth projections. The Council and developers will need to work closely with Anglian Water with respect to the sewerage network, to ensure there is adequate capacity in foul water infrastructure to accommodate the scale of growth as set out in the range of growth scenarios presented, to prevent the deterioration in current water quality standards. 9.40 NPPF requires that Local Plans should reduce risk from coastal change by avoiding inappropriate development in vulnerable areas. The Shoreline Management Plan (SMP) 142 sets out a sustainable management approach for the Southend coastline over a 25-year period. The overall intent of the SMP is to sustain and support the viability of the seafront related tourism and commercial activities and protect the communities living along the coastline. This means a continuation of the current management approach that seeks to hold the current alignment where there are defences. Although the integrity of defences is at risk of erosion, holding the line is necessary to sustain the viability of Southend as a seaside resort. This is reflected in the Southend-on-Sea Shoreline Strategy. 9.41 The Essex and South Suffolk SMP has a policy of “Hold the Line” for the Southend on Sea management unit through the short, medium and long term periods to 2105. The management intention from the SMP is that “the current line will be held throughout the duration of the SMP. The standard of protection will be maintained or upgraded. Economic case could be challenging, and a partnership approach may be needed to maintain defences. Hold the Line at Two Tree Island is driven by presence of historic waste facilities.” 9.42 Sustainable drainage systems (SuDS), such as permeable surfaces, rain gardens and ponds, reduce the risk of surface water flooding. Sustainable drainage solutions can be integrated with public realm enhancements and green infrastructure to reduce surface water run-off and provide more attractive places. The Council will work closely with the Environment Agency and Anglian Water as well as developers to deliver appropriate solutions. 9.43 The Catchment to Coast project143 aims to test innovative methods of tackling flooding and coastal erosion, including enhancing and regenerating saltmarsh at Two Tree Island and improved sustainable drainage measures at Marine Parade, incorporating nature-based solutions and integrated water management where possible to become more resilient to climate change impacts. 143 Catchment to Coast: www.catchmenttocoast.uk/ How the Policy Works 9.44 The risk of flooding in Southend will be managed by ensuring that individual developments that have to be located in areas of flood risk are safe and flood resilient and, in the longer term, implementing a strategic shoreline defence to protect the city as a whole. Parts of the city along the seafront as well as areas of Shoeburyness are currently at increased risk of tidal flooding. New development and growth in this area will need to include design solutions and funding mechanisms and /or arrangements which do not prevent or restrict future maintenance and improvement of flood defences and the Council’s ability to manage coastal change and to increase crest levels to mitigate future tidal flood risk. Policy DM9.4 seeks to direct new development away from areas at highest risk of flooding, and to design developments to be more resilience to flood events. By tackling flood risk, developers and businesses will have confidence to invest in, and people to live in, the City Centre, securing sustainable economic growth. New defences can also be integrated into the cityscape and within new developments. It is important that developments connect appropriately to water and wastewater infrastructure, incorporate sustainable drainage wherever possible, and take account of infrastructure easements. 9.45 Sustainable urban drainage systems (SuDs) are designed to reduce the potential impact of new and existing developments with respect to surface water drainage discharges. SuDS try to replicate natural systems and use cost effective solutions with low environmental impact to drain away dirty and surface water run-off through collection, storage, and cleaning, and form an integral part of the city’s green and blue infrastructure network. Integrating green and blue infrastructure into new developments, at all scales, will be the default approach. This is necessary to manage surface water within the catchment of Southend in a pro-active manner, considering the inter-connected nature of sources of flooding within the city. 9.46 Policy DM9.4 will ensure that development in one part of Southend will not have an adverse effect on residents and business elsewhere in the city. SuDS should replicate natural systems and use cost effective solutions with low environmental impact to drain away surface water run-off through collection, storage and cleaning. The type of SuDS measures for a particular site should be informed by specific catchment and ground characteristics, taking a landscape-led approach. SuDS should form part of the design at an early stage to secure the most appropriate solution and should be integrated into the site layout proposals prior to undertaking any other site masterplanning, to ensure proposals are practical and feasible. 9.47 SuDS should be designed in accordance with the Non-statutory technical standards for sustainable drainage systems (2015) and guidance in the SuDS Manual (2015) published by Construction Industry Research and Information Association (CIRIA). Please also refer to the Susdrain website (www.susdrain.org) for more information. 9.48 The design target will be to limit the discharge of the site run- off to green-field levels wherever possible. It may be found that this standard is not achievable, but any derogation will have to be approved by the organisation managing the receiving water 144 http://www.southend.gov.uk/protecting-environment-emergencies/climate-change-2 system. For main rivers and ordinary watercourses this will be the Council, and for public surface water sewers Anglian Water. Detailed guidance will be produced to support the policy, demonstrating how nature-based solutions can be implemented within the Southend context, illustrated by real life examples from local projects such as SARCC, Catchment to Coast project, and the Cool Towns project144. 9.49 It should be noted that SuDS must receive planning approval before construction is commenced and: ● for extensions and other single property developments the owner or developer will remain responsible for maintaining the system in good working order; ● for developments above single property scale, once the Council, as the Lead Local Flood Authority, is satisfied it has been constructed to an appropriate standard, the Council will adopt the SuDs for maintenance.
Design & placemakingFlooding & waterInfrastructure & utilities📍 Shoeburyness📍 Southend📍 Southend-on-Sea📍 Two Tree Island
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.