This policy says all development should avoid areas at risk of flooding and give evidence for the Sequential Test. Schemes must use Sustainable Drainage Systems (SuDS) so peak flows after development are no higher than before, using nature-based solutions where possible. Surface water must never go into a separate foul sewer, and infiltration SuDS are only allowed where they pose no risk to water. Sites at risk of flooding need a Flood Risk Assessment covering all sources, with more vulnerable uses placed where risk is lowest, safe escape routes, and habitable floors above the design flood level. Coastal schemes must allow flood defences to be maintained and raised.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy DM9.4: Flood Risk and Sustainable Drainage
1. All development proposals should:
i. seek to avoid areas at risk of flooding and provide evidence to support the application of the Sequential Test;
ii. demonstrate how they incorporate Sustainable Drainage Systems (SuDS) to mitigate the increase in surface water run-off, and where
relevant, how they will avoid or mitigate tidal or fluvial flood risk, to ensure that peak flows, post development, are not increased above pre-
development levels and that new development is both safe and flood resilient for its lifetime;
iii. positively contribute to reducing flood risk by working with natural processes and where possible using green infrastructure to provide a
nature-based solution to flood risk management for the site and surrounding area.
iv. connect to the existing water and wastewater networks wherever possible unless this is not available and alternative provision is necessary.
v. Any necessary mitigation measures must be secured through conditions or legal agreement.
2. New impermeable areas must be drained via Sustainable Drainage Systems (SuDS), to ensure the risk of surface water is not increased on site
or elsewhere. Under no circumstances will surface water be permitted to discharge into a separate foul sewer or sewerage system. SuDS must
receive planning approval before any construction is commenced. Proposals should demonstrate the appropriateness of the SuDS solution for
the site and how it fits into the city’s green infrastructure network.
3. Infiltration SuDS shall only be used where they will not pose a risk to the water environment. Deep filtration schemes will only be approved
where there are no other feasible disposal options and where the developer demonstrates no unacceptable pollution risk to groundwater.
iii.
4. Development proposals which are or will be at risk of flooding over their lifetime should be accompanied by a Flood Risk Assessment that
considers all sources of flooding. Proposals should:
i. Take account of recommendations in any relevant SFRA Level 2 site assessment;
ii. locate more vulnerable uses in the area of the proposal least at risk;
iii. provide a safe access and egress route away from the flood risk (e.g. to Flood Zone 1) during a flood design event;
Or provide a clear justification as to why these requirements in i. and ii. are not practical, viable or appropriate in planning and design terms.
iv. achieve an appropriate degree of safety over the lifetime of the development including the following minimum safety standards:
a. more vulnerable uses: floor levels of habitable rooms will be above the design flood level, with an allowance for climate change. Within
Flood Zone 3 the floor level must be situated above the design floor level with allowance for climate change
b. for all uses: development should remain structurally sound in an extreme flood event; provide appropriate flood resistance/resilience
measures to the extreme flood level; not generate increased flood risk elsewhere; provide a flood plan identifying methods of warning
and evacuation; and provide an appropriate safe refuge above the 1:1000+ climate change flood level if safe access and egress during a
design flood event is not provided for.
5. All development on the coast must have regard to the need to manage future flood risk and coastal change to maintain the structural integrity of
flood defences, including:
i. appropriate flood defence and engineering solutions which demonstrate the applicant’s incorporation of, or ability to latterly adapt to,
increased crest levels to mitigate future tidal flood risk;
ii. design solutions and funding mechanisms and / or arrangements which do not prevent or restrict future maintenance and improvement of
flood defences and the Council’s ability to manage coastal change;
iii. protect sites of International, European, and national importance for nature, limiting any adverse impacts and where possible enhancing their
biodiversity interest.
Minerals – development management
policy
Reference to Strategic Objective and Strategic Policies
Strategic Objective 14 Strategic Policy SP9
Why we need this Policy
9.50 As a unitary authority, the Council is the local Minerals and Waste
Planning Authority (MWPA) with the responsibility to make Local
Plans. Essex is one of the largest producers in the UK for sand
and gravel resources, used in construction and for roads. Existing
allocated sites within the Essex Minerals Local Plan Review 2014
contain sufficient mineral resources to support current needs
within Essex and outside the county (including Southend). Essex’s
current mineral provision at a rate of 4.31 million tonnes per annum
accommodates the fact that Southend is unlikely to be able to
provide any minerals for its growth and development needs 145.
9.51 There has been a clear reduction in the amount of mineral
permitted for extraction in Greater Essex over the last 20 years. 146
This follows a national trend. At the end of 2020, Greater Essex
(including Southend and Thurrock) had sufficient permitted reserve
and allocations to meet minerals supply and demand. The Essex
Minerals Local Plan is under review and will consider both an
appropriate plan provision figure for extraction to 2045, and
potential additional sites for extraction. None of the 52 candidate
sites submitted for consideration to date are in South Essex.
145 http://www.essex.gov.uk/minerals-waste-planning-policy/minerals-local-plan
146 Greater Essex LAA 2025 Greater Essex Local Aggregate Assessment 2025
9.52 Southend’s mineral resources consist of brick earth and are
predominantly located under agricultural land to the north of the
city and just beyond the city boundary in the district of Rochford,
but there are no active brickworks in the Southend or Rochford
areas. Following large-scale rationalisation in recent years, the
UK brick industry is now dominated by five large manufacturers,
each of which operates several highly automated production units
and other factories. There are some smaller brickworks in north
Essex, serving mainly specialist or local markets, including for the
construction and restoration of buildings, but there is no extraction
of brickearth within Essex at the present time. Although the mineral
resources in Southend are not currently worked, minerals are a
finite resource and can only be worked where they are found. It
is therefore important to make best use of minerals of local and
national importance, as there may be potential to extract this
resource economically at some point in the future. Policy DM9.5
therefore provides for the safeguarding of mineral resources, and
requirement for prior extraction to be considered where other
necessary development might sterilise valuable mineral resources.
9.53 Some areas of agricultural land are proposed to be designated for
a mix of land uses, ensuring that any development would secure a
net gain in biodiversity and include an element of improved green
space. These sites are set out in the neighbourhood chapter 12.
Please refer to the Prittlewell and Fossetts Neighbourhood sections
for more information.
9.54 Existing waste management infrastructure at Stock Road and
Temple Farm will continue to be safeguarded, to comply with
NPPF, National Planning Policy for Waste, and adopted Essex and
Southend Waste Local Plan (2017).
9.55 The South East Marine Plan (2021) includes policies safeguarding
wharves and ports from the encroachment of incompatible
development that may comprise the ability of these marine facilities
to receive aggregate from marine-won mineral. The nearest facilities
are within Thurrock and outside the plan area. The Essex MWPA’s
Wharf Baseline Capacity Study (2020) concluded that there is
currently no means to justify a reduced land-won allocation through
a reliance on increased marine-won aggregate landings. Licences
to explore and extract marine won aggregates are within the remit
of the Crown Estate, and outside the responsibility of Mineral and
Waste Planning Authorities.
How the Policy Works
9.56 Developments should avoid loss of minerals resources including
best and most versatile agricultural land. Developments with the
potential to affect safeguarded minerals resources will be required
to demonstrate that there will be no unacceptable harm to these
assets, and that prior extraction is not practicable. Policy DM9.5 sets
out the criteria that developers will need to meet to demonstrate
this. When determining planning applications, great weight should
be given to the benefits of mineral extraction, including to the
economy. When significant development on agricultural land is
demonstrated to be necessary, areas of poorer quality land should
be preferred to those of a higher quality.