Policy DM9.4

Flood Risk and Sustainable Drainage

On pages 209 to 212 of the official PDF.

The human version

This policy says all development should avoid areas at risk of flooding and give evidence for the Sequential Test. Schemes must use Sustainable Drainage Systems (SuDS) so peak flows after development are no higher than before, using nature-based solutions where possible. Surface water must never go into a separate foul sewer, and infiltration SuDS are only allowed where they pose no risk to water. Sites at risk of flooding need a Flood Risk Assessment covering all sources, with more vulnerable uses placed where risk is lowest, safe escape routes, and habitable floors above the design flood level. Coastal schemes must allow flood defences to be maintained and raised.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 209

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy DM9.4: Flood Risk and Sustainable Drainage 1. All development proposals should: i. seek to avoid areas at risk of flooding and provide evidence to support the application of the Sequential Test; ii. demonstrate how they incorporate Sustainable Drainage Systems (SuDS) to mitigate the increase in surface water run-off, and where relevant, how they will avoid or mitigate tidal or fluvial flood risk, to ensure that peak flows, post development, are not increased above pre- development levels and that new development is both safe and flood resilient for its lifetime; iii. positively contribute to reducing flood risk by working with natural processes and where possible using green infrastructure to provide a nature-based solution to flood risk management for the site and surrounding area. iv. connect to the existing water and wastewater networks wherever possible unless this is not available and alternative provision is necessary. v. Any necessary mitigation measures must be secured through conditions or legal agreement. 2. New impermeable areas must be drained via Sustainable Drainage Systems (SuDS), to ensure the risk of surface water is not increased on site or elsewhere. Under no circumstances will surface water be permitted to discharge into a separate foul sewer or sewerage system. SuDS must receive planning approval before any construction is commenced. Proposals should demonstrate the appropriateness of the SuDS solution for the site and how it fits into the city’s green infrastructure network. 3. Infiltration SuDS shall only be used where they will not pose a risk to the water environment. Deep filtration schemes will only be approved where there are no other feasible disposal options and where the developer demonstrates no unacceptable pollution risk to groundwater. iii. 4. Development proposals which are or will be at risk of flooding over their lifetime should be accompanied by a Flood Risk Assessment that considers all sources of flooding. Proposals should: i. Take account of recommendations in any relevant SFRA Level 2 site assessment; ii. locate more vulnerable uses in the area of the proposal least at risk; iii. provide a safe access and egress route away from the flood risk (e.g. to Flood Zone 1) during a flood design event; Or provide a clear justification as to why these requirements in i. and ii. are not practical, viable or appropriate in planning and design terms. iv. achieve an appropriate degree of safety over the lifetime of the development including the following minimum safety standards: a. more vulnerable uses: floor levels of habitable rooms will be above the design flood level, with an allowance for climate change. Within Flood Zone 3 the floor level must be situated above the design floor level with allowance for climate change b. for all uses: development should remain structurally sound in an extreme flood event; provide appropriate flood resistance/resilience measures to the extreme flood level; not generate increased flood risk elsewhere; provide a flood plan identifying methods of warning and evacuation; and provide an appropriate safe refuge above the 1:1000+ climate change flood level if safe access and egress during a design flood event is not provided for. 5. All development on the coast must have regard to the need to manage future flood risk and coastal change to maintain the structural integrity of flood defences, including: i. appropriate flood defence and engineering solutions which demonstrate the applicant’s incorporation of, or ability to latterly adapt to, increased crest levels to mitigate future tidal flood risk; ii. design solutions and funding mechanisms and / or arrangements which do not prevent or restrict future maintenance and improvement of flood defences and the Council’s ability to manage coastal change; iii. protect sites of International, European, and national importance for nature, limiting any adverse impacts and where possible enhancing their biodiversity interest. Minerals – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 14 Strategic Policy SP9 Why we need this Policy 9.50 As a unitary authority, the Council is the local Minerals and Waste Planning Authority (MWPA) with the responsibility to make Local Plans. Essex is one of the largest producers in the UK for sand and gravel resources, used in construction and for roads. Existing allocated sites within the Essex Minerals Local Plan Review 2014 contain sufficient mineral resources to support current needs within Essex and outside the county (including Southend). Essex’s current mineral provision at a rate of 4.31 million tonnes per annum accommodates the fact that Southend is unlikely to be able to provide any minerals for its growth and development needs 145. 9.51 There has been a clear reduction in the amount of mineral permitted for extraction in Greater Essex over the last 20 years. 146 This follows a national trend. At the end of 2020, Greater Essex (including Southend and Thurrock) had sufficient permitted reserve and allocations to meet minerals supply and demand. The Essex Minerals Local Plan is under review and will consider both an appropriate plan provision figure for extraction to 2045, and potential additional sites for extraction. None of the 52 candidate sites submitted for consideration to date are in South Essex. 145 http://www.essex.gov.uk/minerals-waste-planning-policy/minerals-local-plan 146 Greater Essex LAA 2025 Greater Essex Local Aggregate Assessment 2025 9.52 Southend’s mineral resources consist of brick earth and are predominantly located under agricultural land to the north of the city and just beyond the city boundary in the district of Rochford, but there are no active brickworks in the Southend or Rochford areas. Following large-scale rationalisation in recent years, the UK brick industry is now dominated by five large manufacturers, each of which operates several highly automated production units and other factories. There are some smaller brickworks in north Essex, serving mainly specialist or local markets, including for the construction and restoration of buildings, but there is no extraction of brickearth within Essex at the present time. Although the mineral resources in Southend are not currently worked, minerals are a finite resource and can only be worked where they are found. It is therefore important to make best use of minerals of local and national importance, as there may be potential to extract this resource economically at some point in the future. Policy DM9.5 therefore provides for the safeguarding of mineral resources, and requirement for prior extraction to be considered where other necessary development might sterilise valuable mineral resources. 9.53 Some areas of agricultural land are proposed to be designated for a mix of land uses, ensuring that any development would secure a net gain in biodiversity and include an element of improved green space. These sites are set out in the neighbourhood chapter 12. Please refer to the Prittlewell and Fossetts Neighbourhood sections for more information. 9.54 Existing waste management infrastructure at Stock Road and Temple Farm will continue to be safeguarded, to comply with NPPF, National Planning Policy for Waste, and adopted Essex and Southend Waste Local Plan (2017). 9.55 The South East Marine Plan (2021) includes policies safeguarding wharves and ports from the encroachment of incompatible development that may comprise the ability of these marine facilities to receive aggregate from marine-won mineral. The nearest facilities are within Thurrock and outside the plan area. The Essex MWPA’s Wharf Baseline Capacity Study (2020) concluded that there is currently no means to justify a reduced land-won allocation through a reliance on increased marine-won aggregate landings. Licences to explore and extract marine won aggregates are within the remit of the Crown Estate, and outside the responsibility of Mineral and Waste Planning Authorities. How the Policy Works 9.56 Developments should avoid loss of minerals resources including best and most versatile agricultural land. Developments with the potential to affect safeguarded minerals resources will be required to demonstrate that there will be no unacceptable harm to these assets, and that prior extraction is not practicable. Policy DM9.5 sets out the criteria that developers will need to meet to demonstrate this. When determining planning applications, great weight should be given to the benefits of mineral extraction, including to the economy. When significant development on agricultural land is demonstrated to be necessary, areas of poorer quality land should be preferred to those of a higher quality.
Design & placemakingFlooding & waterInfrastructure & utilities📍 Fossetts📍 Prittlewell📍 Rochford📍 Southend📍 Temple Farm
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.