← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / SP11

Policy SP11

London Southend Airport

On pages 233 to 240 of the official PDF.

The human version

This policy says the Council will keep working with Rochford District Council to deliver the Joint Area Action Plan (JAAP) for London Southend Airport and its surroundings. It supports making the airport and its station a sustainable transport hub, plus local skills and work placement schemes. Development that could harm safe airport operation, such as tall buildings, cranes, lighting or glare, will be assessed, consulting the airport where needed. Expansion will only be supported if it is airport related, follows the JAAP or a joint master plan, assesses impacts such as air quality, causes no material increase in noise, cuts car use, plans for zero-carbon operation and is closely monitored.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 233

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Strategic Policy SP11: London Southend Airport 1. The Council will continue to work with Rochford District Council to deliver the existing Joint Area Action Plan (JAAP) for the Airport and environs, along with any future review or preparation of a joint masterplan as required. This includes policies governing the development and monitoring of airport operations; development of employment sites surrounding the airport within the JAAP boundaries; and promotion and monitoring of sustainable travel opportunities for both staff and visitors. 2. Opportunities to enhance the airport and associated train station as a sustainable multi modal transport hub and to improve surface access, minimise congestion and environmental impacts in collaboration with the highway authorities will be supported. 3. The development of skills training and work placement initiatives between the airport, on-site and neighbouring employers, local educational institutions and local communities, will be supported. This will help increase both the aviation and non-aviation-related skills base in the local area and meet local employment needs. Airport Safeguarding 4. Development that would adversely affect the operational integrity or safety of London Southend Airport will be assessed to ensure as far as practicable, that the airport and its surrounding airspace is not adversely impacted by the proposal. Where required, the Local Planning Authority will consult with the airport operator and/or the operator of Communication, Navigation & Surveillance (CNS) equipment on relevant proposals in the aerodrome safeguarded areas. With respect to operational considerations, this includes (but is not limited to) concerns over height of buildings associated cranes, telecommunications apparatus, lighting, glare, significant bird activity, and within or in proximity to Public Safety Zones. Airport Expansion 5. Proposals for expansion of the airport and its operation, together with any associated surface access improvements, will be assessed against the Local Plan and JAAP policies taking account of the wider sub-regional impact of the airport. Proposals for development will be supported where all of the following criteria are met, having regard to the nature and scale of such proposals as appropriate: i. they are Airport related; ii. they are in accordance with the adopted JAAP or an up-to-date joint Airport master plan published by the operators of London Southend Airport and adopted by Rochford District Council and Southend City Council; iii. they fully assess the impacts of any increase in Air Transport Movements on surrounding occupiers and/or the local environment (in terms of noise, disturbance, air quality flooding, waste management, water management, ecological and climate change impacts); iv. achieve noise reduction or no material increase in day or nighttime noise in accordance with the airport’s most recent Airport Noise Action Plan; v. include proposals that will, over time, result in a significant diminution and betterment of the effects of aircraft operations on the amenity of local residents in the area, through measures to be taken to secure fleet modernisation or otherwise; vi. incorporate sustainable transportation and surface access measures, including through the introduction of new technologies, that, in particular, minimise use of the private car, maximise the use of sustainable and inclusive transport modes, facilitate modal shift, in accordance with the London Southend Airport Surface Access Strategy; vii. include a clear and measurable plan for achieving zero-carbon operation of the Airport terminal and facilities and working with aircraft operators to reduce their carbon footprint, including through the introduction of the latest most efficient aviation industry recognised aircraft; viii. consider and appropriately address the impact on heritage assets including below ground archaeology; ix. include robust monitoring mechanisms that ensures the current and future operations at the airport are fully in accordance with the policies of this plan and any future planning permission/s which is/are granted. Why we have taken this approach Background 11.1 London Southend Airport is a key regional transport hub providing a gateway to Europe and helping to generate important economic investment and jobs in Southend and south Essex. The airport lies partly in Southend-on-Sea and partly in the District of Rochford and both Southend and Rochford Councils are relevant planning authorities. 11.2 As part of the Airport’s expansion and development plans in 2010, Southend Council considered very carefully how best to achieve an appropriate balance between encouraging airport development and economic growth; while adopting tough measures to protect residents as much as possible from the environmental impact of aircraft movements, particularly at night. 11.3 Regular passenger flights to European destinations commenced from the airport in April 2012, after planning permission for the runway extension was granted in April 2010. At that point new controls 152 came into effect, these impose much more stringent controls on flights, and especially night time movements. Compliance is monitored by the Airport Consultative Committee 153. The new controls included the following important restrictions: ● the number of possible night flights per month has been reduced from more than 900 to 120; ● the night period has been increased from 6 hours to 7.5 hours; 152 The controls are set out in two planning agreements (s.106 agreements) which can be accessed on the Public Access pages of this website under application reference 09/01960/FULM. The controls are replicated in leases which can be obtained from the Land Registry. 153 The Airport Consultative Committee (ACC) meets each quarter and is comprised of representatives from local authorities, community groups and airport users under the provisions of the Civil Aviation Act 1982 (Section 35) and has no executive powers. ● strict noise controls have been introduced on aircraft operating from the airport; ● night time passenger flights are generally restricted; and ● there is now a runway preference scheme to restrict the number of take offs and landings over the south west, Leigh-on-Sea area. 11.4 In addition, a Frequently Asked Questions document has been prepared, together with a clear summary of the new controls Operational Controls Summary Table . Adopted Joint Area Action Plan (JAAP) for the Airport and environs 11.5 Southend-on-Sea City Council, together with Rochford District Council, jointly prepared and adopted the Southend Airport and Environs Joint Area Action Plan (JAAP) in 2014. This followed permission for the extension of the airport’s runway, seeking to maximise local economic benefits of the growth through the vision of an area that realises its potential as a driver for the sub-regional economy, providing significant employment opportunities and ensuring a good quality of life for its residents and workers. The JAAP established the following objectives to achieve this: ● maximising the economic benefits of a thriving airport and related activity; ● ensuring good connectivity to the development area by all modes of transport, with appropriate improvements to sustainable transport and the highway network; ● ensuring a high-quality public realm and environment for residents and workers; ● seeking maximum return on public investment through attracting inward investment; and ● developing efficient use and upgrading of existing employment land resources. 11.6 The JAAP sets out how the airport is expected to grow in a sustainable manner up to 2031 and includes policies covering both development within the curtilage of the airport itself, and that of designated employment sites within the surrounding designated area, which were to deliver over 100,000 m2 of employment floorspace and 5,000 additional jobs. These jobs contribute to the delivery of the jobs totals for Rochford District Council and Southend-on-Sea City Council – the apportionment to each district is based on a 50-50 split of the overall jobs total to be provided within the JAAP area154. 11.7 Whilst the intervening years since the JAAP’s adoption have seen the emergence of a range of unforeseen impacts on the airport (e.g. COVID-19 pandemic and more recent socio-economic impacts), over time the airport and adjacent employment sites have experienced substantial growth and development, guided by the JAAP policies. 11.8 The JAAP continues to provide a relevant long-term vision for the Airport and its environs. The Airport’s growth to date has helped to deliver additional jobs alongside substantial new infrastructure. This has included a new business park, state of the art air traffic control tower, runway extension, railway station, passenger terminal and 154 JAAP 2014 Policy E1 – General Development Considerations 155 Aviation policy framework - GOV.UK (www.gov.uk) (2013); Beyond the horizon the future of UK aviation (publishing.service.gov.uk) (2018); Overarching aviation noise policy - GOV.UK (www.gov.uk) (2023); Flightpath to the future: a strategic framework for the aviation sector - GOV.UK (www.gov.uk) (2022) 156 Beyond the horizon the future of UK aviation (publishing.service.gov.uk) (2018) associated on-site hotel facilities. It has also witnessed new and improved bus routes and supported successful funding bids for capacity improvements to the local road network. 11.9 In 2019/20, the Airport served approximately 2.1 million passengers which was an increase of around 43% from the previous year, and a doubling of 2017 numbers. Whilst the Airport has been deeply affected by economic circumstances during and following the pandemic it remains well-placed to grow in the future and is predicted to recover and exceed pre-covid levels by 2026-27. National Aviation Policy and Guidance 11.10 Planning permission for the Airport limits the number of air traffic movements to 53,300 per year with around 37,000 movements taking place in the 2019-20 financial year. Whilst the use of larger aircraft could allow passenger movements to increase, any longer- term growth aspirations beyond 53,300 movements a year would require a new planning framework and agreement. This framework would need to weigh up the various benefits and challenges presented by the Airport’s growth, including the strong economic benefits alongside air quality, traffic, climate change and noise considerations. It should also consider recent Government aviation policy and related guidance 155, including: ● to make the best use of existing runway capacity 156; ● to ensure the aviation sector makes a significant contribution towards reducing global emissions and achieving Net Zero; ● to ensure communities surrounding airports share in the economic benefits and adverse impacts such as noise are mitigated wherever possible; ● to limit and where possible reduce the number of people significantly affected by noise; ● that Government, local authorities and airports should work together to improve air quality. 11.11 The Government is clear that the local planning application process is equipped to deal with applications for airports to increase passenger caps by fewer than 10 million passengers per annum 157, and is supportive of airports seeking to expand. Local authorities must consult fully and judge such proposals on their individual merits, taking careful account of all relevant considerations, particularly economic and environmental impacts, along with proposed mitigation. 11.12 The Airports National Policy Statement (2018), although focused on building strategic aviation hub capacity at London Heathrow, contains a useful set of assessment principles and impacts in Chapters 4 and 5, many of which are generic and apply to all airport expansion proposals. These include: ● climate change adaptation and carbon emissions; ● pollution control and environmental protection (including air/water quality); ● noise; ● health; ● accessibility; ● surface access; 157 Beyond the horizon the future of UK aviation (publishing.service.gov.uk) (2018) ● resources and waste management; ● landscape and visual impact; ● community engagement; ● skills; and ● flood risk 11.13 Any future proposals to extend or adapt Southend Airport in respect of its aviation and ancillary activities should have regard to these principles. London Southend Airport Recovery 11.14 Since the devastating impact of the Covid pandemic on its operation and use, the Airport now has long-term plans to increase passenger numbers beyond pre-pandemic levels. The gradual return of flights and passenger numbers indicates a recovery is underway as witnessed by the significant increase in destinations from three to fifteen, a return to year-round flying, a successful transition of ownership and the return of airline partner easyJet as part of a multi-year deal which will see three based aircraft on-site from the summer of 2025. 11.15 A return to growth is likely to have a range of both positive and negative impacts on the local area and any growth beyond the current agreed operating limits will need careful management through the planning system. Expansion on the site brings opportunities for direct and indirect local employment (including enhancing skills and training), for increased infrastructure investment, and in improving local sustainable transport connectivity, using the Airport site as a ‘hub’ for different modes of transport. However, it also brings a risk of issues such as air and noise pollution, traffic congestion and increased carbon emissions. 11.16 The Council will continue to work with partners to realise the airport’s economic potential as the aviation industry recovers, whilst having regard to local amenity and environmental issues. The JAAP, along with the established forums for dialogue between the airport and relevant partners and stakeholders (i.e., the Airport Consultative Committee, Airport Transport Forum, Community Noise Forum, Airport Liaison Group and Transport Liaison Group), will enable the Council to regulate the operation of the airport through balancing noise and environmental issues with residential amenity. 11.17 In the longer term, the Council will work with the Airport, Rochford District Council, Essex County Council and other partners to develop an appropriate planning framework to replace the JAAP, should this be deemed necessary. It will also work constructively with partners to ensure a robust and up-to-date suite of monitoring documents is in place to manage Airport operations, including any changes to the existing Section 106 agreement. 11.18 In accordance with the existing Section 106 agreement, the Council will continue to work with the airport and other local authority partners to improve and promote sustainable travel opportunities for both staff and visitors at the airport. Opportunities to further enhance the airport’s role as a sustainable, multi-modal transport hub, acting as an interchange of bus, rail and active travel routes for the wider area and to improve surface access to the Airport, will also be explored. 158 Aviation Policy Framework (publishing.service.gov.uk) (2013). Annex B contains guidance on the content of master plans, airport transport forums and airport surface access strategies. 11.19 In the event that planning permission was sought to grow the airport prior to a review of the JAAP, the Council would expect this to have regard to Policy SP11 and be in conformity with an up-to-date joint Airport Masterplan 158 published by the operators of London Southend Airport and adopted by Rochford District Council and Southend City Council. Airport Safeguarding 11.20 There are two elements to safeguarding at London Southend Airport. ● Public Safety Zones (PSZ’s) are triangular areas located at the end of runways as defined in the DfT Policy Paper “Control of development in airport public safety zones” (updated October 2021). PSZ’s restrict new development such as housing and employment within the designated area. ● Airport Safeguarding Zones are intended to make sure that there isn’t a conflict between new development above a certain height and the safe operation of aircraft, including any impacts on radar, instrument landing systems and air traffic control equipment. Aerodrome safeguarding is an international and national requirement by the International Civil Aviation Organization (ICAO) and the Civil Aviation Authority (CAA). It is embedded in the Town & Country Planning process by way of ODPM/DfT Circular 01/2003 ‘Safeguarding of Aerodromes & Military Explosives Storage Areas’ Direction 2002. As a Local Planning Authority, the City Council consults the Airport on applications that meet the defined locational and elevational criteria and are set out in Safeguarding maps. The Safeguarding Zone for London Southend Airport covers the whole City of Southend. Consultation responses may identify the need for restrictions on the height or design of proposed buildings and structures to ensure there is no unacceptable impact on Obstacle Limitation Surfaces (OLS), Instrument Flight Procedures (IFPs) and/or Communication, Navigation & Surveillance (CNS) equipment. Development proposals will only be supported where they are demonstrated to be compatible with the continued safe operation of London Southend Airport. Consultation requirements can be found on the aerodrome safeguarding consultation map. Proposals that cannot be mitigated to the satisfaction of the local planning authority in consultation with the statutory consultee and are considered to be a hazard to aircraft safety will be refused. Developers are encouraged to engage the airport at an early stage for pre-application assessments. 240 | Southend Local Plan • Proposed Submission Draft (Regulation 19) 11. London Southend Airport This page is intentionally left blank.
Climate & energyJobs & economyTransport & travel📍 Leigh📍 Leigh-on-Sea📍 London Southend Airport📍 Rochford📍 Southend📍 Southend-on-Sea
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.