Strategic Policy SP11: London Southend Airport
1. The Council will continue to work with Rochford District Council to deliver the existing Joint Area Action Plan (JAAP) for the Airport and
environs, along with any future review or preparation of a joint masterplan as required. This includes policies governing the development and
monitoring of airport operations; development of employment sites surrounding the airport within the JAAP boundaries; and promotion and
monitoring of sustainable travel opportunities for both staff and visitors.
2. Opportunities to enhance the airport and associated train station as a sustainable multi modal transport hub and to improve surface access,
minimise congestion and environmental impacts in collaboration with the highway authorities will be supported.
3. The development of skills training and work placement initiatives between the airport, on-site and neighbouring employers, local educational
institutions and local communities, will be supported. This will help increase both the aviation and non-aviation-related skills base in the local
area and meet local employment needs.
Airport Safeguarding
4. Development that would adversely affect the operational integrity or safety of London Southend Airport will be assessed to ensure as far
as practicable, that the airport and its surrounding airspace is not adversely impacted by the proposal. Where required, the Local Planning
Authority will consult with the airport operator and/or the operator of Communication, Navigation & Surveillance (CNS) equipment on relevant
proposals in the aerodrome safeguarded areas. With respect to operational considerations, this includes (but is not limited to) concerns over
height of buildings associated cranes, telecommunications apparatus, lighting, glare, significant bird activity, and within or in proximity to Public
Safety Zones.
Airport Expansion
5. Proposals for expansion of the airport and its operation, together with any associated surface access improvements, will be assessed against
the Local Plan and JAAP policies taking account of the wider sub-regional impact of the airport. Proposals for development will be supported
where all of the following criteria are met, having regard to the nature and scale of such proposals as appropriate:
i. they are Airport related;
ii. they are in accordance with the adopted JAAP or an up-to-date joint Airport master plan published by the operators of London Southend
Airport and adopted by Rochford District Council and Southend City Council;
iii. they fully assess the impacts of any increase in Air Transport Movements on surrounding occupiers and/or the local environment (in terms of
noise, disturbance, air quality flooding, waste management, water management, ecological and climate change impacts);
iv. achieve noise reduction or no material increase in day or nighttime noise in accordance with the airport’s most recent Airport Noise Action
Plan;
v. include proposals that will, over time, result in a significant diminution and betterment of the effects of aircraft operations on the amenity of
local residents in the area, through measures to be taken to secure fleet modernisation or otherwise;
vi. incorporate sustainable transportation and surface access measures, including through the introduction of new technologies, that,
in particular, minimise use of the private car, maximise the use of sustainable and inclusive transport modes, facilitate modal shift, in
accordance with the London Southend Airport Surface Access Strategy;
vii. include a clear and measurable plan for achieving zero-carbon operation of the Airport terminal and facilities and working with aircraft
operators to reduce their carbon footprint, including through the introduction of the latest most efficient aviation industry recognised aircraft;
viii. consider and appropriately address the impact on heritage assets including below ground archaeology;
ix. include robust monitoring mechanisms that ensures the current and future operations at the airport are fully in accordance with the policies
of this plan and any future planning permission/s which is/are granted.
Why we have taken this approach
Background
11.1 London Southend Airport is a key regional transport hub providing
a gateway to Europe and helping to generate important economic
investment and jobs in Southend and south Essex. The airport lies
partly in Southend-on-Sea and partly in the District of Rochford
and both Southend and Rochford Councils are relevant planning
authorities.
11.2 As part of the Airport’s expansion and development plans in 2010,
Southend Council considered very carefully how best to achieve
an appropriate balance between encouraging airport development
and economic growth; while adopting tough measures to protect
residents as much as possible from the environmental impact of
aircraft movements, particularly at night.
11.3 Regular passenger flights to European destinations commenced
from the airport in April 2012, after planning permission for the
runway extension was granted in April 2010. At that point new
controls 152 came into effect, these impose much more stringent
controls on flights, and especially night time movements.
Compliance is monitored by the Airport Consultative Committee 153.
The new controls included the following important restrictions:
● the number of possible night flights per month has been reduced
from more than 900 to 120;
● the night period has been increased from 6 hours to 7.5 hours;
152 The controls are set out in two planning agreements (s.106 agreements) which can be accessed on the Public Access pages of this website under application reference 09/01960/FULM. The controls are replicated in
leases which can be obtained from the Land Registry.
153 The Airport Consultative Committee (ACC) meets each quarter and is comprised of representatives from local authorities, community groups and airport users under the provisions of the Civil Aviation Act 1982
(Section 35) and has no executive powers.
● strict noise controls have been introduced on aircraft operating from
the airport;
● night time passenger flights are generally restricted; and
● there is now a runway preference scheme to restrict the number of
take offs and landings over the south west, Leigh-on-Sea area.
11.4 In addition, a Frequently Asked Questions document has been
prepared, together with a clear summary of the new controls
Operational Controls Summary Table .
Adopted Joint Area Action Plan (JAAP) for the Airport and environs
11.5 Southend-on-Sea City Council, together with Rochford District
Council, jointly prepared and adopted the Southend Airport and
Environs Joint Area Action Plan (JAAP) in 2014. This followed
permission for the extension of the airport’s runway, seeking to
maximise local economic benefits of the growth through the vision
of an area that realises its potential as a driver for the sub-regional
economy, providing significant employment opportunities and
ensuring a good quality of life for its residents and workers. The
JAAP established the following objectives to achieve this:
● maximising the economic benefits of a thriving airport and related
activity;
● ensuring good connectivity to the development area by all modes
of transport, with appropriate improvements to sustainable transport
and the highway network;
● ensuring a high-quality public realm and environment for residents
and workers;
● seeking maximum return on public investment through attracting
inward investment; and
● developing efficient use and upgrading of existing employment land
resources.
11.6 The JAAP sets out how the airport is expected to grow in a
sustainable manner up to 2031 and includes policies covering both
development within the curtilage of the airport itself, and that of
designated employment sites within the surrounding designated
area, which were to deliver over 100,000 m2 of employment
floorspace and 5,000 additional jobs. These jobs contribute to
the delivery of the jobs totals for Rochford District Council and
Southend-on-Sea City Council – the apportionment to each district
is based on a 50-50 split of the overall jobs total to be provided
within the JAAP area154.
11.7 Whilst the intervening years since the JAAP’s adoption have seen
the emergence of a range of unforeseen impacts on the airport (e.g.
COVID-19 pandemic and more recent socio-economic impacts), over
time the airport and adjacent employment sites have experienced
substantial growth and development, guided by the JAAP policies.
11.8 The JAAP continues to provide a relevant long-term vision for the
Airport and its environs. The Airport’s growth to date has helped to
deliver additional jobs alongside substantial new infrastructure. This
has included a new business park, state of the art air traffic control
tower, runway extension, railway station, passenger terminal and
154 JAAP 2014 Policy E1 – General Development Considerations
155 Aviation policy framework - GOV.UK (www.gov.uk) (2013); Beyond the horizon the future of UK aviation (publishing.service.gov.uk) (2018); Overarching aviation noise policy - GOV.UK (www.gov.uk) (2023);
Flightpath to the future: a strategic framework for the aviation sector - GOV.UK (www.gov.uk) (2022)
156 Beyond the horizon the future of UK aviation (publishing.service.gov.uk) (2018)
associated on-site hotel facilities. It has also witnessed new and
improved bus routes and supported successful funding bids for
capacity improvements to the local road network.
11.9 In 2019/20, the Airport served approximately 2.1 million passengers
which was an increase of around 43% from the previous year,
and a doubling of 2017 numbers. Whilst the Airport has been
deeply affected by economic circumstances during and following
the pandemic it remains well-placed to grow in the future and is
predicted to recover and exceed pre-covid levels by 2026-27.
National Aviation Policy and Guidance
11.10 Planning permission for the Airport limits the number of air traffic
movements to 53,300 per year with around 37,000 movements
taking place in the 2019-20 financial year. Whilst the use of larger
aircraft could allow passenger movements to increase, any longer-
term growth aspirations beyond 53,300 movements a year would
require a new planning framework and agreement. This framework
would need to weigh up the various benefits and challenges
presented by the Airport’s growth, including the strong economic
benefits alongside air quality, traffic, climate change and noise
considerations. It should also consider recent Government aviation
policy and related guidance 155, including:
● to make the best use of existing runway capacity 156;
● to ensure the aviation sector makes a significant contribution
towards reducing global emissions and achieving Net Zero;
● to ensure communities surrounding airports share in the economic
benefits and adverse impacts such as noise are mitigated wherever
possible;
● to limit and where possible reduce the number of people
significantly affected by noise;
● that Government, local authorities and airports should work together
to improve air quality.
11.11 The Government is clear that the local planning application process
is equipped to deal with applications for airports to increase
passenger caps by fewer than 10 million passengers per annum 157,
and is supportive of airports seeking to expand. Local authorities
must consult fully and judge such proposals on their individual
merits, taking careful account of all relevant considerations,
particularly economic and environmental impacts, along with
proposed mitigation.
11.12 The Airports National Policy Statement (2018), although focused
on building strategic aviation hub capacity at London Heathrow,
contains a useful set of assessment principles and impacts in
Chapters 4 and 5, many of which are generic and apply to all airport
expansion proposals. These include:
● climate change adaptation and carbon emissions;
● pollution control and environmental protection (including air/water
quality);
● noise;
● health;
● accessibility;
● surface access;
157 Beyond the horizon the future of UK aviation (publishing.service.gov.uk) (2018)
● resources and waste management;
● landscape and visual impact;
● community engagement;
● skills; and
● flood risk
11.13 Any future proposals to extend or adapt Southend Airport in respect
of its aviation and ancillary activities should have regard to these
principles.
London Southend Airport Recovery
11.14 Since the devastating impact of the Covid pandemic on its operation
and use, the Airport now has long-term plans to increase passenger
numbers beyond pre-pandemic levels. The gradual return of
flights and passenger numbers indicates a recovery is underway
as witnessed by the significant increase in destinations from three
to fifteen, a return to year-round flying, a successful transition of
ownership and the return of airline partner easyJet as part of a
multi-year deal which will see three based aircraft on-site from the
summer of 2025.
11.15 A return to growth is likely to have a range of both positive and
negative impacts on the local area and any growth beyond the
current agreed operating limits will need careful management
through the planning system. Expansion on the site brings
opportunities for direct and indirect local employment (including
enhancing skills and training), for increased infrastructure
investment, and in improving local sustainable transport
connectivity, using the Airport site as a ‘hub’ for different modes of
transport. However, it also brings a risk of issues such as air and
noise pollution, traffic congestion and increased carbon emissions.
11.16 The Council will continue to work with partners to realise the
airport’s economic potential as the aviation industry recovers, whilst
having regard to local amenity and environmental issues. The JAAP,
along with the established forums for dialogue between the airport
and relevant partners and stakeholders (i.e., the Airport Consultative
Committee, Airport Transport Forum, Community Noise Forum,
Airport Liaison Group and Transport Liaison Group), will enable the
Council to regulate the operation of the airport through balancing
noise and environmental issues with residential amenity.
11.17 In the longer term, the Council will work with the Airport, Rochford
District Council, Essex County Council and other partners to
develop an appropriate planning framework to replace the JAAP,
should this be deemed necessary. It will also work constructively
with partners to ensure a robust and up-to-date suite of monitoring
documents is in place to manage Airport operations, including any
changes to the existing Section 106 agreement.
11.18 In accordance with the existing Section 106 agreement, the Council
will continue to work with the airport and other local authority
partners to improve and promote sustainable travel opportunities for
both staff and visitors at the airport. Opportunities to further enhance
the airport’s role as a sustainable, multi-modal transport hub, acting
as an interchange of bus, rail and active travel routes for the wider
area and to improve surface access to the Airport, will also be
explored.
158 Aviation Policy Framework (publishing.service.gov.uk) (2013). Annex B contains guidance on the content of master plans, airport transport forums and airport surface access strategies.
11.19 In the event that planning permission was sought to grow the airport
prior to a review of the JAAP, the Council would expect this to
have regard to Policy SP11 and be in conformity with an up-to-date
joint Airport Masterplan 158 published by the operators of London
Southend Airport and adopted by Rochford District Council and
Southend City Council.
Airport Safeguarding
11.20 There are two elements to safeguarding at London Southend
Airport.
● Public Safety Zones (PSZ’s) are triangular areas located at the
end of runways as defined in the DfT Policy Paper “Control of
development in airport public safety zones” (updated October 2021).
PSZ’s restrict new development such as housing and employment
within the designated area.
● Airport Safeguarding Zones are intended to make sure that
there isn’t a conflict between new development above a certain
height and the safe operation of aircraft, including any impacts
on radar, instrument landing systems and air traffic control
equipment. Aerodrome safeguarding is an international and national
requirement by the International Civil Aviation Organization (ICAO)
and the Civil Aviation Authority (CAA). It is embedded in the Town
& Country Planning process by way of ODPM/DfT Circular 01/2003
‘Safeguarding of Aerodromes & Military Explosives Storage Areas’
Direction 2002. As a Local Planning Authority, the City Council
consults the Airport on applications that meet the defined locational
and elevational criteria and are set out in Safeguarding maps.
The Safeguarding Zone for London Southend Airport covers the
whole City of Southend. Consultation responses may identify the
need for restrictions on the height or design of proposed buildings
and structures to ensure there is no unacceptable impact on
Obstacle Limitation Surfaces (OLS), Instrument Flight Procedures
(IFPs) and/or Communication, Navigation & Surveillance (CNS)
equipment. Development proposals will only be supported where
they are demonstrated to be compatible with the continued safe
operation of London Southend Airport. Consultation requirements
can be found on the aerodrome safeguarding consultation map.
Proposals that cannot be mitigated to the satisfaction of the local
planning authority in consultation with the statutory consultee and
are considered to be a hazard to aircraft safety will be refused.
Developers are encouraged to engage the airport at an early stage
for pre-application assessments.