← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend Plan Explorer

London Southend Airport

18 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.

The human version (we wrote this, not the council)This section sets out Southend's context and main issues. The city boundary tightly abuts the urban area and the countryside around it is Green Belt, so land is very limited. Southend has 83,500 dwellings housing 182,000 people, and the Government Standard Method says 1,405 new homes are needed each year. There are around 80,000 jobs, and 86% of companies employ 10 staff or fewer. The resort draws around 7 million day visitors and over 200,000 staying visitors a year. The section also covers seven miles of foreshore, over 500 hectares of green space, flood risk, congestion on the A127 and A13, and the Airport's recovery after Covid-19.

The human version (we wrote this, not the council)This section sets out the vision and strategic objectives for the Local Plan. It draws on the Southend City Vision, 'Our City, Our Future', which looks to 2035. The long term vision is of a prosperous, well connected and sustainable "City by the Sea" with distinct neighbourhoods and a cherished coastal identity. There are 24 strategic objectives, grouped under themes from a city that is healthy and safe to a city that is connected and smart. They include an 'infrastructure led' approach, complete neighbourhoods, a choice of homes, a regenerated City Centre, more green space and the growth of London Southend Airport.

The human version (we wrote this, not the council)This policy, Strategic Policy SP1, sets out the Spatial Principles that all new development must follow where relevant. Development should be served by the infrastructure it needs, using an 'infrastructure led' approach. It should make the best use of previously developed land and minimise the use of greenfield land. The openness of the Green Belt will be protected. The policy supports tourism, culture and economic growth at the City Centre, London Southend Airport and the employment areas. It also asks for good design, sustainable travel, support for existing centres, resilience to climate change, protection of heritage, net gains in biodiversity, and care over unstable land.

The human version (we wrote this, not the council)This policy, Policy DM6.2, requires major developments to help local people into work and training. It applies to schemes of 50 or more dwellings, or more than 5,000sqm of non-residential floorspace. Developers must submit an Employment and Skills Plan, secured through a Section 106 agreement. The plan should show how the scheme will support jobs and skills during construction and, for commercial schemes, once the building is in use. Examples include apprenticeships and paid job placements. A monitoring fee is paid when development starts. It ranges from £2,000 for build costs up to £25 million to £8,000 for £75 to 100 million.

The human version (we wrote this, not the council)This policy, Policy DM6.6, covers tourism and visitor accommodation. The Central Seafront is the main focus for new tourist attractions, with the City Centre and wider Seafront, including Leigh-on-Sea and Shoeburyness, also supported. Major tourism schemes must improve sustainable travel for visitors. The foreshore, parks and gardens will be protected. New visitor accommodation should be in the Key Areas: Southend Central Neighbourhood, the District Centres of Leigh and Westcliff, and places closely linked to the Seafront and London Southend Airport. Visitor accommodation there is kept unless no longer viable. Changing homes to holiday lets used over 90 days a year is assessed for housing and amenity impacts.

The human version (we wrote this, not the council)This policy, Strategic Policy SP7, sets the approach to urban design, character and heritage. Development must enhance local character, follow design guidance and codes, improve the public realm and include urban greening such as tree planting. It must be safe, inclusive and accessible from the outset. Design Review Panels are encouraged for schemes of 50+ residential units or sensitive sites. Tall Buildings are supported in Southend City Centre and the Central Seafront area, and elsewhere only in exceptional circumstances. The policy also covers advertisements, shopfronts and refuse storage. Schemes of 50 or more residential units or 5,000sqm or more non-residential floorspace should include public art.

The human version (we wrote this, not the council)This policy sets out how all development should achieve good design and a better public realm, reinforcing local character. Proposals must add to the quality of the area, including layout, height, scale, landscaping and materials, with active public fronting elevations. They must protect neighbours' privacy, outlook, daylight and sunlight, and limit noise. Layouts should be safe, accessible and inclusive, putting pedestrians and cyclists first, and use Secured by Design principles. Schemes should adapt to changing needs, follow circular economy principles and meet space standards. Around buildings, proposals should create safe routes for active travel and use high quality street furniture, public art, landscaping and trees, keeping spaces free from clutter.

The human version (we wrote this, not the council)This policy says development must make good use of land in a sustainable way that fits its setting, without over-intensification or too much burden on infrastructure such as transport. Higher densities through a design-led approach are encouraged, especially in the City Centre, key growth areas and the allocations in Chapter 12. Backland and infill schemes are judged site by site and allowed unless they harm living conditions, clash with local character, affect highway safety, leave unusable gardens or lose wildlife habitats or important trees. Redeveloping bungalows will be resisted in streets of mainly single storey homes. Extensions, including 'airspace' development, must use fitting materials and a respectful scale.

The human version (we wrote this, not the council)This policy says tall and large buildings will be permitted in the City Centre and Central Seafront area where they meet set criteria and other policies, including DM7.6: Heritage. Elsewhere they will only be considered in appropriate locations in exceptional circumstances, judged case by case on existing character, urban grain and nearby heritage assets. All tall buildings must have exemplar design and high quality materials, be energy efficient with on-site renewable energy, and avoid harm from wind, overshadowing, noise or glare. They should form a distinctive landmark, provide usable amenity space, have well designed ground floors, be near frequent public transport, and not harm London Southend Airport or heritage assets.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says Southend sits on a peninsula at the mouth of the Thames Estuary, with a mainly east to west transport corridor. The main roads are the A127 and A13/A1159, linking to the M25, the Dartford River Crossing and the A130. Two railway lines, the c2c line and the Great Eastern main line, link the city to London, and there are nine railway stations in the area. North to south links are limited, especially by public transport. Road congestion affects the economy and tourism, car ownership is just over one car per household, and electric charging points are limited.

The human version (we wrote this, not the council)This section introduces the chapter on London Southend Airport. It says there has been an airfield on the site for over 100 years, and in the 1960s it was the 3rd busiest airport in the UK. The airport straddles the boundary between Rochford District Council and Southend City Council. It is a key employer, with 87% of staff living in the SS postcode area. A Joint Area Action Plan with Rochford sets the planning framework to 2031. In 2019 it had over 2.1 million passengers. Covid cut numbers by over 90%, but they are predicted to exceed pre-covid levels by 2026-27.

The human version (we wrote this, not the council)This policy says the Council will keep working with Rochford District Council to deliver the Joint Area Action Plan (JAAP) for London Southend Airport and its surroundings. It supports making the airport and its station a sustainable transport hub, plus local skills and work placement schemes. Development that could harm safe airport operation, such as tall buildings, cranes, lighting or glare, will be assessed, consulting the airport where needed. Expansion will only be supported if it is airport related, follows the JAAP or a joint master plan, assesses impacts such as air quality, causes no material increase in noise, cuts car use, plans for zero-carbon operation and is closely monitored.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Eastwood. New development must support healthy lifestyles and be matched by needed infrastructure. Existing homes, including family housing, should be safeguarded, and good quality windfall development is welcomed in the Neighbourhood Centre and Passenger Transport Corridor. Employment floorspace will be protected, including at the Progress Road growth area. Densities may rise along Rayleigh Road where flats suit the local character. The policy seeks public realm improvements, urban greening, better parks such as Oakwood and Eastwood, and tree planting. It also promotes better links to Leigh Railway Station and London Southend Airport, and safer walking and cycling routes.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Prittlewell. New development must support health and wellbeing and be matched by the infrastructure it needs. Urban greening along the A127 is encouraged to help air quality. Existing homes are safeguarded and new homes come from sites in Policy N3i. The employment areas at Thanet Grange and Priory Works are protected. The policy supports renewing Roots Hall stadium, linked to Fossetts Farm. It aims to conserve Prittlewell Conservation Area, protect green space, plant trees and avoid flood risk. It also backs better bus, walking and cycling routes, step free access at Prittlewell station and growth at London Southend Airport.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Fossetts. New development must support health and wellbeing, be matched by the infrastructure it needs, and create a walkable, housing led neighbourhood. A range of homes, including family housing, will come from sites in Policy N7i. Employment areas at Stock Road, Temple Farm and Rosshill are protected. The Scheduled Monument at Prittlewell Camp will be conserved, with buffer zones as needed. The policy supports making Eastern Avenue easier to cross on foot and by bike. It also seeks to protect green space, plant trees, avoid flood risk, improve bus routes and fill cycle network gaps between Priory Park and Fossetts Way.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Shoeburyness. New development must support health and wellbeing and be matched by the infrastructure it needs. Existing homes are safeguarded, and new homes come from sites in Policy N9i. Employment areas at Towerfield Road, Vanguard Way and Campfield Road are protected. Shoebury Garrison Conservation Area and other heritage assets will be conserved. The policy seeks a green grid, better play space, tree planting and flood protection, and coastal defences will be upgraded in line with the Thames Estuary 2100 strategy. It backs a public transport corridor from Shoeburyness Station to London Southend Airport and a mobility hub at the station.

The human version (we wrote this, not the council)This section lists the current adopted planning policies that the Southend New Local Plan will replace once it is adopted. All policies in the Southend Core Strategy DPD (2007), the Southend Development Management DPD (2015) and the Southend Central Area Action Plan (SCAAP) (2018) will be replaced. From the London Southend Airport and Environs Joint Area Action Plan (JAAP) (2014), only two policies will be replaced: Policy E7, Nestuda Way Business Park, and Policy ENV3, Green Buffer South.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.