What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Strategic Policy SP2b: Bournes Green New
Neighbourhood – Land North of Southend Guiding
Principles
3.7 The provision of a new neighbourhood at Bournes Green on land
north of Southend (LNOS) represents a significant opportunity
to deliver comprehensive development and infrastructure. The
neighbourhood will deliver a substantial number of new homes
(4,900) and employment floorspace (12,500sqm) over the Local
Plan period, underpinned by a comprehensive package of new
infrastructure and supporting uses, including for education,
health, community facilities, a network of formal green and blue
Infrastructure, including significant parkland and public open spaces,
sport, recreation and new and improved transport connections and
services.
3.8 The boundary for the new neighbourhood allocation is defined
on the Policies Map (annotated as BG001) with uses detailed in
Policy DM2b. The development will provide for a large sustainable
urban extension to the north of Southend and be based around
the Guiding Principles as set out in Strategic Policy SP2b. The
new neighbourhood will be linked by a new multi-modal transport
corridor. The corridor will feature varied open spaces and
community centres acting as the central spine of the development,
with connections to nearby train station, the City Centre and the
wider strategic transport network. New urban villages centred
around vibrant and mixed local centres, will be arrayed along this
central spine, providing a new link between the A13 and A1159
through the development.
Context
3.9 Immediately to the south of Bournes Green is the existing urban
boundary of Southend, with the more suburban areas of the city
such as Thorpe Bay and Shoeburyness lying to the south. This
part of the existing urban area is largely defined by low-density,
suburban development.
3.10 To the west of Bournes Green, concentrated around the airport,
there are existing commercial and industrial assets such as
Temple Farm, Stock Road and the new Airport Business Park and
employment estates to the south in Shoeburyness. A significant city
scale community asset, Garon Park sits adjacent to Bournes Green,
which functions as a significant multi-use well-being, sports, golf
asset, also providing for other events.
3.11 The area is further characterised by:
● predominately farmland and 9 holes of golf course.
● two existing schools, public house, nursery, gymnasium, small
commercial uses and some private dwellings.
● being outside walking catchments to adjacent neighbourhood
centres and most existing primary schools. Parts of the existing
urban area of Southend are under-served by community
infrastructure and neighbourhood centres, especially areas to the
north of Thorpe Bay.
● located relatively close to Thorpe Bay train station. There is
congestion on adjacent roads where capacity issues at junctions
mainly located to the west will need to be mitigated. Like most of
Southend the area is subject to Airport Safeguarding Zone (see
Policy SP11).
● The presence of critical drainage areas which need to be
adequately addressed to manage surface water and not exacerbate
the risk of flooding.
● there are areas of deprivation (IMD) to the southwest and southeast
of Bournes Green, with conversely areas of affluence present to the
south at Thorpe Bay.
3.12 The land is primarily being promoted by two developers. One of
which is also promoting land within the district of Rochford adjacent
to Southend, which could form part of a wider longer-term proposal.
Opportunities
3.13 There are a number of key opportunities that should be addressed
through the provision of a new neighbourhood at Bournes Green.
The provision of a new neighbourhood, constituting and number
of urban villages, would make a significant contribution to meeting
local housing need, affordable and family housing and economic
development and employment floorspace.
3.14 Southend has a relatively high use of train travel and is served by
two lines that connect to London. Thorpe Bay train station is in close
proximity to the new neighbourhood, which can be designed to
ensure good access, particularly through walking and cycling.
3.15 Development provides the opportunity to improve and increase
habitat creation and climate resilience through the introduction of
extensive, additional green and blue infrastructure. This can happen
in parallel with the provision of new public open spaces for use by
the existing and new community.
3.16 Garon Park leisure complex and golf course is adjacent to the
new neighbourhood and is a significant destination for the city of
Southend and the wider area. This facility and the active landscapes
around it should be integrated into new development to form a
strong recreational focus for new and existing communities. Access
should be increased via new public transport routes and active
travel links that serve to connect the new communities with Garons
Park.
3.17 Southend City Centre is under 3 miles away with direct access
along the A13 and via Thorpe Bay train station. Further employment
destinations around the airport, T emple Farm and the industrial
estates in Shoeburyness are in close proximity. There are
opportunities to improve access, including via improved bus and
cycling, to these destinations as part of the new neighbourhood to
benefit new and existing communities.
3.18 The scale of new development within the LNOS area will have the
benefit of providing and supporting new community infrastructure
such as schools, parks and sports areas, GP’s and local centre
amenities.
3.19 New development will be infrastructure-led in order to create a high
quality balanced and sustainable new neighbourhood. Developers
must provide contributions for upgrades to the transport network,
including strategic highway improvements, public transport and
active travel. New community infrastructure must be provided
(education and health facilities), and new publicly accessible
green infrastructure, including a legally mandated 10% Biodiversity
Net Gain (BNG) through the Environment Act. The Southend
Infrastructure Delivery Plan provides details of infrastructure
requitements and is summarised in Appendix 4.
3.20 The allocation will provide new sport pitch provision but would
result in the loss of a 9-hole golf course at Garon Park. The existing
18-hole course to the west at Garon Park will be retained, along
with the club house and parking area, and adjacent adventure golf
facility. Development should contribute to enhancing the quality
and access of the retained golf provision at Garon Park, including
investment in course infrastructure and ancillary facilities.
3.21 Infrastructure upgrades will be provided on site by developers or
funded using a combination of the Community Infrastructure Levy
(CIL) and Section 106 agreements. An infrastructure schedule is set
out in the Southend Infrastructure Delivery Plan.
3.22 The Southend Infrastructure Delivery Plan has identified that
strategic scale green infrastructure is required to be delivered as
part of the wider SEEPARK vision for South Essex, and the Council’s
long held ambition for a country park in the north-east of the city to
meet residents’ needs. Natural England’s Accessible Greenspace
Standard for Districts is an accessible Greenspace of at least 100
hectares within 5km from home. The eastern end of Southend does
not meet this standard as it lies outside a 5km radius of Hadleigh
Country Park and Cherry Orchard Country Park. The Bournes Green
New Neighbourhood provides an opportunity to help to meet this
shortfall. Protected Green Space provision should seek to meet
Natural England Accessible Green Space Standards, as well as
requirements for Suitable Alternative Natural Greenspace (SANG)
of 8 hectares per 1,000 population. This is required to deflect
visitors away from designated coastal habitats sites. Where SANG
cannot be delivered on-site in a way that meets the Natural England
guidelines, enhancement of existing green spaces within the city
4 Natural England define Functionally Linked Land as “areas of land or sea occurring outside a designated site which are considered to be critical to, or necessary for, the ecological or behavioural functions in a relevant
season of a qualifying feature for which a Special Area of Conservation (SAC), Special Protection Area (SPA) or Ramsar site has been designated.” Balancing Nature and Development: The Humber Estuary Protected
Site Strategy Pilot – Natural England
may be appropriate providing it is secured via a legal agreement.
3.23 There is also a requirement to consider the importance of
functionally linked habitats 4 in order to ensure the integrity of
designated habitats. At least two seasons of wintering bird surveys
will be required for proposals within the strategic allocation
to establish if it is important for sustaining the non-breeding
populations of any of the Essex Coast Habitat Sites (such as by
determining whether the land regularly supports more than 1% of
the SPA/Ramsar population of specific qualifying species of non-
breeding birds.) If it is determined to be important functionally linked
land, appropriate mitigation measures will be required to ensure
no adverse effects on the integrity of the population of the Habitats
Sites, such as the enhancement of alternative areas of land to offsite
any loss, secured through a legal agreement.
Delivery and Stewardship
3.24 A Concept Framework will be prepared for the new neighbourhood
ensuring that a comprehensive and cohesive approach is taken
to the planning, design and implementation of development.
The endorsed Concept Framework will be taken into account as
an important material consideration in the determination of any
planning applications. The Concept Framework will provide a
high-level, evidence study that serves as a strategic guide for the
development. It should have regard to potential development
within Rochford and contain several core functions, including:
● Present an understanding of national and local policy as it relates to
the site;
● Provide a high-level vision for development that has more detailed
objectives to ensure high-quality and sustainable places;
● Define the spatial principles of the site and the development
parameters for the wider area to ensure cohesive development;
● Provides guidance on density, key nodes, green infrastructure, and
social infrastructure based on analysis.
● Consider delivery and governance.
3.25 The delivery of the new neighbourhood will be brought forward
incrementally over a number of phases over the plan period.
Each phase or urban village will be comprehensively designed
in accordance with the wider Concept Framework. The Council
requires Design Codes to be produced which accord with the
principles established by the Concept Framework. The Design
Codes must be approved by the Council and inform detailed
proposals for individual sites or urban village. The production of
design codes and detailed design proposals must be reviewed and
informed by a Quality Review Panel.
3.26 In delivering the neighbourhood there are several criteria that need
to considered:
● Delivery of community infrastructure, Protected Green Space and
transport enhancements in initial or early stages.
● A mix of house sizes and tenures, including a high proportion of
family housing, are delivered in each phase of development.
● Each phase of development contributes to the coordinated delivery
of the neighbourhood and relevant concept framework and design
codes.
3.27 To promote efficient and effective joint working and to front-load
the planning process, the use of Planning Performance Agreements
(PPAs) will be strongly encouraged. This will promote joint working
between all parties, including statutory consultees, and will assist
in identifying the issues that will need to be addressed prior to the
submission of planning applications.
3.28 Management and stewardship arrangements will be determined as
part of future planning permissions for the site. This will be achieved
through collaboration between the developers, the Council, and
other relevant stakeholders, and will be secured through planning
conditions and/ or planning obligations attached to planning
permissions.
3.29 The Council will require evidence that robust arrangements
are in place for the long-term stewardship of the country park.
Management and maintenance arrangements should be secured
for the lifetime of the development through an agreed management
plan and appropriate legal agreements. The Council’s preference
is for transfer of land to local authority ownership, followed by
transfer to the Land Trust or Local Wildlife Trust or similar body. If
the Country Park is to be managed by a third party, step-in rights
would need to be agreed through a planning obligation to ensure
that the Country Park would be managed in perpetuity should the
management company cease trading. Consideration should also
be given to how biodiversity net gain can be maximised through the
design and management of the park.
Strategic Policy SP2b: Bournes Green New Neighbourhood - Guiding Principles for Land North of Southend
1. Land North of Southend will deliver sustainable and resilient, high-quality integrated urban villages forming a new neighbourhood. These will
provide for a minimum of 4,900 new homes, 12,500 sqm employment floorspace, new accessible greenspace and associated infrastructure
and services within the Southend administrative area.
2. The design and development must have regard to a Concept Framework endorsed by the Council. Design principles specific to each new
urban village will be established through a design code which must be informed by Quality Review Panel. Planning applications within each
urban village must be in accordance with the relevant established design code which has been endorsed by the Council, and high standards
of design and placemaking will be expected, to reinforce local character.
3. Development Proposals must accord with the following principles:
i. The new neighbourhood will constitute new urban villages and be designed sensitively to take full account of topography and landform and
to successfully integrate with the existing urban areas of Southend;
ii. Provision of a country park and a series of green and blue landscape corridors along existing brooks/ ditches to provide flood risk
management, enhanced biodiversity and habitat creation, and active travel connections through the urban villages and connecting to the
wider area;
iii. Delivery will be phased and underpinned by a comprehensive package of infrastructure, including healthcare and schools, which addresses
the impacts of the new neighbourhood, having regard to the Infrastructure Delivery Plan;
iv. On-site and off-site infrastructure must be provided in a timely manner, ahead of or in tandem with the development to mitigate impacts,
meet the needs of residents and establish sustainable travel patterns;
v. Provide sustainable, integrated and well-planned development that incorporates a broad range of uses, infrastructure, Protected Green
Space and services and significant parkland, providing connections to existing parks and recreational spaces including Garon Park;
vi. Provide highway solutions to address the impact on the local and wider strategic road network, including junction and capacity
improvements and provide new public transport, and active travel corridors to provide bus permeability and connect the new
neighbourhood with key destinations including Southend city centre, open spaces, employment areas, education, train stations and health
facilities;
vii. Have due regard to London Southend Airport (Policy SP11);
viii. Create sociable, vibrant, healthy and walkable urban villages. Incorporate a network of safe and usable paths and streets for pedestrians,
cyclists and vehicles;
ix. Provide for balanced and inclusive communities through a range of high-quality new homes of mixed size, tenure and type which seeks to
address evidenced local needs. Provision should be made for a high proportion of family homes;
x. Provide local centres located along public transport corridors which include appropriate community, retail and town centre uses to support
the local population. Local centres should incorporate employment floorspace targeted at small and medium enterprises providing access
for all to local employment opportunities.
Bournes Green New Neighbourhood Allocation – development management policy