← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / SP2b

Policy SP2b

Bournes Green New Neighbourhood, Land North of Southend Guiding Principles

On pages 26 to 31 of the official PDF.

The human version

This policy, Strategic Policy SP2b, sets the guiding principles for the Bournes Green New Neighbourhood on Land North of Southend. It will deliver a minimum of 4,900 new homes and 12,500 sqm of employment floorspace as a series of urban villages. Design must have regard to a Council endorsed Concept Framework, with design codes informed by a Quality Review Panel. The principles include a country park, green and blue corridors along brooks, phased schools and healthcare, road and public transport improvements, links to Garon Park, a high proportion of family homes and local centres. A 9-hole golf course at Garon Park would be lost, but the 18-hole course is kept.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 26

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Strategic Policy SP2b: Bournes Green New Neighbourhood – Land North of Southend Guiding Principles 3.7 The provision of a new neighbourhood at Bournes Green on land north of Southend (LNOS) represents a significant opportunity to deliver comprehensive development and infrastructure. The neighbourhood will deliver a substantial number of new homes (4,900) and employment floorspace (12,500sqm) over the Local Plan period, underpinned by a comprehensive package of new infrastructure and supporting uses, including for education, health, community facilities, a network of formal green and blue Infrastructure, including significant parkland and public open spaces, sport, recreation and new and improved transport connections and services. 3.8 The boundary for the new neighbourhood allocation is defined on the Policies Map (annotated as BG001) with uses detailed in Policy DM2b. The development will provide for a large sustainable urban extension to the north of Southend and be based around the Guiding Principles as set out in Strategic Policy SP2b. The new neighbourhood will be linked by a new multi-modal transport corridor. The corridor will feature varied open spaces and community centres acting as the central spine of the development, with connections to nearby train station, the City Centre and the wider strategic transport network. New urban villages centred around vibrant and mixed local centres, will be arrayed along this central spine, providing a new link between the A13 and A1159 through the development. Context 3.9 Immediately to the south of Bournes Green is the existing urban boundary of Southend, with the more suburban areas of the city such as Thorpe Bay and Shoeburyness lying to the south. This part of the existing urban area is largely defined by low-density, suburban development. 3.10 To the west of Bournes Green, concentrated around the airport, there are existing commercial and industrial assets such as Temple Farm, Stock Road and the new Airport Business Park and employment estates to the south in Shoeburyness. A significant city scale community asset, Garon Park sits adjacent to Bournes Green, which functions as a significant multi-use well-being, sports, golf asset, also providing for other events. 3.11 The area is further characterised by: ● predominately farmland and 9 holes of golf course. ● two existing schools, public house, nursery, gymnasium, small commercial uses and some private dwellings. ● being outside walking catchments to adjacent neighbourhood centres and most existing primary schools. Parts of the existing urban area of Southend are under-served by community infrastructure and neighbourhood centres, especially areas to the north of Thorpe Bay. ● located relatively close to Thorpe Bay train station. There is congestion on adjacent roads where capacity issues at junctions mainly located to the west will need to be mitigated. Like most of Southend the area is subject to Airport Safeguarding Zone (see Policy SP11). ● The presence of critical drainage areas which need to be adequately addressed to manage surface water and not exacerbate the risk of flooding. ● there are areas of deprivation (IMD) to the southwest and southeast of Bournes Green, with conversely areas of affluence present to the south at Thorpe Bay. 3.12 The land is primarily being promoted by two developers. One of which is also promoting land within the district of Rochford adjacent to Southend, which could form part of a wider longer-term proposal. Opportunities 3.13 There are a number of key opportunities that should be addressed through the provision of a new neighbourhood at Bournes Green. The provision of a new neighbourhood, constituting and number of urban villages, would make a significant contribution to meeting local housing need, affordable and family housing and economic development and employment floorspace. 3.14 Southend has a relatively high use of train travel and is served by two lines that connect to London. Thorpe Bay train station is in close proximity to the new neighbourhood, which can be designed to ensure good access, particularly through walking and cycling. 3.15 Development provides the opportunity to improve and increase habitat creation and climate resilience through the introduction of extensive, additional green and blue infrastructure. This can happen in parallel with the provision of new public open spaces for use by the existing and new community. 3.16 Garon Park leisure complex and golf course is adjacent to the new neighbourhood and is a significant destination for the city of Southend and the wider area. This facility and the active landscapes around it should be integrated into new development to form a strong recreational focus for new and existing communities. Access should be increased via new public transport routes and active travel links that serve to connect the new communities with Garons Park. 3.17 Southend City Centre is under 3 miles away with direct access along the A13 and via Thorpe Bay train station. Further employment destinations around the airport, T emple Farm and the industrial estates in Shoeburyness are in close proximity. There are opportunities to improve access, including via improved bus and cycling, to these destinations as part of the new neighbourhood to benefit new and existing communities. 3.18 The scale of new development within the LNOS area will have the benefit of providing and supporting new community infrastructure such as schools, parks and sports areas, GP’s and local centre amenities. 3.19 New development will be infrastructure-led in order to create a high quality balanced and sustainable new neighbourhood. Developers must provide contributions for upgrades to the transport network, including strategic highway improvements, public transport and active travel. New community infrastructure must be provided (education and health facilities), and new publicly accessible green infrastructure, including a legally mandated 10% Biodiversity Net Gain (BNG) through the Environment Act. The Southend Infrastructure Delivery Plan provides details of infrastructure requitements and is summarised in Appendix 4. 3.20 The allocation will provide new sport pitch provision but would result in the loss of a 9-hole golf course at Garon Park. The existing 18-hole course to the west at Garon Park will be retained, along with the club house and parking area, and adjacent adventure golf facility. Development should contribute to enhancing the quality and access of the retained golf provision at Garon Park, including investment in course infrastructure and ancillary facilities. 3.21 Infrastructure upgrades will be provided on site by developers or funded using a combination of the Community Infrastructure Levy (CIL) and Section 106 agreements. An infrastructure schedule is set out in the Southend Infrastructure Delivery Plan. 3.22 The Southend Infrastructure Delivery Plan has identified that strategic scale green infrastructure is required to be delivered as part of the wider SEEPARK vision for South Essex, and the Council’s long held ambition for a country park in the north-east of the city to meet residents’ needs. Natural England’s Accessible Greenspace Standard for Districts is an accessible Greenspace of at least 100 hectares within 5km from home. The eastern end of Southend does not meet this standard as it lies outside a 5km radius of Hadleigh Country Park and Cherry Orchard Country Park. The Bournes Green New Neighbourhood provides an opportunity to help to meet this shortfall. Protected Green Space provision should seek to meet Natural England Accessible Green Space Standards, as well as requirements for Suitable Alternative Natural Greenspace (SANG) of 8 hectares per 1,000 population. This is required to deflect visitors away from designated coastal habitats sites. Where SANG cannot be delivered on-site in a way that meets the Natural England guidelines, enhancement of existing green spaces within the city 4 Natural England define Functionally Linked Land as “areas of land or sea occurring outside a designated site which are considered to be critical to, or necessary for, the ecological or behavioural functions in a relevant season of a qualifying feature for which a Special Area of Conservation (SAC), Special Protection Area (SPA) or Ramsar site has been designated.” Balancing Nature and Development: The Humber Estuary Protected Site Strategy Pilot – Natural England may be appropriate providing it is secured via a legal agreement. 3.23 There is also a requirement to consider the importance of functionally linked habitats 4 in order to ensure the integrity of designated habitats. At least two seasons of wintering bird surveys will be required for proposals within the strategic allocation to establish if it is important for sustaining the non-breeding populations of any of the Essex Coast Habitat Sites (such as by determining whether the land regularly supports more than 1% of the SPA/Ramsar population of specific qualifying species of non- breeding birds.) If it is determined to be important functionally linked land, appropriate mitigation measures will be required to ensure no adverse effects on the integrity of the population of the Habitats Sites, such as the enhancement of alternative areas of land to offsite any loss, secured through a legal agreement. Delivery and Stewardship 3.24 A Concept Framework will be prepared for the new neighbourhood ensuring that a comprehensive and cohesive approach is taken to the planning, design and implementation of development. The endorsed Concept Framework will be taken into account as an important material consideration in the determination of any planning applications. The Concept Framework will provide a high-level, evidence study that serves as a strategic guide for the development. It should have regard to potential development within Rochford and contain several core functions, including: ● Present an understanding of national and local policy as it relates to the site; ● Provide a high-level vision for development that has more detailed objectives to ensure high-quality and sustainable places; ● Define the spatial principles of the site and the development parameters for the wider area to ensure cohesive development; ● Provides guidance on density, key nodes, green infrastructure, and social infrastructure based on analysis. ● Consider delivery and governance. 3.25 The delivery of the new neighbourhood will be brought forward incrementally over a number of phases over the plan period. Each phase or urban village will be comprehensively designed in accordance with the wider Concept Framework. The Council requires Design Codes to be produced which accord with the principles established by the Concept Framework. The Design Codes must be approved by the Council and inform detailed proposals for individual sites or urban village. The production of design codes and detailed design proposals must be reviewed and informed by a Quality Review Panel. 3.26 In delivering the neighbourhood there are several criteria that need to considered: ● Delivery of community infrastructure, Protected Green Space and transport enhancements in initial or early stages. ● A mix of house sizes and tenures, including a high proportion of family housing, are delivered in each phase of development. ● Each phase of development contributes to the coordinated delivery of the neighbourhood and relevant concept framework and design codes. 3.27 To promote efficient and effective joint working and to front-load the planning process, the use of Planning Performance Agreements (PPAs) will be strongly encouraged. This will promote joint working between all parties, including statutory consultees, and will assist in identifying the issues that will need to be addressed prior to the submission of planning applications. 3.28 Management and stewardship arrangements will be determined as part of future planning permissions for the site. This will be achieved through collaboration between the developers, the Council, and other relevant stakeholders, and will be secured through planning conditions and/ or planning obligations attached to planning permissions. 3.29 The Council will require evidence that robust arrangements are in place for the long-term stewardship of the country park. Management and maintenance arrangements should be secured for the lifetime of the development through an agreed management plan and appropriate legal agreements. The Council’s preference is for transfer of land to local authority ownership, followed by transfer to the Land Trust or Local Wildlife Trust or similar body. If the Country Park is to be managed by a third party, step-in rights would need to be agreed through a planning obligation to ensure that the Country Park would be managed in perpetuity should the management company cease trading. Consideration should also be given to how biodiversity net gain can be maximised through the design and management of the park. Strategic Policy SP2b: Bournes Green New Neighbourhood - Guiding Principles for Land North of Southend 1. Land North of Southend will deliver sustainable and resilient, high-quality integrated urban villages forming a new neighbourhood. These will provide for a minimum of 4,900 new homes, 12,500 sqm employment floorspace, new accessible greenspace and associated infrastructure and services within the Southend administrative area. 2. The design and development must have regard to a Concept Framework endorsed by the Council. Design principles specific to each new urban village will be established through a design code which must be informed by Quality Review Panel. Planning applications within each urban village must be in accordance with the relevant established design code which has been endorsed by the Council, and high standards of design and placemaking will be expected, to reinforce local character. 3. Development Proposals must accord with the following principles: i. The new neighbourhood will constitute new urban villages and be designed sensitively to take full account of topography and landform and to successfully integrate with the existing urban areas of Southend; ii. Provision of a country park and a series of green and blue landscape corridors along existing brooks/ ditches to provide flood risk management, enhanced biodiversity and habitat creation, and active travel connections through the urban villages and connecting to the wider area; iii. Delivery will be phased and underpinned by a comprehensive package of infrastructure, including healthcare and schools, which addresses the impacts of the new neighbourhood, having regard to the Infrastructure Delivery Plan; iv. On-site and off-site infrastructure must be provided in a timely manner, ahead of or in tandem with the development to mitigate impacts, meet the needs of residents and establish sustainable travel patterns; v. Provide sustainable, integrated and well-planned development that incorporates a broad range of uses, infrastructure, Protected Green Space and services and significant parkland, providing connections to existing parks and recreational spaces including Garon Park; vi. Provide highway solutions to address the impact on the local and wider strategic road network, including junction and capacity improvements and provide new public transport, and active travel corridors to provide bus permeability and connect the new neighbourhood with key destinations including Southend city centre, open spaces, employment areas, education, train stations and health facilities; vii. Have due regard to London Southend Airport (Policy SP11); viii. Create sociable, vibrant, healthy and walkable urban villages. Incorporate a network of safe and usable paths and streets for pedestrians, cyclists and vehicles; ix. Provide for balanced and inclusive communities through a range of high-quality new homes of mixed size, tenure and type which seeks to address evidenced local needs. Provision should be made for a high proportion of family homes; x. Provide local centres located along public transport corridors which include appropriate community, retail and town centre uses to support the local population. Local centres should incorporate employment floorspace targeted at small and medium enterprises providing access for all to local employment opportunities. Bournes Green New Neighbourhood Allocation – development management policy
Health, schools & communityNature & environmentTransport & travel📍 Airport Business Park📍 Bournes Green📍 Garon Park📍 Hadleigh📍 Rochford📍 Shoeburyness📍 Southend📍 Thorpe Bay
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.