← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / SP8

Policy SP8

Enhancing our natural environment

On pages 164 to 169 of the official PDF.

The human version

This policy sets out how Southend's green and blue infrastructure will be protected and strengthened for flood management, biodiversity, recreation and health. Protected Green Space on the policies map will be protected, and new public open space will come through development. Priorities include protecting key nature sites and the River Thames foreshore, more urban greening along Southend High Street, and a target of 15% tree canopy cover by 2030. Qualifying developments must secure at least a 10% net gain in biodiversity. Other aims include sustainable drainage, tackling heat stress, local food growing, new strategic green space within allocation BG001 and on land west of Star Lane, and RAMS contributions.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 164

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Strategic Policy SP8 – Enhancing our natural environment Where we are now 8.1 The key issues to be addressed to ensure Southend’s spatial vision is realised are: ● 9 Green Flag Parks, 4 Blue Flag beaches; ● Nationally important seagrass meadows on the foreshore which are vulnerable to impact from tourism; ● 90% of residents visit a park or Protected Green Space once a week or more, and 80% of residents are satisfied with Southend’s parks and open spaces92; ● Larger parks all have Green Flag awards, but quality and recreation value of parks and open spaces vary, with some parks and play spaces in need of improvement and renewal; ● The Council is embarking on a programme of play equipment improvements; ● Access to Protected Green Space varies across the city and there are opportunities to improve quantity, quality and access as part of new development to expand and improve the city’s ‘green grid’ as shown indicated on the Key Diagram; ● There are quantitative deficiencies within the City Centre and 92 Source: Residents’ Perception Survey 2021 https://yoursay.southend.gov.uk/southend-residents-perception-survey-2021 surrounding neighbourhoods, and access can be reduced by major roads or railway lines forming barriers to movement; ● Tree canopy cover varies widely across the city, and urban heat stress is becoming an increasing problem affecting residents’ health and wellbeing; ● Southend experiences surface water flooding events which are worsened by the extent of impermeable surfaces; ● There are sites of international and national importance for nature along the foreshore, including Two Tree Island and Gunners Park, and at Belfairs Woods and Golf Course, while other areas in the City Centre have more limited access to nature; ● Approximately 14% of the land area within Southend is designated as Green Belt comprising of over 580 hectares; ● Green Infrastructure (GI) is a network of multi-functional green and blue spaces and other natural features, urban and rural, which is capable of delivering a wide range of environmental, economic, health and wellbeing benefits for nature, climate, local and wider communities and prosperity. (National Planning Policy Framework, 2024). Where we want to be Strategic Objective 17 Strategic Objective 18 Key Supporting Documents Key supporting documents that underpin the policies are available on the Council’s Evidence Documents | Southend Local Plan , particular under the heading ‘Enhancing the natural environment’. How we are going to get there Strategic Policy SP8: Enhancing our Natural Environment 1. Southend’s green and blue infrastructure will provide ecosystem services such as flood management, biodiversity, climate change mitigation and adaptation, as well as providing recreational opportunities, employment and skills benefits and wider public health benefits such as promotion of active travel, local food growing and access to nature: i. Protected Green Space identified on the policies map will be protected to support these objectives. ii. New public open space will be provided through new development in accordance with Policy DM9.1 2. The green and blue infrastructure network in Southend will be protected and strengthened, contributing to the development of the Nature Recovery Network for Essex, and providing multiple co-benefits for people and the environment. 3. The key priorities for Southend’s green and blue infrastructure are to: i. provide sufficient quantity and quality of Protected Green Space as part of the green grid network to meet the needs of residents, including opportunities for sport and physical activity; ii. protect and enhance local, national and internationally important sites for nature conservation; iii. Increase urban greening along Southend High Street and adjacent residential areas, to provide biodiversity, surface water management, shading and areas for seating; iv. protect and enhance the River Thames foreshore for nature conservation, climate change resilience, tourism, leisure and transport; (ref. DM8.4) v. protect the existing tree canopy, and increase tree cover across the city where opportunities arise with a target of 15% canopy cover by 2030; vi. increase access to Protected Green Space including pocket parks and natural ‘play on the way’ elements within public realm; vii. secure at least a 10% net gain in biodiversity in qualifying developments. Development on greenfield site allocations should aim to provide more than 10%; viii. incorporate sustainable drainage systems (SuDS) and natural drainage measures into development and manage flood risk; ix. incorporate measures to mitigate and adapt to heat stress, particularly in the City Centre and adjacent neighbourhoods; x. increase opportunities for active travel as part of the green infrastructure network to help improve accessibility and social cohesion; xi. increase opportunities for local food growing and community gardens; xii. support opportunities to provide new publicly accessible strategic scale Protected Green Space on the northern edge of Southend within allocation BG001 and on land west of Star Lane; xiii. support opportunities to provide natural burial space where this would not have an adverse impact on the recreational function of existing public open space; xiv. secure contributions from qualifying development towards mitigation measures in the Essex Coast Recreational disturbance, Avoidance and Mitigation Strategy (RAMS). Why we have taken this approach 8.2 Policy SP8 sets out the Council’s strategic priorities for protecting and enhancing the green infrastructure network around Southend. Essex Local Nature Recovery Strategy (June 2025) sets out the priorities for biodiversity enhancement for the city. The policy seeks to protect green and blue spaces and create multi-functional green infrastructure with spaces for nature, recreation and social interaction. Better connections between Southend’s different parks and open spaces will be created to promote active travel through walking and cycling, linked to the priorities in the Local Walking and Cycling Strategy. Where there are gaps in access to green space, these are described in the relevant neighbourhood section and opportunity areas identified. Each neighbourhood has access to at least one park or open space of at least 6 hectares which provides a variety of facilities. 8.3 Blue spaces also form part of the Green Infrastructure network in Southend, which includes waterbodies, ponds, estuaries, the coast and the sea. The seven miles of foreshore provide an important recreational resource for residents and visitors. The King Charles III England Coast Path long distance trail route extends the length of the Southend foreshore and provides access to the coast as a natural resource, as well as a national Sustrans cycle route. 8.4 Policy DM8.2 designates land within Southend as Protected Green Space as identified on the Policies Map. This designation comprises a range of different land uses and types of green space, including (list not exhaustive): 93 Accessible Greenspace Standard 94 Cherry Orchard Jubilee Country Park in Rochford is 96ha but has been included for the purposes of assessing compliance with the Natural England benchmark for District Accessible Green Space (assessment on basis of direct ‘crow flies’ measurement) ● Neighbourhood Parks – parks of at least 6 hectares in size containing facilities such as cafes, fishing lakes, play space and sports courts and toilets, serving a neighbourhood and city-wide need; ● Local Parks and amenity space – smaller parks and areas of informal green space less than 6 hectares, serving a local need, often with fewer or no facilities; ● Playgrounds and Multi Use Games areas – providing recreation opportunities for children and young people; ● Green Corridors – active travel routes with extensive green landscaping that also act as an ecological network e.g. Prittle Brook, Victory Path; ● Natural and semi-natural green space – areas with nature conservation value. 8.5 A quarter of households do not meet the Natural Enqland “District standard”93 of an accessible greenspace at least 100 ha 94 within 5 km from home (mostly in the Thorpe Bay and Shoeburyness areas). Southend does not have any large “district accessible green space” 100 hectares or greater or “sub-regional greenspace” 500 hectares or greater. Country Parks at Hadleigh in Castle Point Borough Council and Cherry Orchard Jubilee in Rochford District Council provide this function for Southend residents. However, the north and eastern parts of Southend are further than 5km from these country parks. 8.6 Provision of strategic open space, serving the function of a country park to the north of Southend has been a long-held ambition, set out in the Core Strategy (2007). This could potentially extend into Rochford, as proposed by SEEPark concept jointly developed by the South Essex local authorities 95. This would better connect the urban area of Southend with the rural fringes of the Roach Estuary by linking up existing rights of way and providing greater public access to green space, forming part of the wider sub-regional SEEPark. This may also provide an opportunity for additional burial space as part of the wider green infrastructure network (see Policy DM4.1). 8.7 Southend contains several roads with a wide grassed central reservation within the highway, including Highlands Boulevard, Southchurch Boulevard and Thorpe Hall Avenue. These often include large, mature trees, provide an amenity resource for residents, making a significant contribution to the city’s tree canopy, and perform a valuable role in carbon reduction. The multi- functional role of these roads as highway and ecological resource will continue to be promoted and their strategic importance as part of the city’s green grid recognised. 8.8 Elm Road (reference HEA137) and George Street (reference HEA135) in Shoeburyness have been identified through a site assessment process as having potential for residential and community uses, as Council land holdings, to meet policy objectives for housing and regeneration. More detail is provided in the relevant neighbourhood section. Open space and/or biodiversity enhancement will form part of the overall scheme for these site allocations. Overall, there is a net gain of 19 hectares of land designated as Protected Green Space on the policies map, compared with the current adopted Local Plan. 95 South Essex Green and Blue Infrastructure Study https://localplan.southend.gov.uk/evidence-documents 96 Essex Coast RAMS – Southend-on-Sea City Council 8.9 The Essex Coast Recreation Avoidance and disturbance Strategy (RAMS)96 identifies that large-scale residential developments of 500 dwellings or more, may need to provide Suitable Alternative Natural Green Space (SANG). These provide additional scope to mitigate the alone impacts of particular development and deflect visitors away from the designated habitats along the coast, for example by providing locations that welcome dog walking. SANG should be provided on-site in the first instance, in accordance with Natural England guidelines or successor document. Where the on-site requirement cannot be met in full or part, contributions towards off- site enhancements will be required to make up any shortfall. SANG enhancement sites and mitigation package will be identified within a Southend SANG Strategy. Suitable sites for off-site enhancement will be located within a visitor catchment which reflects their size, in accordance with Natural England guidelines. Green Infrastructure Network – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 16 Strategic Objective 17 Strategic Policy SP8 Why we need this Policy 8.10 Green and blue infrastructure such as parks, open spaces, and waterways including the estuary have wider benefits for people and the environment (or ‘ecosystem services’) which can improve health and wellbeing, support sustainable patterns of development, and provide climate change mitigation and adaptation. Provision of accessible green infrastructure including amenity and play space, ‘play on the way’ spaces that provide informal opportunities for play on green routes, local growing sites and safe routes for walking and cycling can encourage regular physical activity, improve community cohesion and mental health and wellbeing. 8.11 The city’s Green Infrastructure network also plays a vital role in climate change mitigation and adaptation. Open space, trees, soft landscaping such as green walls and roofs, and water features can reduce the urban heat island effect making the built environment more comfortable during the summer months. It also provides shade, reduces air pollution and allows surface water and carbon to be stored increasing biodiversity and contributing to making places more attractive for visitors and investors. 97 Southend and Rochford Settlement Role and Hierarchy Study 2020 Southend Central Area Profile How the Policy Works 8.12 Policy DM8.1 requires development proposals to protect existing green infrastructure, including public open space and address quantitative and qualitative deficiencies where development opportunities arise. The key areas of focus for new and enhanced green infrastructure are the City Centre and adjacent neighbourhoods, which lack sufficient Protected Green Space within walking distance of homes97, and the opportunity for a new country park. This would be a landscape-scale Protected Green Space created to serve new and existing residents. 8.13 Major development proposals should include a Green Infrastructure plan (which may be part of a Design and Access Statement) setting out how the development will deliver the GI policies, proposals and development requirements in development plan policies and local design codes. GI delivered in major developments should be managed, maintained, and monitored for a minimum of 30 years. Green Infrastructure elements of proposals should be multi-functional, for example providing public open space while meeting requirements for sustainable urban drainage and urban greening factor, providing co- benefits for people and for nature. 8.14 The Council will continue to invest in quality improvements to the main public parks and open spaces and seek to provide additional green infrastructure where resources are available, including through external funding and partnership with other public and private bodies. Priorities for GI investment will be set out in the Infrastructure Delivery Plan. 8.15 Developments will be required to meet the statutory 10% biodiversity net gain (see Policy DM8.4) unless they fall within an exemption as set out in regulations.
Health, schools & communityNature & environmentTransport & travel📍 Belfairs📍 Rochford📍 Shoeburyness📍 Southchurch📍 Southend📍 Southend-on-Sea📍 Thorpe Bay📍 Two Tree Island
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.