← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend plan / SP9

Policy SP9

Climate Change and Environmental Protection

On pages 191 to 195 of the official PDF.

The human version

This policy says new buildings and spaces must make Southend more resilient to climate change. To cut carbon, development must follow a hierarchy: be lean by using less energy, be clean by supplying energy efficiently, be green by producing and storing renewable energy on site, and be seen by reporting on energy performance. It should support walkable neighbourhoods and reuse materials. To adapt, the Council will manage flood risk across the whole catchment, keep sea defences adequate and safeguard land to raise them. It will also save water and tackle heat stress. Minerals such as brickearth and agricultural land will be safeguarded, and pollution harmful to health avoided.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 191

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Strategic Policy SP9: Climate Change and Environmental Protection 1. The design of new buildings and spaces must ensure Southend is more resilient to the impacts of climate change, by mitigating and reducing carbon emissions from land use and building construction and adapting the environment where necessary to mitigate climate change impacts. Climate Change Mitigation 2. In order to reduce carbon emissions, new development must: i. Mitigate climate change in accordance with the following hierarchy: a. be lean: use less energy and manage demand during operation; b. be clean: exploit local energy resources (such as secondary heat) and supply energy efficiently and cleanly; c. be green: maximise opportunities for renewable energy by producing, storing and using renewable energy on-site; d. be seen: monitor, verify and report on energy performance; ii. Support the principle of walkable neighbourhoods, enabling residents to access the full range of day-to-day facilities on foot, by bicycle or public transport; iii. Promote a circular economy* through retention and/or re-use of materials; iv. Improve walking and cycling connections to improve opportunities for active travel and reduce demand to travel by private car. Climate Change Adaptation 3. The impacts of climate change on Southend will be addressed by: i. Managing flood risk, taking a whole catchment approach and including flood resistant and flood resilient measures (Policy DM9.4 flood risk policy and sustainable drainage); ii. Ensuring sea defences are adequate to manage flood risk for the plan period and beyond, and safeguarding land for future replacement and/or raising of flood defences to ensure climate change adaptation is feasible; iii. Managing development within and adjacent to the South East Marine Plan area having reference to marine plan policies for flood defence, carbon sequestration and climate change resilience (see also Policy DM8.3 Southend Foreshore) iv. Careful management of water resources including water efficiency measures and nature-based sustainable drainage solutions; v. Opportunities to better adapt to heat stress by protecting and strengthening the green and blue infrastructure network. Environmental Protection 4. The city’s natural resources and resident’s health will be protected by: i. Safeguarding the existing minerals resources including brickearth and agricultural land; ii. Avoiding harmful impacts on human health and the environment through water, air or soil pollution and land instability. *where products and materials are kept in circulation, for example through processes such as maintenance, reuse, refurbishment, remanufacture, recycling and composting Why we have taken this approach 9.3 Planning must ensure that the development and use of land contributes to the mitigation and adaptation to climate change. Climate resilient development can significantly increase the adaptive capacity of places, providing multiple co-benefits for health and wellbeing and ecosystem services, such as reducing obesity, asthma and premature deaths due to pollution, protection of wildlife and enhancement of existing blue and green infrastructure assets. It also has benefits for the economy and social inclusion, such as security of energy supply through increased energy diversity, reduced fuel cost and employment possibilities. 9.4 Southend-on-Sea City Corporate Plan 2024-2028 highlights some of the environmental challenges Southend faces in the future, including an ageing built environment; environmental instability; the poor quality of our air; and risks of natural flooding and coastal erosion. The Plan’s outcomes include to “build a resilient city to tackle effects of climate change.” The Council will work with partners to improve water quality and make Southend a national exemplar for flood and coastal erosion risk management. 9.5 Southend needs to be able to adapt to a changing climate in the following ways: ● Our infrastructure will need to be maintained and renewed, and built to higher specifications where appropriate such as raising sea defences; ● Taking into account climate change projections for sea level rises and increased rainfall, we will need to review our flood zone mapping to ensure new development, particularly housing and other vulnerable uses (e.g. healthcare) that have to be located in areas of flood risk is resilient for the long term ● Increasing green and blue infrastructure coverage in areas of heat stress to reduce day and night ambient temperatures and health impacts on vulnerable groups; ● Supporting nature, creating resilient local habitats for our native species and supporting woodland creation and management for carbon sequestration; ● Creating new energy efficient and adaptable buildings for the 21st century by minimising carbon emissions and addressing the retrofitting challenge; ● Decarbonising the transport network and providing more opportunities for active travel; ● Reducing carbon emissions from waste and energy networks. Sustainable Design and Construction – development management policy Reference to Strategic Objective and Strategic Policies Strategic Objective 15 Strategic Policy SP9 Why we need this Policy Water efficiency 9.6 Essex is already classified as a seriously water-stressed area 122, and existing water resources need to be managed carefully. Essex is one of the driest places in the country, and by 2050, Essex may have a water shortage of almost 150 million litres every day, with climate change and population growth exacerbating water shortages, and impacts on the environment. 9.7 Looking ahead, our winters will continue to be a lot wetter and summers a lot drier. The Water Strategy for Essex123 identifies three main ways to address the projected shortfall in water supply: reducing demand for water, changing land use for water, and developing new sources of water supply. Southend does not have the land resource to influence additional water supply, but through the Local Plan developments can make more space for water through nature-based solutions to sustainable drainage (Policy DM9.4) and urban greening measures (Policy DM8.3), and new developments can include water efficiency measures to reduce demand for mains water and increase domestic waste water recycling. 122 www.gov.uk/government/publications/water-stressed-areas-2021-classification 123 www.essex.gov.uk/news/2024/new-water-strategy-essex 124 https://assets.publishing.service.gov.uk/media/5a80092540f0b623026911f3/BR_PDF_AD_G_2015_with_2016_amendments.pdf 125 Water Efficiency Standards: a review of Building Regulations 2010 Part G2 - GOV.UK 126 shared-standards-in-water-efficiency-for-local-plans.pdf 9.8 The average number of litres used daily per person in Essex households is 152.3 litres. Part G of the Building Regulations 124 allows for local authorities to adopt an optional higher water efficiency standard per household of 110 litres per day in new dwellings, within in areas of high water stress. Southend adopted the optional higher standard of water efficiency in the Development Management DPD (2015), and this is being implemented in new developments. Policy DM9.1 requires residential development to incorporate water efficiency measures that limit internal water consumption per household to 110 litres per day (including external water consumption), maintaining the existing policy requirement. The government consulted on revising the Water Efficiency Standards in the Building Regulations 2020 in September 2025. 125 Shared Standards for Water Efficiency in Local Plans 126 was published in June 2025 for the East of England Region by Anglian Water, Natural England, Environment Agency, Water Resources East, Affinity Water and Cambridge Water. It recommends a shared water efficiency standard of up to 85 litres/person/day (l/p/d for residential developments and BREEAM full credits for non-residential developments. Energy Efficiency 9.9 The Planning and Energy Act 2008 specifically allows the setting of energy efficiency standards that exceed the energy requirements of Building Regulations. Requirements should be ‘reasonable’. 9.10 Approximately 90% of existing housing in Southend (and at least 30% of Council stock) is below Energy Performance Rating (EPC) C. To meet the government’s net zero target by 2050, these properties will need some form of retrofitting to increase their energy efficiency and reduce carbon emissions from this sector. This means that new build homes should be as energy efficient as possible, avoiding expensive retrofitting once properties are built, and providing savings on heating bills for future residents. 9.11 The Future Homes and Buildings Standard (FHS) or Part L of the Building Regulations will come into force in March 2027 and will require new homes to produce 75-80% less carbon emissions than homes built under the current Building Regulations. Renewable Energy 9.12 the Future Homes and Buildings Standard (FHS) is based on a notional property that would incorporate renewable energy generation, including a heat pump rather than a gas boiler. Photovoltaic (solar) panels would be required on low and mid-rise homes to meet the standard, but not on blocks of flats of over 15 storeys 127. 9.13 The Essex wide evidence indicates that it is technically feasible for a building to generate sufficient renewable energy to match or exceed its predicted annual total energy use, and in most cases across Essex financially viable for most larger brownfield sites. Circular Economy and embodied carbon 9.14 The carbon emissions used to extract and transport raw materials, and the manufacturing of those materials are also known as 127 https://assets.publishing.service.gov.uk/media/657733b8095987001295de11/The_notional_buildings_for_dwellings_2025_consultation_only.pdf 128 www.ellenmacarthurfoundation.org/topics/circular-economy-introduction/overview 129 https://ukgbc.org/our-work/topics/advancing-net-zero/embodied-carbon/ 130 www.essexdesignguide.co.uk/climate-change/essex-embodied-carbon-policy-study/ embodied carbon. In a circular economy 128, products and materials are kept in circulation through processes like maintenance, reuse, refurbishment, remanufacturing, recycling and composting. A circular economy could reduce global carbon dioxide emissions from building materials by 38% in 2050, by reducing demand for steel, aluminium, cement, and plastic. Current Building Regulations do not address embodied carbon. The UK Green Building Council 129 is advocating the regulation of embodied carbon in the construction process to help the industry progress toward net zero carbon goals. 9.15 The Essex Embodied Carbon Policy Study 130 provides the technical evidence to support reducing embodied carbon emissions from new development in Essex. How the Policy Works Energy Efficiency 9.16 Information should be submitted prior to occupation to demonstrate to the satisfaction of the LPA that the building or development has been built to the approved design and energy standards. Further guidance will be set out in supplementary guidance or design code. Embodied Carbon 9.17 A statement should be submitted with the planning application setting out how the application meets the policy requirements. The requirements may be secured by pre-commencement or pre- occupation conditions. Conditions may also require monitoring reports to be submitted for occupation and/or post occupation stage.
Climate & energyFlooding & waterHomes & housing📍 Southend📍 Southend-on-Sea
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.