← Open Consultation: all consultations

Southend Plan Explorer

Search the Southend Local Plan. 408 pages, made findable.

The consultation closes at 5pm, Monday 21 December 2026.

OpenConsult / Southend Plan Explorer

Homes & housing

How many new homes are planned, where they go, affordable housing requirements, housing mix, density and homes for older people.

295 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy, Strategic Policy SP4, requires new buildings and spaces to support healthy lifestyles, physical activity and safe, inclusive places. Development should not harm the city's ability to improve education, health and wellbeing. The Council will support schemes that improve the primary care network with the NHS. A Health Impact Assessment is needed for developments of 50 or more dwellings or 5000sqm or more of non-residential floorspace. It is also needed where an Environmental Impact Assessment is required, or for a large HMO of 7 or more unrelated people. A full assessment may follow if significant issues are found. Policy Table SP4.1 lists other policies that affect health.

The human version (we wrote this, not the council)This section introduces the chapter on homes. Housing in Southend has become less affordable and land for new homes is limited. The national standard method gives a need of 1,405 homes per year, more than 4 times past delivery rates. Between 2001-2025 about 7,900 new homes were built, around 330 per year. Of these, 96% were on previously developed land and around 75% were flats. Only 14% had 3 beds and 8% had 4 or more beds. The section highlights the need for family homes, homes for older people and affordable housing. It notes that HMOs are common and that no need for gypsy or traveller pitches has been found.

Policy SP5

Homes

pp. 57–67

The human version (we wrote this, not the council)This policy, Strategic Policy SP5, plans for 14,700 net dwellings to 2045. These are split between Southend Central Neighbourhood (3,600), Land North of Southend (4,900), Fossetts Farm (1,350), other neighbourhoods (1,850) and windfall (3,000). Delivery is stepped: 365 dwellings a year in 2025-2030, 655 in 2030-2035 and 960 in 2035-2045. Homes will come from existing permissions, site allocations, opportunity sites and windfall. Affordable housing is required on all sites of 10 or more dwellings, and the loss of homes will be resisted. No need for gypsy or traveller pitches is identified, but criteria are set for any future application.

The human version (we wrote this, not the council)This policy, Policy DM5.1, sets how much affordable housing new schemes must provide. Schemes of 10 dwellings or more must provide at least 30% affordable or key worker homes. The rate is 10% for brownfield flatted development in Value Area 1, which covers Westcliff, Prittlewell, Southend Central, Southchurch, Fossetts and part of Shoeburyness. Build to Rent schemes must provide at least 20%. Provision should normally be on-site. The Council will seek 80% as affordable housing for rent, with the rest as affordable home ownership. As a guide, this means 40% social rent, 40% affordable rent and 20% other ownership products.

The human version (we wrote this, not the council)This policy, Policy DM5.2, promotes a wide choice of homes to create mixed, balanced and inclusive communities, including family housing. Proposals for 10 or more dwellings must provide a mix of home sizes and types. This should have regard to the latest Housing Needs Assessment, as set out in Policy Table DM5.2. Where a proposal moves well away from this mix, the reasons must be justified. High density flatted schemes in highly accessible places may include more smaller units, but should still include some family sized homes. More suburban areas should provide a larger share of family housing than the preferred mix.

The human version (we wrote this, not the council)This policy, Policy DM5.3, resists any net loss of existing homes (Use Class C3) in Southend. Applications that lose homes will be refused unless an exception applies. Exceptions include a change to a needed local community facility, or homes that cannot reach the standards in Policy DM5.5. Others are a net gain in affordable housing, enlarging sub-standard units to meet space standards, or the only practical way to preserve a listed building or other heritage asset. The previous use of a building can also be taken into account. Turning small flats back into family sized homes is supported in principle, even with a net loss of units.

The human version (we wrote this, not the council)This policy, Policy DM5.4, controls the conversion of houses into smaller self-contained flats. Conversions are only allowed if the floor area is at least 124sqm or the home has four or more bedrooms. At least one new unit must be suitable for a family, with a minimum of three bedrooms. Schemes must meet Policy DM5.5 and must not harm living conditions, the look of the building or area, or a street's function. Parking standards in Policy DM10.3 must be met. The family unit is not needed where a different mix is essential for a listed building, for existing occupants who will remain, or for people with special housing needs.

The human version (we wrote this, not the council)This policy, Policy DM5.5, sets minimum standards for new homes, including extensions. All units should meet or exceed the nationally described space standards in Policy Table DM5.5. For proposals of 10 or more dwellings, at least 20% must meet Building Regulation M4(2) for accessible and adaptable homes. A further 10% must be suitable for wheelchair users under M4(3). Every home should have usable private outdoor space, such as a garden or balcony, plus vehicle and cycle parking. The technical rules include a single bedroom of at least 7.5sqm, a double bedroom of at least 11.5sqm, and a ceiling height of at least 2.3m over 75% of the floor area.

The human version (we wrote this, not the council)This policy, Policy DM5.6, manages Houses in Multiple Occupation (HMOs) and other shared housing. Turning large sui generis HMOs back into family homes is allowed. New HMOs are only permitted if they would not make up over 10% of homes within a 50 metre radius. They must not sandwich a normal home between two HMOs or create a run of three or more HMOs. They must not cause harm through noise, on street parking, building alterations or poor bin and cycle storage. They must meet the Essex HMO Amenity Standards. The Council will investigate Article 4 Directions to control conversions of homes into small HMOs for three to six people.

The human version (we wrote this, not the council)This policy, Policy DM5.7, aims to provide enough housing for older people to live independently for as long as possible. New schemes must meet an identified need, be targeted at local residents and show there is no existing capacity in Southend. They must not create an over concentration of similar uses. They need good access to transport and services, suitable care, space for carers and visitors, and communal areas, including space to grow food. A 6-month marketing exercise should target people with a local connection. Loss of older people's housing is only allowed if it is surplus, outdated, residents can move elsewhere in the city, or better provision replaces it.

The human version (we wrote this, not the council)This policy, Policy DM5.8, supports a suitable range of housing for people with specialist and vulnerable needs. It covers supported housing not dealt with by Policy DM5.7. Permission will be granted where the scheme meets a demonstrable need in the city and is targeted at local residents, through a 6-month marketing exercise. It must be well designed, safe, accessible and suitable for the people who will live there, with facilities for carers and visitors. It must meet the standards in Policy DM5.5 or Care Quality Commission standards. Loss of such housing is only allowed if it is surplus, cannot meet modern standards, or will be replaced by better provision.

Policy DM5.9

Co-Living

p. 92

The human version (we wrote this, not the council)This policy, Policy DM5.9, sets criteria for co-living schemes, which are large purpose-built shared living blocks. They must be in well connected places with frequent public transport, with Southend Central Area as the main focus. Schemes must be under single management, with all units for rent on tenancies of at least three months. They must provide a communal kitchen, indoor and outdoor communal space, storage, a concierge, laundry and room cleaning. Each unit must have 18-27sqm of living space per person and a window. A management plan is required, plus an affordable housing contribution equivalent to at least 30% of the total number of units.

The human version (we wrote this, not the council)This policy, Policy DM6.6, covers tourism and visitor accommodation. The Central Seafront is the main focus for new tourist attractions, with the City Centre and wider Seafront, including Leigh-on-Sea and Shoeburyness, also supported. Major tourism schemes must improve sustainable travel for visitors. The foreshore, parks and gardens will be protected. New visitor accommodation should be in the Key Areas: Southend Central Neighbourhood, the District Centres of Leigh and Westcliff, and places closely linked to the Seafront and London Southend Airport. Visitor accommodation there is kept unless no longer viable. Changing homes to holiday lets used over 90 days a year is assessed for housing and amenity impacts.

The human version (we wrote this, not the council)This policy sets out how all development should achieve good design and a better public realm, reinforcing local character. Proposals must add to the quality of the area, including layout, height, scale, landscaping and materials, with active public fronting elevations. They must protect neighbours' privacy, outlook, daylight and sunlight, and limit noise. Layouts should be safe, accessible and inclusive, putting pedestrians and cyclists first, and use Secured by Design principles. Schemes should adapt to changing needs, follow circular economy principles and meet space standards. Around buildings, proposals should create safe routes for active travel and use high quality street furniture, public art, landscaping and trees, keeping spaces free from clutter.

The human version (we wrote this, not the council)This policy says development must make good use of land in a sustainable way that fits its setting, without over-intensification or too much burden on infrastructure such as transport. Higher densities through a design-led approach are encouraged, especially in the City Centre, key growth areas and the allocations in Chapter 12. Backland and infill schemes are judged site by site and allowed unless they harm living conditions, clash with local character, affect highway safety, leave unusable gardens or lose wildlife habitats or important trees. Redeveloping bungalows will be resisted in streets of mainly single storey homes. Extensions, including 'airspace' development, must use fitting materials and a respectful scale.

The human version (we wrote this, not the council)This policy says new buildings and spaces must make Southend more resilient to climate change. To cut carbon, development must follow a hierarchy: be lean by using less energy, be clean by supplying energy efficiently, be green by producing and storing renewable energy on site, and be seen by reporting on energy performance. It should support walkable neighbourhoods and reuse materials. To adapt, the Council will manage flood risk across the whole catchment, keep sea defences adequate and safeguard land to raise them. It will also save water and tackle heat stress. Minerals such as brickearth and agricultural land will be safeguarded, and pollution harmful to health avoided.

The human version (we wrote this, not the council)This site allocation sets out the development sites in Leigh, shown on the Policies Map and in Policy Table N2i. Proposed allocations are the Former Police Station on Elm Road for about 5 homes, keeping its locally listed façade; the Former Car Showroom at 831-837 London Road for 39 homes; 843 London Road for 9 homes; and vacant land behind 11-33 Juniper Road for 8 homes. Other sites already have planning permission, including the Sarah Moore pub at 57-59 Elm Road with 6 homes above, 658 London Road with 25 homes and 939-953 London Road with 30 homes. Most London Road sites have commercial ground floors.

The human version (we wrote this, not the council)This site allocation lists six sites in Prittlewell for development. Land between Prince Avenue and the A127, a former cattery, could give about 29 homes. St Stephen's Church, Manners Way, is for church and community use with about 7 homes. Land at Prittlewell Chase next to Brook Meadows House could give about 31 homes, possibly extra care or key worker housing. Roots Hall Stadium would become a modern community stadium, with about 250 homes as enabling development. Prince Close could give about 23 homes. Land to the South of Eastwoodbury Lane is for mixed use, housing led development of about 225 homes, with allotments and possible education provision.

The human version (we wrote this, not the council)This site allocation lists three sites in Westcliff for new homes. Land at Westcliff Station, next to Valkyrie Road, could provide about 15 homes with landscaping. Part of Hamlet Court Road Car Park could provide about 7 homes, as long as public parking needs are still met. A site at 30 to 32 The Leas already has planning permission and is allocated for about 9 homes. Development there should be well designed and conserve and enhance the character and setting of the Crowstone Conservation Area.

The human version (we wrote this, not the council)This section describes Southchurch and sets out its vision. Southchurch is a residential area east of the City Centre, centred on the Southchurch Road neighbourhood centre, with Southend East railway station to the south. Homes range from tightly knit Victorian and Edwardian terraces to lower density post war homes at Bournes Green. The average density is 30 homes per hectare, and parking stress is an issue in denser streets. The vision keeps the area's residential character, with more tree planting in denser streets. New homes may come through intensification along the Southchurch Road A13 corridor. New cycle routes and the conservation of Southchurch Hall are also planned.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Southchurch. New development must support health and wellbeing and be matched by the infrastructure it needs. Existing homes are safeguarded and new homes come from sites in Policy N6i, with growth focused along Southchurch Road and through renewal of housing areas. The policy seeks a balance on homes in multiple occupation and supports shops in the Southchurch Road Neighbourhood Centre. It aims to conserve heritage, protect green space and the foreshore, improve play space and plant more trees, including in Kursaal Ward. Coastal defences will be upgraded where needed. It also supports better transport and Southend East railway station.

The human version (we wrote this, not the council)This site allocation lists six sites in Shoeburyness. Land at George Street could provide about 8 homes with green space to the rear. Land at Elm Road could provide about 250 homes, but ground conditions must be made safe first. Terminal Close could provide about 150 homes in a mixed use scheme, with some small shops on Shoebury High Street, and is released from employment use. Three sites already have planning permission: land between Barge Pier Road and Ness Road for about 210 homes with a health centre, Land at Eagle Way for about 21 homes, and Thorpedene, Delaware Road, for about 19 homes.

The human version (we wrote this, not the council)This section is the plan's glossary. It explains the planning terms used throughout the document. For example, it defines affordable housing, including homes for rent at least 20% below local market rents and discounted homes sold at least 20% below market value. It explains Biodiversity Net Gain as a gain of at least 10% over existing habitats. It sets out what counts as major development, such as 10 or more homes or a site of 0.5 hectares or more. Other terms covered include the Agent of change principle, Article 4 Direction, Houses in Multiple Occupation, Protected Green Space, tall buildings, windfall sites and Urban Greening Factor.

The human version (we wrote this, not the council)This section explains where the plan's new homes will come from and lists every site proposal. There are four sources of supply: sites with planning permission, allocations, broad locations or opportunity sites, and windfall development. Delivery of broad locations is less certain, so only part of their capacity is assumed by 2045. Windfall sites are those not identified in the plan, such as conversions or flats over shops. The table then lists the site proposals for each neighbourhood with their approximate homes. The largest is Bournes Green New Neighbourhood, Land North of Southend, for a minimum of 4,900 homes, followed by Better Queensway with about 1,760 homes.

The human version (we wrote this, not the council)This section gives guidance on affordable housing, to be read with Policy DM5.1. The Council expects affordable homes to be built on site first. Off site provision is normally only accepted in exceptional circumstances, and payment in lieu only in limited circumstances, with money ring fenced in a separate pot. Where a scheme cannot meet the required level, viability testing applies. Review mechanisms then check whether more affordable housing can be provided later. An Early Stage Review is triggered if progress is not made within two years, and a Late Stage Review happens when 75% of units are sold or let. Some later changes also need viability information.

The human version (we wrote this, not the council)This section sets out the parking standards for new development. For homes, there are minimum car parking standards that differ between Southend Central and the rest of the city. A flat needs 0.5 spaces in Southend Central and 0.75 spaces elsewhere, and a house needs 1 space. Houses with 4 or more bedrooms need 1.5 spaces outside Southend Central. Lower provision would need to be justified. For other uses, such as shops, offices, hotels and schools, the tables set maximum car parking standards. A further table sets minimum cycle parking standards, including 1 secure covered space per dwelling unless there is a garage or secure area.

The human version (we wrote this, not the council)This section sets out the framework for delivering and monitoring the Local Plan. For each strategic policy it lists aims, who will deliver them, how, and the key indicators and data used to track progress. Targets include 14,700 additional homes by 2045, with 4,900 at Bournes Green New Neighbourhood, including 45% affordable homes. Others include 68,400sqm of employment floorspace by 2045, and 20% affordable housing on sites of 10 to 49 dwellings and 30% on sites of 50 or more. It also sets a city-wide target of 15% tree canopy cover and at least 10% biodiversity net gain. Further indicators cover health, heritage, flooding, transport and the airport.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 5pm, Monday 21 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.