← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / 11. Natural environment

From the plan

11. Natural environment

On pages 61 to 62 of the official PDF.

The human version

This section introduces the natural environment chapter. It says the district's landscapes, woodlands, hedgerows, watercourses and habitats support wildlife, recreation, flood management and climate resilience. Parts of the district lie in the Surrey Hills and High Weald National Landscapes. The Plan aims to protect these assets and to restore and connect them, supported by the Surrey Local Nature Recovery Strategy. It explains the need to keep wildlife corridors and apply the mitigation hierarchy. Development within the 7km Zone of Influence of the Ashdown Forest SPA and SAC must help pay for mitigation. The Council will not require Biodiversity Net Gain above the national minimum.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 61

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

11. Natural environment 11.1 The Tandridge District’s natural environment is fundamental to its character, identity and quality of life. Its landscapes, woodlands, hedgerows, watercourses, wetlands, habitats and open spaces provide important ecological, recreational and environmental functions. They support biodiversity and nature recovery, contribute to climate resilience and flood management, provide opportunities for recreation and active travel and help define the character and setting of settlements. 11.2 The District contains a diverse network of designated and non-designated environmental assets, including nationally and locally important nature conservation sites, ancient woodland and other irreplaceable habitats, priority habitats, ecological networks and extensive areas of accessible natural greenspace. Parts of it also lie in the Surrey Hills and High Weald National Landscapes, while the wider countryside includes distinctive chalk downland, wooded hills and valleys, commons, farmland and low weald landscapes. 11.3 These assets do not operate in isolation. Ecological networks extend across individual sites and administrative boundaries, while green and blue infrastructure connects settlements with the wider countryside and can perform multiple functions for nature, recreation, water management, climate adaptation and health. The Local Plan takes an integrated approach which seeks both to protect existing environmental assets and to secure opportunities for restoration, enhancement and better connectivity. 11.4 Nature recovery is an important component of this approach. Habitat fragmentation, development pressures, climate change and changing land management have affected the ability of species and habitats to function as resilient ecological networks. The Surrey Local Nature Recovery Strategy provides an important strategic framework for identifying priorities and opportunities for habitat creation, restoration and enhancement. The Local Plan will support its implementation through the location and design of development, Biodiversity Net Gain and the allocation of land specifically for nature recovery. 11.5 The Natural Environment Policy comprises: Policy NE1: Biodiversity, geodiversity and nature recovery. Policy NE2: Green and blue infrastructure. Policy NE3: Countryside. Policy NE4: Landscape and National Landscapes. Biodiversity, geodiversity and nature recovery 11.6 The Tandridge District contains a diverse network of habitats associated with its woodlands, hedgerows, grasslands, commons, farmland, watercourses and wetlands, together with sites and features of geological importance. These assets are important individually and collectively, forming ecological networks which extend beyond site and administrative boundaries. 11.7 The District includes internationally, nationally and locally designated sites, Sites of Special Scientific Interest (SSSIs), Sites of Nature Conservation Importance (SNCIs), Potential Sites of Nature Conservation Importance (pSNCIs), ancient woodland, veteran and ancient trees, priority habitats and other irreplaceable ecological assets. These resources make an important contribution to biodiversity, ecological resilience and the character of the natural environment and require particular consideration in the design and assessment of development proposals. Regard should be given to the role of woodland, hedgerows, ponds and watercourses in maintaining ecological connectivity across the district. 11.8 Potential Sites of Nature Conservation Importance (pSNCIs) represent sites which have been identified as having the potential to meet the criteria for SNCI designation and are shown on the Policies Map. While they do not have the same status as designated SNCIs, they may contain habitats or ecological features of substantive biodiversity value. Development proposals affecting pSNCIs should be supported by sufficient ecological evidence to establish their ecological importance and should seek to avoid harm to habitats, species and features such as wildlife corridors which contribute to their potential nature conservation value. 11.9 Protecting individual designated sites alone is insufficient to secure ecological resilience. Species depend upon connections between habitats, while smaller features such as hedgerows, ponds, field margins and watercourses can provide important corridors and stepping stones. Development should consider the ecological function of the wider landscape and avoid severing or isolating habitats. 11.10 Wildlife corridors are a fundamental component of the District’s ecological network. Features such as woodland belts, hedgerows, watercourses, ponds, field margins, green lanes, species-rich grasslands and other linear habitats provide important routes through which species can move, disperse and adapt to environmental change. The maintenance and enhancement of these connections is particularly important in a changing climate, helping to reduce habitat fragmentation and support resilient ecological networks. Development should therefore seek to retain and strengthen existing wildlife corridors, avoid severance of ecological connections and where appropriate, create new links between habitats and strengthen ecological connectivity across the District. Particular regard should be given to the role of hedgerows, woodland edges, watercourses and other linear landscape features in maintaining ecological connectivity across the District. 11.11 Ecological evidence supporting a proposal should typically establish the ecological characteristics and condition of the site and its surroundings, the significance of any habitats, species, geological features and ecological connections which may be affected, the likely direct, indirect and cumulative effects, the opportunities to retain, restore, enhance and connect ecological assets and the mitigation, compensation, management and monitoring measures required. 11.12 Ecological effects can also arise beyond the immediate footprint of development. Lighting, recreational activity, noise, hydrological change and other forms of disturbance may affect habitats and species outside a development site. The scope of ecological assessment should respond to the likely zone of influence of the proposal. 11.13 Development proposals that may affect internationally designated habitats sites will be required to demonstrate compliance with the Conservation of Habitats and Species Regulations (Habitats Regulations) requirements. Proposals should avoid adverse effects on the integrity of designated sites either alone or in combination with other plans and projects. 11.14 Parts of the district fall in the recreational influence zone of the Ashdown Forest Special Protection Area (SPA) and Special Area of Conservation (SAC). Development within the 7km Zone of Influence will need to contribute to mitigation to ensure adherence to the Local Plan Habitats Regulations Assessment. This includes provision of SANGs, either on the development site itself or through a financial contribution to a strategic SANG elsewhere and a separate financial contribution towards a SAMM Strategy. 11.15 The mitigation hierarchy is central to the policy. Avoiding habitat loss or damage is generally preferable to attempting to recreate ecological value elsewhere. Ecological constraints and opportunities should influence site layout and design from the outset. Biodiversity Net Gain is additional to this process and should not be relied upon to justify avoidable damage to important existing habitats. 11.16 The Surrey Local Nature Recovery Strategy provides a strategic framework for identifying locations and measures where action can contribute most effectively to nature recovery. The Local Plan will support this approach by protecting ecological connections and encouraging development-led habitat creation and enhancement to contribute to wider nature recovery where appropriate. 11.17 The Council has determined the Local Plan will not establish a Biodiversity Net Gain requirement above the national minimum. This provides consistency with the national statutory regime while enabling the Council to focus locally on where gains are delivered and how they can complement wider ecological priorities. 11.18 Offsite Biodiversity Net Gain should, where relevant, take opportunities to contribute to priorities and measures identified through the Surrey Local Nature Recovery Strategy, strengthen existing ecological networks and address habitat fragmentation, restore or create priority and locally characteristic habitats, complement existing or planned habitat creation and management and provide ecologically coherent gains which can be effectively managed over the required period. Regard should be had to opportunities for offsite gains to contribute to strategic nature recovery objectives identified through the Local Nature Recovery Strategy and other relevant ecological evidence. 11.19 Development should also take proportionate opportunities for nature recovery which may not be fully reflected through the biodiversity metric, including species-specific measures, improved ecological connectivity and enhancement of existing habitats. 11.20 Biodiversity enhancement, compensation and Biodiversity Net Gain measures are only effective where they are supported by appropriate long-term management and stewardship. Management arrangements should be proportionate to the scale and type of habitat created or enhanced and should provide confidence that ecological benefits will be maintained for the required period.
Design & placemakingGreen Belt & countrysideNature & environment📍 Tandridge
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.