The human version (we wrote this, not the council)This section is the foreword from Councillor Catherine Sayer, Leader of the Council. It says the government has set Tandridge District Council a very high housing target of 819 homes per year. In the two previous consultations, nearly 89% of respondents put protecting the Green Belt and countryside first, and more than two-thirds said development should be phased to match infrastructure. The Plan aims to minimise harm to the Green Belt and set lasting boundaries. Without an up to date plan, the district faces speculative planning applications. On 1 April next year the East Surrey unitary authority takes over planning, so the Council wants this Plan ready first.
OpenConsult / Tandridge Plan Explorer
Tandridge
24 sections of the plan, in document order.
The human version (we wrote this, not the council)This section introduces the Tandridge District Local Plan, which sets out how growth will be delivered to 2042. It is the Regulation 19 version, covering 2027 to 2042, and will replace the Core Strategy 2008 in full. The plan period was cut from 2044 to 2042. On 1 April 2027, East Surrey Council will replace Tandridge District Council. The Plan must pass four soundness tests: positively prepared, justified, effective and consistent with national policy. Comments should focus on legal compliance and soundness, sent through the online portal, by email or by post. The publication period runs for at least six weeks, closing at 9am on Tuesday 8 December 2026.
The human version (we wrote this, not the council)This section sets out the Plan's vision and ten strategic objectives. By 2042, the district should keep its rural, historic and landscape character while delivering homes, jobs and infrastructure. Growth will go to accessible places, with infrastructure phased alongside it, brownfield land put first and Green Belt released only in exceptional circumstances. Delivery has averaged 247 homes since 2006/2007. The Plan aims for an average of 663 dwellings per year through strategic development at Redhill Aerodrome and justified Green Belt release elsewhere. Land south of Redhill Aerodrome is safeguarded for possible future need. The objectives cover growth, housing, health, the economy, infrastructure, climate change, nature, heritage, design and monitoring.
The human version (we wrote this, not the council)This section explains the district's constraints and development needs. About 94% of the district is Green Belt. The standard method gives 819 dwellings each year, a minimum of 12,285 dwellings over the 15 years from adoption in 2027. The HEDNA identifies about 21.4 hectares of employment land need: 10.3 ha of E(g)(i-ii), 4.5 ha of E(g)(iii) / B2 and 6.6 ha of B8. Existing commitments add only 0.6 ha. The GTAA finds a need for 143 Gypsy and Traveller pitches and 69 Travelling Showpeople plots from 2025/2026 to 2044/2045. The Infrastructure Delivery Plan identifies the main infrastructure needed.
The human version (we wrote this, not the council)This section introduces the housing policies H1 to H7. The Plan provides a minimum of 9,946 net additional dwellings between 1 April 2027 and 31 March 2042, through a stepped trajectory. Supply comes from commitments of around 1,612 dwellings, about 2,350 at Redhill Aerodrome from year 6, about 4,124 on new allocations, about 1,300 from the Settlement and Windfall Study and about 560 from rural windfall. Land next to Redhill Aerodrome is removed from the Green Belt but not allocated. The stepped requirement rises from 350 dwellings in 2027/2028 to 600 a year, averaging 470 over five years, then 760 a year from 2032/2033.
The human version (we wrote this, not the council)This policy sets the housing requirement and sources of supply. The Plan will deliver a minimum of 9,946 net additional dwellings by 31 March 2042. Supply comes from commitments of 1,612 dwellings, a strategic allocation of at least 2,350, housing allocations of at least 4,124, settlement capacity of around 1,300 and rural windfall of around 560. Delivery is stepped: 2,350 homes from 1 April 2027 to 31 March 2032, averaging 470 a year, then an average of 760 a year from 1 April 2032. At least 10% of homes will come from small sites of no more than one hectare. The requirement is a minimum, not a ceiling.
The human version (we wrote this, not the council)This policy sets affordable housing requirements for developments of six or more dwellings or 1,000m2 of floorspace, unless a site allocation policy says otherwise. Schemes of 6 to 9 dwellings provide 40% offsite through commuted sums. Schemes of 10 or more provide 30% on previously developed land and 50% on greenfield land. The split should be 80% for rent and 20% for ownership, with at least 40% of the rented part as social rent. Major schemes provide them onsite. Lower amounts need a viability assessment, tested by the Council's independent consultant. Small rural exception sites may be allowed, and splitting sites to avoid the rules is not permitted.
The human version (we wrote this, not the council)This policy provides for about 21.4 hectares of employment land over the Plan period. New or improved employment schemes will be supported where they meet identified needs, offer modern flexible premises, use land efficiently, have suitable access and digital connectivity and avoid unacceptable impacts. Existing sites in E(g), B2 and B8 use will be protected, with particular weight given to Strategic and Important Employment Sites. Loss to other uses is only supported if the site is allocated for another use, has no reasonable prospect of employment use, or would not undermine supply. Mixed-use schemes keeping some employment come first.
The human version (we wrote this, not the council)This policy supports a prosperous and sustainable rural economy. It backs the growth, diversification and modernisation of rural businesses, tourism and land-based enterprises such as farming and forestry, where they respect the countryside. Proposals should use existing buildings or previously developed land where practical. New buildings must show a need for a countryside location and relate well to existing buildings. Schemes must suit their rural setting in scale, avoid urbanisation, provide safe access and parking and avoid harm to neighbours from traffic, noise or lighting. They should conserve landscape, biodiversity and heritage. Conditions or obligations may tie development to the enterprise that justified it.
The human version (we wrote this, not the council)This section introduces the infrastructure and transport policies INF1 and INF2. It says development must be coordinated with timely infrastructure, as capacity varies across the district. Infrastructure covers transport, education, healthcare, water, wastewater, flood and drainage, energy, digital links and community facilities. The Infrastructure Delivery Plan (IDP) is the main evidence and will be kept up to date. Funding can come from developer contributions, the Community Infrastructure Levy (CIL), public investment and other sources, but funding strategic infrastructure remains challenging. Contributions should only address a development's own impacts. Cumulative impacts matter, and some development may need phasing. Land for future infrastructure should be safeguarded.
The human version (we wrote this, not the council)This policy supports development only where the infrastructure needed to serve it and mitigate its impacts, alone and together with other schemes, can be delivered on time. Developers must show there is enough capacity or that extra infrastructure will come at the right time. They must fund or contribute to new infrastructure and provide land where needed. Provision will take account of the Infrastructure Delivery Plan, the needs of service providers, site allocation policies and cumulative impacts, and may be phased. Development must safeguard land and routes needed for planned infrastructure. Schemes that would prejudice such infrastructure will not be supported unless suitable alternative provision is secured.
The human version (we wrote this, not the council)This policy requires an integrated approach to water management. Development must show that flood risk, surface water drainage, water supply, wastewater capacity, water quality and the natural water environment have been considered from the start of design. The individual and cumulative effects on the water environment must be assessed. The infrastructure needed for water supply, wastewater, drainage and flood risk must be deliverable at the right stage, and applicants should talk to water companies early. In catchments sensitive to the cumulative effects of development, proposals must not increase flood risk or harm the ecological condition of rivers, and should help improve catchment resilience where appropriate.
The human version (we wrote this, not the council)This policy requires development to include Sustainable Drainage Systems (SuDS) unless they are shown to be inappropriate. Surface water should be managed as close to its source as practical and discharged following the drainage hierarchy. Drainage must not increase flood risk on or off the site, must achieve suitable runoff rates, allow for climate change, handle exceedance flows safely and have long-term maintenance arrangements. Above-ground and nature-based solutions should come first. Major and phased schemes need a coordinated drainage strategy for the whole site. In Groundwater Source Protection Zones, infiltration is only supported where there is no unacceptable risk to groundwater quality.
The human version (we wrote this, not the council)This section introduces the Green Belt chapter. About 94% of Tandridge District is Green Belt, which keeps settlements apart, contains built-up areas and protects the countryside. The Plan aims to balance long-term protection of the Green Belt with planning for sustainable development, releasing land only where necessary and justified. Grey Belt is a category of Green Belt land in national policy, but calling land Grey Belt does not change the boundary or mean development is acceptable. The Stage 1 and Stage 2 Green Belt Assessments looked at how land performs. The chapter contains Policies GRB1 and GRB2.
The human version (we wrote this, not the council)This policy says the extent of the Green Belt in Tandridge District is shown on the Policies Map, and development there will be decided in line with national policy. In defined villages in the Green Belt, unless land is allocated in this Plan, limited infilling normally means building on a small gap in an otherwise substantially developed frontage. Infilling must stay within the built form of the village and not spread into the countryside. It must respect village character, plot widths, building lines and spacing. It must avoid ribbon development and poor plot subdivision, and keep open areas that matter to the village.
The human version (we wrote this, not the council)This section introduces the natural environment chapter. It says the district's landscapes, woodlands, hedgerows, watercourses and habitats support wildlife, recreation, flood management and climate resilience. Parts of the district lie in the Surrey Hills and High Weald National Landscapes. The Plan aims to protect these assets and to restore and connect them, supported by the Surrey Local Nature Recovery Strategy. It explains the need to keep wildlife corridors and apply the mitigation hierarchy. Development within the 7km Zone of Influence of the Ashdown Forest SPA and SAC must help pay for mitigation. The Council will not require Biodiversity Net Gain above the national minimum.
The human version (we wrote this, not the council)This policy says development must protect and, where suitable, improve the district's green and blue infrastructure, such as trees, hedgerows, watercourses, ponds and green spaces. It should avoid needless loss or breaks in the network, and unavoidable loss must be replaced or mitigated. Development on land not previously developed must provide green or blue infrastructure on site. Development on previously developed land must make the most of chances for urban greening. Features should serve several purposes where possible. Existing trees, hedgerows and water features must be kept, or applicants must explain why not. Management and maintenance must be shown for at least 25 years.
The human version (we wrote this, not the council)This policy says development in the countryside will only be supported where it fits the Spatial Strategy and national policy, and conserves countryside character. Proposals must show a need for a countryside location and be in proportion to their surroundings. They must not cause unacceptable loss of land that serves farming or keeps settlements apart, and must avoid ribbon or sporadic development. They should avoid losing Best and Most Versatile agricultural land. They must keep the setting of settlements, including soft edges and views, and keep trees, hedgerows and field boundaries. Development in the Green Belt must also follow Policy GRB1.
The human version (we wrote this, not the council)This section introduces the place, design and heritage chapter. It says good design is key to the Spatial Strategy and should shape development from the start, not just its appearance. No single design answer suits the whole district, and contemporary design can be welcome where it responds to its setting. The Council will take a design-led approach, using masterplans and design codes for larger schemes. The section explains how layout, density, public spaces, safety, lighting, parking and refuse storage should be handled, and says brownfield schemes should still include greening. The chapter contains Policies DES1, DES2 and DES3.
The human version (we wrote this, not the council)This policy says development must be design-led and respond well to the character of its site and surroundings. Scale, height, massing and density must suit the context while making effective use of land. Layouts must be clear and connected, and support walking, wheeling and cycling. Streets and public spaces must put people first and be safe and inclusive for people of different ages and abilities. Development must avoid harm from overlooking, loss of daylight, noise, pollution or poor lighting. Landscape and greening must be built in from the start and meet Policy NE2. Parking and refuse storage must not dominate streets.
The human version (we wrote this, not the council)This section introduces the health and communities chapter. It says planning affects health through housing, transport, open space, environmental quality and access to services. Tandridge District has relatively good health outcomes, but these are not shared equally, and services can be hard to reach without a car. There is a shortage of health facilities in the south of the district and no accident and emergency hospital in the district. A proportionate Health Impact Assessment (HIA) will be needed for major development and some other schemes. Infrastructure will be secured mainly through Policy INF1. The chapter contains Policies HC1 to HC4.
The human version (we wrote this, not the council)This policy says development must support healthy, inclusive and safe communities and should help health and wellbeing. Development should support active lifestyles, give safe access to services, open space and recreation, and support social interaction. It should avoid poor environmental conditions and consider groups who face barriers to services. A proportionate Health Impact Assessment is required for major development. It is also required for other schemes with possible significant health effects, such as those creating large extra demand for healthcare or education, or affecting communities with health inequalities. Assessments should be done early, and harmful effects must be avoided, minimised or mitigated.
The human version (we wrote this, not the council)This section introduces the climate change and resilience chapter. The Council declared a climate emergency in 2020, and its Climate Change Strategy aligns with the national aim of net zero greenhouse gas emissions by 2050. The section says development should cut emissions and adapt to higher temperatures, more extreme rainfall, flood risk and pressure on water. It explains the energy hierarchy, which reduces demand before relying on renewable energy, and a fabric-first approach to building design. Major development should consider whole-life carbon and the reuse of suitable buildings. Water matters are covered in Policies WAT1, WAT2, WAT3 and WAT4.
The human version (we wrote this, not the council)This section is the glossary, which explains terms used in the Local Plan. It defines terms such as deliverable and developable sites, Green Belt and its five purposes, Grey Belt, and major development, which for housing means 10 or more homes or a site of 0.5 hectares or more. It also explains Local Green Space, National Landscapes, previously developed land, Social Rent and windfall sites. Other entries cover housing terms such as self-build and custom-build housing and discounted market sales housing at least 20% below local market value. The glossary ends with contact details for Tandridge District Council in Oxted.