← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / 4. Context and development need

From the plan

4. Context and development need

On pages 15 to 16 of the official PDF.

The human version

This section explains the district's constraints and development needs. About 94% of the district is Green Belt. The standard method gives 819 dwellings each year, a minimum of 12,285 dwellings over the 15 years from adoption in 2027. The HEDNA identifies about 21.4 hectares of employment land need: 10.3 ha of E(g)(i-ii), 4.5 ha of E(g)(iii) / B2 and 6.6 ha of B8. Existing commitments add only 0.6 ha. The GTAA finds a need for 143 Gypsy and Traveller pitches and 69 Travelling Showpeople plots from 2025/2026 to 2044/2045. The Infrastructure Delivery Plan identifies the main infrastructure needed.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 15

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

4. Context and development need 4.1 The Tandridge District is one of the most constrained authorities in the South East. It has a dispersed settlement pattern comprising larger urban settlements, rural service settlements, villages, smaller settlements and rural communities. Approximately 94% of the district is designated as Green Belt and the Green Belt forms a fundamental part of the district’s character, settlement pattern and countryside setting and plays an important role in preventing urban sprawl, maintaining separation between settlements and safeguarding the countryside from encroachment. 4.2 In addition, large areas of the District are covered by National Landscape, significant environmental and heritage assets and areas of flood risk. The dispersed settlement pattern means there is limited scope to accommodate development needs in any single settlement or group of settlements and significantly influence the amount, distribution and form of development that can be accommodated. Housing need 4.3 The starting point for establishing the housing requirement is the standard method set out in national planning policy and guidance. For the Tandridge District, the current standard method figure is 819 dwellings each year. 4.4 The Local Plan covers the period 2027 to 2042 and provides 15 years of housing supply from the anticipated date of adoption in 2027, in accordance with national policy. Applying the standard method figure of 819 dwellings each year results in a minimum housing need of 12,285 dwellings over the 15-year period from adoption. 4.5 The Housing and Economic Development Needs Assessment (HEDNA) identifies significant affordable housing needs and a requirement for a range of dwelling sizes, tenures and specialist housing. These needs have informed Policies H2, H3, H4 and H5. Employment land need 4.6 The Housing and Economic Development Needs Assessment (HEDNA) identifies a requirement for approximately 21.4 hectares of employment land under the preferred Local Growth Scenario. This requirement comprises provision for office, research and development, industrial and storage and distribution uses. The evidence identifies pressures in the industrial and storage and distribution market, along with demand for smaller, flexible and good quality employment premises serving local businesses and growing firms. 4.7 Existing commitments make only a modest (0.6 ha) contribution towards meeting identified employment needs. The Plan seeks to support economic growth through a combination of employment allocations, the protection and improvement of existing employment areas, the intensification of employment sites and suitable windfall development. 4.8 The identified employment need has informed the Plan's approach to employment land provision, the protection of existing employment sites and the allocation of new opportunities for economic development. 4.9 By use class, the identified need comprises 10.3 hectares of E(g)(i-ii) land, 4.5 hectares of E(g)(iii) / B2 land and 6.6 hectares of B8 land. The office need is substantially influenced by the replacement allowance for historic losses and should not be interpreted as a requirement for all future provision to take the form of traditional large-format office development. The evidence points instead towards demand for smaller, flexible and high-quality premises suitable for local businesses, start-ups, hybrid working patterns and modern service-based employment. Table 3: Employment land type Use class Need E(g)(i-ii) 10.3 ha E(g)(iii) / B2 4.5 ha B8 6.6 ha Total 21.4 ha Gypsy, Traveller and Travelling Showpeople accommodation need and delivery 4.10 The Local Plan must assess and plan positively for the accommodation needs of Gypsies, Travellers and Travelling Showpeople. These needs form a distinct part of the housing evidence base and are assessed through the Gypsy and Traveller Accommodation Assessment (GTAA) and supporting Pitch Delivery Assessment (PDA). 4.11 The GTAA identifies a need for 143 Gypsy and Traveller pitches and 69 Travelling Showpeople plots over the period 2025/2026 to 2044/2045. The assessment recommends that need should be addressed through a combination of existing permissions, the intensification and expansion of suitable existing sites and yards, additional allocations where necessary and criteria-based policies to support appropriate windfall provision. 4.12 The Council's monitoring demonstrates that a deliverable five-year supply of Gypsy and Traveller pitches can be identified through existing permissions, authorised provision and opportunities identified through the PDA. Additional provision for Travelling Showpeople remains an important matter for the Plan to address. The Local Plan provides a positive and flexible framework for meeting identified accommodation needs through site allocations, existing authorised provision and Policy H6. Infrastructure and delivery 4.13 The timely provision of infrastructure is fundamental to the delivery of the Spatial Strategy. Infrastructure requirements include transport, education, healthcare, utilities, digital connectivity, open space, community facilities, green infrastructure and flood risk mitigation. The Infrastructure Delivery Plan identifies the principal infrastructure required to support planned growth and the organisations responsible for its delivery.
Gypsy & Traveller sitesHomes & housingJobs & economy📍 Tandridge
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.