← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / GRB1

Policy GRB1

Green Belt

On pages 59 to 60 of the official PDF.

The human version

This policy says the extent of the Green Belt in Tandridge District is shown on the Policies Map, and development there will be decided in line with national policy. In defined villages in the Green Belt, unless land is allocated in this Plan, limited infilling normally means building on a small gap in an otherwise substantially developed frontage. Infilling must stay within the built form of the village and not spread into the countryside. It must respect village character, plot widths, building lines and spacing. It must avoid ribbon development and poor plot subdivision, and keep open areas that matter to the village.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 59

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy GRB1: Green Belt 1. The extent of the Green Belt in Tandridge District is defined on the Policies Map. 2. Development in the Green Belt will be determined in accordance with national policy. Defined villages in the Green Belt 3. In defined villages in the Green Belt, as identified on the Policies Map, unless subject to an allocation in this Plan, limited infilling will normally comprise the development of a small gap in an otherwise substantially developed frontage and must: a. Be contained in the established built form of the village and not result in outward encroachment into the surrounding countryside. b. Be of a scale, form, density and siting that respects the character of the village and surrounding frontage. c. Maintain an appropriate relationship with prevailing plot widths, building lines, spacing and separation between buildings. d. Avoid ribbon development, inappropriate plot subdivision and the consolidation of otherwise dispersed patterns of development. e. Preserve areas of openness that make an important contribution to the character of the village and the openness of the Green Belt. Green Belt release and beneficial use 10.14 Where exceptional circumstances have justified alterations to Green Belt boundaries through this Local Plan, the affected land is identified on the Policies Map and through the relevant site allocation policies. The justification for individual releases is set out through the site allocation process and supporting evidence. 10.15 Green Belt boundary changes have been made where necessary to deliver the Spatial Strategy. The resulting Green Belt boundaries are shown on the Policies Map. 10.16 The remaining Green Belt must retain a coherent and enduring structure beyond the Plan period. Where development adjoins a new Green Belt boundary, particular attention should be given to the relationship between development and the remaining Green Belt, including the use of permanent and readily recognisable physical features and appropriate landscape and green infrastructure treatment. 10.17 National policy encourages the beneficial use of Green Belt land. Opportunities to improve public access, support recreation, enhance landscapes, strengthen green and blue infrastructure, restore damaged land and contribute to biodiversity enhancement and nature recovery should be taken wherever appropriate and compatible with the purposes of the Green Belt.
Design & placemakingGreen Belt & countrysideSite allocations📍 Tandridge
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.