← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / HC3

Policy HC3

Open space, recreation and play

On pages 83 to 84 of the official PDF.

The human version

This policy protects existing open space, sports and recreation land. New homes must provide or pay towards open space using standards per 1,000 population, totalling 3.79 ha. These are 0.25 ha of allotments, 0.60 ha of amenity green space, 0.80 ha of parks and recreation grounds, 0.07 ha each of children's and youth play space and 2.00 ha of accessible natural green space. Each also has a straight-line distance standard. An occupancy of 2.5 persons per dwelling is normally assumed. Space is provided on site where it can work well, otherwise contributions may be accepted. Spaces need long-term management and funding.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 83

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy HC3: Open space, recreation and play Protection of existing provision 1. Existing open space, local green space, sports and recreational land and facilities will be protected. Open space standards 2. Net new residential development as set out in the identified scheme size must provide or contribute towards open space in accordance with the standards set out below. Open space typology Quantity standard per 1,000 population Accessibility standard straight-line distance Allotments 0.25 ha 720 m Amenity green space 0.60 ha 480 m Parks and recreation grounds 0.80 ha 720 m Children’s play space 0.07 ha 480 m Youth play space 0.07 ha 600 m Accessible natural green space 2.00 ha 720 m and the applicable Natural England Accessible Greenspace Standards Total 3.79 ha - 3. Requirements arising from residential development will normally be calculated using an assumed occupancy of 2.5 persons per dwelling unless the nature of the development indicates that an alternative occupancy rate would be more appropriate, or more up-to-date Council evidence is available. 4. Onsite provision will be required where the need generated by development is sufficient to create a functional, accessible and maintainable space of the relevant typology and where onsite provision is necessary to meet the needs of future occupiers. 5. Where the need generated by development is insufficient to support a functional onsite provision, or where onsite provision would result in fragmented, poorly located or otherwise non-functional space, contributions towards new or improved provision elsewhere may be accepted where they would provide a demonstrably better outcome. 6. Requirements will be applied to: a. The scale and population generated by the development. b. Existing provision serving the site, including its quantity, quality and accessibility. c. Identified deficiencies and priorities. d. Opportunities for multifunctional provision and improvement of existing facilities. Quality and design 7. Open space, recreation and play provision must: a. Be high-quality, accessible, inclusive and safe. b. Be integrated into the layout and landscape structure of development. c. Provide convenient connections to walking, wheeling and cycling routes. d. Support biodiversity, green infrastructure and sustainable drainage objectives where appropriate. e. Be designed to enable effective long-term management and maintenance. Sport, recreation and play 8. Development must provide or contribute towards children's play, youth provision and outdoor recreation in accordance with the needs generated by the development and identified local deficiencies. 9. Requirements for playing pitches, outdoor sports facilities and related improvements will be determined having regard to the latest Playing Pitch Strategy and other relevant evidence. 10. Opportunities to improve community access to existing sports and recreation facilities, including education facilities where appropriate, will be supported where they respond to identified need. Management 11. Open space, recreation and play provision must be supported by appropriate arrangements for long- term management, maintenance and funding. Local Green Space 13.38 Local Green Space designation also provides communities with a means of identifying and protecting green areas that are demonstrably special to them and hold particular local significance because of their beauty, historic importance, recreational value, tranquillity, richness of wildlife or contribution to local character. Local Green Space designation is intended to provide protection consistent with that for Green Belt, while recognising the distinct and locally important role such spaces play in settlements and surrounding communities. The Local Green Spaces designated through this Plan and Neighbourhood Plans are identified on the Policies Map and will be protected in accordance with Policy HC4.
Design & placemakingHealth, schools & communityInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.