The human version (we wrote this, not the council)This section is the foreword from Councillor Catherine Sayer, Leader of the Council. It says the government has set Tandridge District Council a very high housing target of 819 homes per year. In the two previous consultations, nearly 89% of respondents put protecting the Green Belt and countryside first, and more than two-thirds said development should be phased to match infrastructure. The Plan aims to minimise harm to the Green Belt and set lasting boundaries. Without an up to date plan, the district faces speculative planning applications. On 1 April next year the East Surrey unitary authority takes over planning, so the Council wants this Plan ready first.
OpenConsult / Tandridge Plan Explorer
Infrastructure & utilities
The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.
393 sections of the plan, in document order.
The human version (we wrote this, not the council)This section introduces the Tandridge District Local Plan, which sets out how growth will be delivered to 2042. It is the Regulation 19 version, covering 2027 to 2042, and will replace the Core Strategy 2008 in full. The plan period was cut from 2044 to 2042. On 1 April 2027, East Surrey Council will replace Tandridge District Council. The Plan must pass four soundness tests: positively prepared, justified, effective and consistent with national policy. Comments should focus on legal compliance and soundness, sent through the online portal, by email or by post. The publication period runs for at least six weeks, closing at 9am on Tuesday 8 December 2026.
The human version (we wrote this, not the council)This section explains the Spatial Strategy. It puts brownfield and underused land in settlements first, but this cannot meet needs in full, so the Plan also allocates greenfield and Green Belt land. Table 4 sets out a four-tier settlement hierarchy, from Urban Centres such as Caterham on the Hill and Oxted down to smaller villages and hamlets. The Council says exceptional circumstances justify Green Belt boundary changes. Redhill Aerodrome is the main strategic site, expected to deliver about 2,350 homes. The minimum housing requirement is 9,946 over the plan period, around 663 homes each year, compared with past delivery of about 247. Policies SP1 and SP2 follow.
The human version (we wrote this, not the council)This policy sets out how the Plan will meet development needs. It provides for a minimum of 9,946 homes under Policy H1. The Council accepts that a residual housing need remains against the standard method. It will address this through further development, by exploring land south of Redhill Aerodrome in a Local Plan review, and through cross-boundary work including the Surrey Strategic Development Strategy. An early review will start no later than the third anniversary of adoption. The Plan provides for 143 Gypsy and Traveller pitches, 69 Travelling Showpeople plots and about 21.4 hectares of employment land. These are minimums, and extra development meeting set criteria will be supported.
The human version (we wrote this, not the council)This section introduces the housing policies H1 to H7. The Plan provides a minimum of 9,946 net additional dwellings between 1 April 2027 and 31 March 2042, through a stepped trajectory. Supply comes from commitments of around 1,612 dwellings, about 2,350 at Redhill Aerodrome from year 6, about 4,124 on new allocations, about 1,300 from the Settlement and Windfall Study and about 560 from rural windfall. Land next to Redhill Aerodrome is removed from the Green Belt but not allocated. The stepped requirement rises from 350 dwellings in 2027/2028 to 600 a year, averaging 470 over five years, then 760 a year from 2032/2033.
The human version (we wrote this, not the council)This policy sets the housing requirement and sources of supply. The Plan will deliver a minimum of 9,946 net additional dwellings by 31 March 2042. Supply comes from commitments of 1,612 dwellings, a strategic allocation of at least 2,350, housing allocations of at least 4,124, settlement capacity of around 1,300 and rural windfall of around 560. Delivery is stepped: 2,350 homes from 1 April 2027 to 31 March 2032, averaging 470 a year, then an average of 760 a year from 1 April 2032. At least 10% of homes will come from small sites of no more than one hectare. The requirement is a minimum, not a ceiling.
The human version (we wrote this, not the council)This policy sets affordable housing requirements for developments of six or more dwellings or 1,000m2 of floorspace, unless a site allocation policy says otherwise. Schemes of 6 to 9 dwellings provide 40% offsite through commuted sums. Schemes of 10 or more provide 30% on previously developed land and 50% on greenfield land. The split should be 80% for rent and 20% for ownership, with at least 40% of the rented part as social rent. Major schemes provide them onsite. Lower amounts need a viability assessment, tested by the Council's independent consultant. Small rural exception sites may be allowed, and splitting sites to avoid the rules is not permitted.
The human version (we wrote this, not the council)This policy sets the housing mix for developments of five or more dwellings. Its indicative mix for market housing is 10% one bedroom, 25% two bedroom, 35% three bedroom and 30% four or more bedrooms. For social or affordable rent it is 50% one bedroom, 35% two bedroom, 10% three bedroom and 5% four or more. Affordable ownership leans to two bedroom homes, at 45%. Proposals must show how their mix responds to local need, the site, existing housing stock, tenure and viability. Departures without adequate justification will not be supported. All new dwellings must meet the Nationally Described Space Standard unless exceptional site circumstances justify a lower standard.
The human version (we wrote this, not the council)This policy supports more housing for older people and others with care or support needs, where there is an identified need and the location and design are suitable. This includes retirement, sheltered, extra care and supported living housing, and residential and nursing care. Where care is part of the case, applicants must show a qualified care provider can run it for the lifetime of the development. Schemes should be close to services. Loss of existing care accommodation needs justification. Major residential schemes must provide at least 40% of homes to M4(2), at least 5% of market homes to M4(3)(2)(a) and up to 10% of affordable homes to M4(3)(2)(b).
The human version (we wrote this, not the council)This policy aims to meet the identified accommodation needs of Gypsies, Travellers and Travelling Showpeople. Provision will come from existing authorised supply, intensifying and expanding existing sites and yards, allocations on the Policies Map and suitable windfall sites. New pitches, plots or expansions will be supported where they meet a list of criteria. These include no significant harm to local character, no unacceptable harm to amenity, safe access, adequate utilities and drainage, reasonable access to services, acceptable flood risk and compliance with Green Belt policy. Travelling Showpeople yards need space to store, maintain and test equipment. Intensifying existing sites for extended families and varying caravan conditions will be considered positively.
The human version (we wrote this, not the council)This policy sets the hierarchy of centres. Caterham and Oxted are Town Centres. Caterham-on-the-Hill, Lingfield, Warlingham and Whyteleafe are Local Centres. Development in centres is supported where it fits their role and keeps them lively and viable, for example by adding shops, leisure and food and drink uses or reusing vacant space. Homes in centres are supported, but in primary shopping areas they should be on upper floors or avoid losing active ground-floor frontages. Main town centre uses outside centres must pass the sequential approach. Retail and leisure schemes above 500 sqm gross floorspace outside town centres need an impact assessment. Loss of local shops and services needs justification.
The human version (we wrote this, not the council)This section introduces the infrastructure and transport policies INF1 and INF2. It says development must be coordinated with timely infrastructure, as capacity varies across the district. Infrastructure covers transport, education, healthcare, water, wastewater, flood and drainage, energy, digital links and community facilities. The Infrastructure Delivery Plan (IDP) is the main evidence and will be kept up to date. Funding can come from developer contributions, the Community Infrastructure Levy (CIL), public investment and other sources, but funding strategic infrastructure remains challenging. Contributions should only address a development's own impacts. Cumulative impacts matter, and some development may need phasing. Land for future infrastructure should be safeguarded.
The human version (we wrote this, not the council)This policy supports development only where the infrastructure needed to serve it and mitigate its impacts, alone and together with other schemes, can be delivered on time. Developers must show there is enough capacity or that extra infrastructure will come at the right time. They must fund or contribute to new infrastructure and provide land where needed. Provision will take account of the Infrastructure Delivery Plan, the needs of service providers, site allocation policies and cumulative impacts, and may be phased. Development must safeguard land and routes needed for planned infrastructure. Schemes that would prejudice such infrastructure will not be supported unless suitable alternative provision is secured.
The human version (we wrote this, not the council)This policy requires development to provide or connect to safe, inclusive and sustainable movement networks. Design should follow a hierarchy: walking and wheeling first, then cycling, then public and shared transport, and private motor vehicles last. Public Rights of Way and bridleways should not be the main access if they are not up to standard. The Council will judge access by the most direct and realistic routes. Being near a railway station is not enough on its own. Schemes must assess transport impacts through a Transport Assessment or Transport Statement and provide mitigation. They must provide parking, servicing and electric vehicle infrastructure, and must not rely on uncommitted infrastructure.
The human version (we wrote this, not the council)This section introduces the water management policies WAT1 to WAT4. It says growth should be resilient to flood risk and climate change and should not overload water resources, drainage or wastewater networks. Development should follow the sequential approach to flood risk, use sustainable drainage and cut demand for potable water. The Plan draws on Level 1 and Level 2 Strategic Flood Risk Assessments and a Water Cycle Study, with any mitigation set out in the Infrastructure Delivery Plan. Applicants should talk to water companies early. The Council will work with the Environment Agency, SES Water, Southern Water, Thames Water and others.
The human version (we wrote this, not the council)This policy requires an integrated approach to water management. Development must show that flood risk, surface water drainage, water supply, wastewater capacity, water quality and the natural water environment have been considered from the start of design. The individual and cumulative effects on the water environment must be assessed. The infrastructure needed for water supply, wastewater, drainage and flood risk must be deliverable at the right stage, and applicants should talk to water companies early. In catchments sensitive to the cumulative effects of development, proposals must not increase flood risk or harm the ecological condition of rivers, and should help improve catchment resilience where appropriate.
The human version (we wrote this, not the council)This policy requires development to include Sustainable Drainage Systems (SuDS) unless they are shown to be inappropriate. Surface water should be managed as close to its source as practical and discharged following the drainage hierarchy. Drainage must not increase flood risk on or off the site, must achieve suitable runoff rates, allow for climate change, handle exceedance flows safely and have long-term maintenance arrangements. Above-ground and nature-based solutions should come first. Major and phased schemes need a coordinated drainage strategy for the whole site. In Groundwater Source Protection Zones, infiltration is only supported where there is no unacceptable risk to groundwater quality.
The human version (we wrote this, not the council)This policy requires development to minimise demand for potable water and use water efficiently. New homes must use no more than 110 litres per person per day, or any replacement national standard. Measures such as rainwater harvesting and greywater recycling are encouraged where suitable. Development must protect the quality of rivers and groundwater, including Groundwater Source Protection Zones, and prevent pollution. Developers must show there is enough water supply, sewerage and wastewater treatment capacity, or that it will be delivered before development starts. Schemes must connect to the public foul sewer where reasonably practical and keep foul and surface water separate. Land for water infrastructure must be safeguarded.
The human version (we wrote this, not the council)This policy says development must protect and, where suitable, improve the district's green and blue infrastructure, such as trees, hedgerows, watercourses, ponds and green spaces. It should avoid needless loss or breaks in the network, and unavoidable loss must be replaced or mitigated. Development on land not previously developed must provide green or blue infrastructure on site. Development on previously developed land must make the most of chances for urban greening. Features should serve several purposes where possible. Existing trees, hedgerows and water features must be kept, or applicants must explain why not. Management and maintenance must be shown for at least 25 years.
The human version (we wrote this, not the council)This section introduces the health and communities chapter. It says planning affects health through housing, transport, open space, environmental quality and access to services. Tandridge District has relatively good health outcomes, but these are not shared equally, and services can be hard to reach without a car. There is a shortage of health facilities in the south of the district and no accident and emergency hospital in the district. A proportionate Health Impact Assessment (HIA) will be needed for major development and some other schemes. Infrastructure will be secured mainly through Policy INF1. The chapter contains Policies HC1 to HC4.
The human version (we wrote this, not the council)This policy says development must support healthy, inclusive and safe communities and should help health and wellbeing. Development should support active lifestyles, give safe access to services, open space and recreation, and support social interaction. It should avoid poor environmental conditions and consider groups who face barriers to services. A proportionate Health Impact Assessment is required for major development. It is also required for other schemes with possible significant health effects, such as those creating large extra demand for healthcare or education, or affecting communities with health inequalities. Assessments should be done early, and harmful effects must be avoided, minimised or mitigated.
The human version (we wrote this, not the council)This policy protects community facilities. Their loss will only be supported where it is shown that the facility is no longer needed, that equal or better replacement will be provided, and that continued community use is unviable. Particular regard is given to facilities serving rural communities. Where lack of viability or demand is claimed, evidence must include active and realistic marketing for community use for at least 12 continuous months. Redeveloping part of a site may be allowed to keep or improve the facility. New or improved facilities will be supported where they meet a need. Strategic and major development should deliver new or expanded facilities.
The human version (we wrote this, not the council)This policy protects existing open space, sports and recreation land. New homes must provide or pay towards open space using standards per 1,000 population, totalling 3.79 ha. These are 0.25 ha of allotments, 0.60 ha of amenity green space, 0.80 ha of parks and recreation grounds, 0.07 ha each of children's and youth play space and 2.00 ha of accessible natural green space. Each also has a straight-line distance standard. An occupancy of 2.5 persons per dwelling is normally assumed. Space is provided on site where it can work well, otherwise contributions may be accepted. Spaces need long-term management and funding.
The human version (we wrote this, not the council)This section introduces the climate change and resilience chapter. The Council declared a climate emergency in 2020, and its Climate Change Strategy aligns with the national aim of net zero greenhouse gas emissions by 2050. The section says development should cut emissions and adapt to higher temperatures, more extreme rainfall, flood risk and pressure on water. It explains the energy hierarchy, which reduces demand before relying on renewable energy, and a fabric-first approach to building design. Major development should consider whole-life carbon and the reuse of suitable buildings. Water matters are covered in Policies WAT1, WAT2, WAT3 and WAT4.
The human version (we wrote this, not the council)This section introduces the implementation, monitoring and plan review chapter. It says the Plan's success depends on the Council working with landowners, developers, infrastructure providers and communities. Progress will be reported mainly through the Authority Monitoring Report, supported by the housing trajectory, five-year housing land supply, Infrastructure Delivery Plan and Infrastructure Funding Statement. Housing delivery will be monitored closely, and where it falls behind, the Council will look into the causes. Missing a single indicator will not automatically trigger a review of the Plan. A review is appropriate where a material part of the Spatial Strategy is no longer effective or deliverable.
The human version (we wrote this, not the council)This policy says the Council will monitor how well the Local Plan is working through the framework in Table IM1, the Authority Monitoring Report and the Infrastructure Delivery Plan. Where delivery falls short, the Council will look into the cause and act. In line with Strategic Policy SP2, the Council will start an early review of the Local Plan no later than the third anniversary of adoption. Table IM1 sets out, for each policy, how it will be carried out and what will be measured. Examples include housing completions, affordable homes, Biodiversity Net Gain and homes meeting the 110 litres per person per day water standard.