← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / NE1

Policy NE1

Biodiversity, geodiversity and nature recovery

On pages 63 to 65 of the official PDF.

The human version

This policy says development must conserve and, where possible, enhance biodiversity and geodiversity. Proposals must protect designated sites, ancient woodland, priority habitats, watercourses and wildlife corridors. They need ecological information and must follow the mitigation hierarchy, using compensation only as a last resort. Development must meet the national Biodiversity Net Gain requirement, and offsite gains should support the Surrey Local Nature Recovery Strategy. Within the 7km Zone of Influence around the Ashdown Forest SPA, new homes must contribute to mitigation: SANG of at least 8Ha per 1,000 extra population, or a payment towards SANG elsewhere, plus a payment to the SAMM Strategy.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 63

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy NE1: Biodiversity, geodiversity and nature recovery 1. Development must conserve and where possible, enhance biodiversity and geodiversity. 2. Development proposals that may affect an internationally designated site must demonstrate compliance with the relevant Habitats Regulations requirements and avoid adverse effects on site integrity, either alone or in combination with other plans and projects. 3. Development proposals must protect ecological and geological assets and maintain the integrity, connectivity and function of ecological networks and wildlife corridors, having regard to: a. Designated sites of international, national and local importance and other sites identified as being of substantive biodiversity value. b. Ancient woodland, veteran and ancient trees and other irreplaceable habitats. c. Priority habitats and species. d. Watercourses, wetlands and associated habitats. e. Features supporting habitat connectivity and nature recovery. 4. Development must avoid unacceptable direct, indirect and cumulative effects on biodiversity, geodiversity and ecological networks. Ecological assessment and mitigation 5. Development with the potential to affect biodiversity or geodiversity must be supported by proportionate and up-to-date ecological information sufficient to assess impacts and inform mitigation. 6. Development must apply the mitigation hierarchy by avoiding harm wherever possible, then minimising and mitigating impacts, with compensation used only as a last resort where consistent with national policy and legislation. Biodiversity Net Gain 7. Development subject to statutory Biodiversity Net Gain requirements must achieve and secure the applicable biodiversity gain required by national legislation and policy. Biodiversity net gain must be calculated by a nationally accepted metric. 8. Offsite Biodiversity Net Gain proposals should support local nature recovery priorities, including those identified through the Surrey Local Nature Recovery Strategy. 9. Development must not prejudice the biodiversity and nature recovery function of land identified for strategic Biodiversity Net Gain or nature recovery purposes. Nature recovery and long-term management 10. Biodiversity mitigation, compensation, enhancement and Biodiversity Net Gain measures must be supported by appropriate arrangements for long-term management and monitoring. 11. Development should incorporate appropriate biodiversity enhancement measures integrated into building and landscape design, such as swift bricks, bat roost features, bird nesting features, invertebrate habitat features and other measures appropriate to the scale, nature and location of the development. 12. Development contributing to habitat restoration, ecological connectivity and the implementation of the Surrey Local Nature Recovery Strategy will be supported where it accords with other policies of the Plan. Ashdown Forest 13. Within the 7km Zone of Influence around the Ashdown Forest SPA, residential development leading to a net increase in dwellings will be required to contribute to mitigation through: a. The provision of Suitable Alternative Natural Greenspace (SANG) to the minimum level of 8Ha per 1,000 net increase in population, or a financial contribution to SANGs elsewhere supporting comparable levels of greenspace for the net increase in population resulting from the development or the provision of bespoke mitigation. b. A financial contribution to the Ashdown Forest Strategic Access Management and Monitoring (SAMM) Strategy. Alternative provision(s) for mitigation to address the impact of visitors will only be considered where it can be demonstrated that it will be effective in absorbing recreational pressure and preventing additional visitors to Ashdown Forest and deliverable over the lifetime of the development. Proposals for major development within, or adjacent to, the Zone of Influence will be considered on a case-by-case basis in accordance with the requirements of the Habitats directive to determine what, if any, mitigation is required including SAMMs and SANGs. The zone may be subject to revision to take account of new evidence on visitor patterns or monitoring. Any changes will take place through a Supplementary Plan. Green and blue infrastructure 11.21 Green and blue infrastructure is broader than public open space. It comprises the interconnected network of natural and semi-natural spaces and features which supports environmental functions across the district. Individual components range from substantial woodland and accessible greenspace to trees, hedgerows, watercourses, sustainable drainage systems and smaller urban greening features. 11.22 A green or blue infrastructure feature does not need to be publicly accessible to perform an important ecological, landscape, drainage or climate function and development can have green and blue infrastructure requirements even where it does not generate a requirement for formal onsite open space. New development should integrate green and blue infrastructure as an essential component of site planning and design rather than as residual landscaping once the built form has been established. 11.23 Green and blue infrastructure typically includes woodland, trees, hedgerows and field boundaries, rivers, streams, ponds, wetlands and other water environments, biodiversity sites, habitats and ecological networks, parks, recreation grounds, accessible natural green space and amenity spaces, allotments and community growing spaces, churchyards and cemeteries, sustainable drainage systems and other nature- based infrastructure, Public Rights of Way, recreational routes and green active-travel corridors, street trees, verges, green roofs and walls, other urban greening features and other natural or semi-natural spaces and features which contribute to ecological connectivity, landscape character, recreation, climate resilience or access to nature. 11.24 The Local Plan establishes that green and blue infrastructure considerations are to be treated as an integral part of development rather than being dependent solely upon qualitative design considerations. 11.25 Land provided as green and blue infrastructure should perform a meaningful green or blue infrastructure function. This may include retained and enhanced habitats, woodland tree belts, structural landscaping and significant hedgerows, parks and amenity open space, accessible natural green space, habitat creation and ecological corridors, watercourses, wetlands and ponds, multifunctional sustainable drainage features, allotments and community growing spaces where they contribute to the wider green and blue infrastructure network and other substantial green or blue features which provide biodiversity, recreation, climate, landscape or water-management benefits. Small incidental landscaping areas which perform little or no wider green infrastructure function will not normally contribute significantly towards the green and blue infrastructure requirement. 11.26 Brownfield development must incorporate appropriate greening as an integral part of good design. This may include trees, planting, green roofs and walls, sustainable drainage, habitat features, courtyards and other forms of urban greening appropriate to the scale and context of the development. Green roofs, green walls and other forms of urban greening can make an important contribution to green infrastructure provision but should not generally be relied upon as a substitute for functional ground-level green infrastructure where this can reasonably be provided. 11.27 Connectivity is fundamental to an effective green and blue infrastructure network. Development which retains individual features but isolates them from surrounding habitats or open spaces may significantly reduce their function. Site design should consider relationships beyond the development boundary and identify opportunities to connect with ecological networks, open spaces, watercourses and active-travel routes. 11.28 Green and blue infrastructure can provide multiple benefits. Well-designed spaces may simultaneously support biodiversity, recreation, sustainable drainage, active travel, landscape character and climate adaptation. Multifunctionality can make effective use of land but should only be pursued where functions are compatible. Where potential conflicts arise, the design and management of green and blue infrastructure should ensure ecological, landscape and water-management functions are not undermined. 11.29 Existing watercourses, ponds, wetlands and associated habitats should be retained and integrated into development wherever practical. Opportunities should be taken to enhance their ecological, landscape and recreational value and to incorporate sustainable drainage measures as part of a multifunctional green and blue infrastructure network. 11.30 Trees and hedgerows are particularly important elements of the district’s landscape and ecological network. Their retention can provide immediate landscape structure and habitat value which cannot readily be replicated through new planting. New trees should similarly be treated as long-term infrastructure, with sufficient space and appropriate management to enable them to mature successfully. 11.31 Long-term stewardship is necessary if green and blue infrastructure is to continue performing its intended functions. Management and maintenance arrangements should be considered along with the design of development and secured for the lifetime of the development where appropriate.
Flooding & waterHealth, schools & communityNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.