← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge Plan Explorer

Flooding & water

Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.

139 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the water management policies WAT1 to WAT4. It says growth should be resilient to flood risk and climate change and should not overload water resources, drainage or wastewater networks. Development should follow the sequential approach to flood risk, use sustainable drainage and cut demand for potable water. The Plan draws on Level 1 and Level 2 Strategic Flood Risk Assessments and a Water Cycle Study, with any mitigation set out in the Infrastructure Delivery Plan. Applicants should talk to water companies early. The Council will work with the Environment Agency, SES Water, Southern Water, Thames Water and others.

The human version (we wrote this, not the council)This policy requires an integrated approach to water management. Development must show that flood risk, surface water drainage, water supply, wastewater capacity, water quality and the natural water environment have been considered from the start of design. The individual and cumulative effects on the water environment must be assessed. The infrastructure needed for water supply, wastewater, drainage and flood risk must be deliverable at the right stage, and applicants should talk to water companies early. In catchments sensitive to the cumulative effects of development, proposals must not increase flood risk or harm the ecological condition of rivers, and should help improve catchment resilience where appropriate.

Policy WAT2

Flood risk

pp. 54–55

The human version (we wrote this, not the council)This policy directs development to areas at the lowest risk of flooding from all sources, now and in future. The Sequential Test, and the Exception Test where required, must be applied. Where flood risk exists, the most vulnerable uses must go in the lowest risk parts of a site. Development must be safe for its lifetime, allow for climate change, not increase flood risk elsewhere and provide safe access and egress. A proportionate Flood Risk Assessment is needed where required. Schemes next to watercourses must keep an undeveloped buffer, and culverting is only supported where there is no practical alternative. Land for flood management infrastructure must be safeguarded.

The human version (we wrote this, not the council)This policy requires development to include Sustainable Drainage Systems (SuDS) unless they are shown to be inappropriate. Surface water should be managed as close to its source as practical and discharged following the drainage hierarchy. Drainage must not increase flood risk on or off the site, must achieve suitable runoff rates, allow for climate change, handle exceedance flows safely and have long-term maintenance arrangements. Above-ground and nature-based solutions should come first. Major and phased schemes need a coordinated drainage strategy for the whole site. In Groundwater Source Protection Zones, infiltration is only supported where there is no unacceptable risk to groundwater quality.

The human version (we wrote this, not the council)This policy requires development to minimise demand for potable water and use water efficiently. New homes must use no more than 110 litres per person per day, or any replacement national standard. Measures such as rainwater harvesting and greywater recycling are encouraged where suitable. Development must protect the quality of rivers and groundwater, including Groundwater Source Protection Zones, and prevent pollution. Developers must show there is enough water supply, sewerage and wastewater treatment capacity, or that it will be delivered before development starts. Schemes must connect to the public foul sewer where reasonably practical and keep foul and surface water separate. Land for water infrastructure must be safeguarded.

The human version (we wrote this, not the council)This policy says development must conserve and, where possible, enhance biodiversity and geodiversity. Proposals must protect designated sites, ancient woodland, priority habitats, watercourses and wildlife corridors. They need ecological information and must follow the mitigation hierarchy, using compensation only as a last resort. Development must meet the national Biodiversity Net Gain requirement, and offsite gains should support the Surrey Local Nature Recovery Strategy. Within the 7km Zone of Influence around the Ashdown Forest SPA, new homes must contribute to mitigation: SANG of at least 8Ha per 1,000 extra population, or a payment towards SANG elsewhere, plus a payment to the SAMM Strategy.

The human version (we wrote this, not the council)This section is the glossary, which explains terms used in the Local Plan. It defines terms such as deliverable and developable sites, Green Belt and its five purposes, Grey Belt, and major development, which for housing means 10 or more homes or a site of 0.5 hectares or more. It also explains Local Green Space, National Landscapes, previously developed land, Social Rent and windfall sites. Other entries cover housing terms such as self-build and custom-build housing and discounted market sales housing at least 20% below local market value. The glossary ends with contact details for Tandridge District Council in Oxted.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.