← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge plan / WAT2

Policy WAT2

Flood risk

On pages 54 to 55 of the official PDF.

The human version

This policy directs development to areas at the lowest risk of flooding from all sources, now and in future. The Sequential Test, and the Exception Test where required, must be applied. Where flood risk exists, the most vulnerable uses must go in the lowest risk parts of a site. Development must be safe for its lifetime, allow for climate change, not increase flood risk elsewhere and provide safe access and egress. A proportionate Flood Risk Assessment is needed where required. Schemes next to watercourses must keep an undeveloped buffer, and culverting is only supported where there is no practical alternative. Land for flood management infrastructure must be safeguarded.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 54

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy WAT2: Flood risk 1. Development must be directed to areas at the lowest risk of flooding from all sources, taking account of current and future flood risk. The Sequential Test and where required, the Exception Test must be applied in accordance with national policy. 2. Where flood risk is present, development must: a. Apply a sequential approach in the site, locating the most vulnerable development in areas of lowest flood risk. b. Be safe for its lifetime, taking account of climate change and the vulnerability of its people. c. Not increase flood risk elsewhere and where practical, reduce flood risk on and beyond the site. d. Preserve flood storage, overland flow routes and other features which contribute to flood risk management unless suitable mitigation is secured. e. Provide safe access, egress and emergency arrangements where required. Flood risk assessment and mitigation 3. Development must be supported by a proportionate Flood Risk Assessment where required by national policy, relevant evidence or site circumstances. Assessments must consider all sources of flood risk, climate change, residual risk and cumulative impacts. 4. Development should incorporate appropriate flood resilience and resistance measures and maximise opportunities for natural flood management and multifunctional blue-green infrastructure. Watercourses and flood management infrastructure 5. Development adjacent to watercourses must retain an appropriate undeveloped buffer and safeguard their flood management, ecological and maintenance functions. 6. The culverting of watercourses will only be supported where it is demonstrated to be necessary and there is no reasonably practical alternative. 7. Development must safeguard land required for existing or planned flood management infrastructure, flood storage areas or natural flood management measures and must not prejudice their operation or future delivery. Surface water and sustainable urban drainage systems 9.14 Sustainable urban drainage systems (SuDs) are central to the management of surface water. SuDS should mimic natural drainage processes and manage rainfall close to where it falls. Their role extends beyond controlling runoff. Well-designed systems can improve water quality, provide habitat, support biodiversity, enhance landscape and open space, provide urban cooling and contribute to attractive blue-green infrastructure. They must be integrated into the layout of development rather than treated as residual engineering infrastructure. 9.15 The drainage hierarchy prioritises the capture and reuse of rainfall before infiltration or discharge from a site. This approach reduces demand for potable water while reducing the volume of runoff entering watercourses and drainage networks. Care will be required where infiltration is proposed in Groundwater Source Protection Zones or other areas where groundwater is vulnerable to pollution. 9.16 Surface water should be managed as close to its source as practical and development should follow the drainage hierarchy when considering disposal options. Infiltration is generally the preferred approach where ground conditions are suitable and there would be no unacceptable risks to groundwater quality, land stability or other environmental interests. Where infiltration is not appropriate, applicants should demonstrate higher-order options in the hierarchy have been properly considered before reliance is placed on piped systems or sewer networks. 9.17 Surface water management should ensure development does not increase flood risk either onsite or elsewhere. Drainage systems should be designed to accommodate appropriate climate change allowances, manage exceedance flows safely and achieve runoff rates and volumes that are consistent with the requirements of the Lead Local Flood Authority and relevant national and local guidance. Development on previously developed land should seek opportunities to reduce existing runoff rates wherever practical. 9.18 Above-ground and nature-based drainage features are generally preferable to below-ground engineered solutions because they can provide multiple benefits for biodiversity, amenity, water quality, climate resilience and placemaking. SuDS should be integrated with green infrastructure, open space, landscaping and ecological enhancement wherever practical. 9.19 Major and phased developments should be supported by a comprehensive drainage strategy demonstrating how surface water will be managed across the whole site. Drainage proposals should not prejudice the effective drainage of later phases of development or adjoining land and should be designed so they can function as part of an integrated drainage network. 9.20 Effective arrangements for the long-term management, maintenance and funding of drainage infrastructure are essential to ensure systems continue to operate as intended throughout the lifetime of the development. Applicants should demonstrate how drainage features will be maintained and by whom.
Design & placemakingFlooding & waterNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.