Site allocation B5

Brackley, North of Radstone Fields

On pages 191 to 193 of the official PDF.

The human version

This site allocation covers land North of Radstone Fields in Brackley, allocated for residential development. A masterplan agreed by the Council must link the site with the West of Brackley allocation (Policy B4) and with Brackley's existing services, and must accommodate the utility infrastructure crossing the site. Proposals must provide approximately 450 dwellings and mitigate impacts on local and strategic highways. Strategic landscaping to the northwest should fit the development into the landscape and mitigate any sense of coalescence with Halse. Other requirements include walking and cycling encouragement, an open space network, healthcare and transport contributions, and assessments including arboricultural impact.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 191

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy B5 – Brackley, North of Radstone Fields Site B5 is allocated for residential development. A. Proposals for this site must be informed by a Masterplan, agreed by the Council, that demonstrates how the site will come forward comprehensively, and integrated with the allocation (West of Brackley - Policy B4) to the southwest, the existing built form, services and facilities of Brackley, and accommodates the utility infrastructure that traverses the site and is located in proximity to the allocation. B. Proposals for this site will make provision for all of the following: i. Approximately 450 dwellings; ii. Mitigation of any associated impacts on the local and strategic highways networks; iii. Proposals to encourage cycling, wheeling and walking, taking advantage of the availability of active routes in the locality; iv. An appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the Local Plan’s Strategic Transport Assessment (2026); v. Retention and appropriate strengthening of existing site boundary vegetation to provide appropriate screening from the surrounding area; vi. Proposals for strategic landscaping to the northwest of the site to assimilate the development into the landscape and mitigate any sense of coalescence with Halse; vii. An open space network incorporating structural greenspace; viii. Integration with the existing services and facilities provided in Brackley town, including the services and facilities in the recently completed Radstone Fields development; ix. Appropriate funding contributions towards health care infrastructure x. Other necessary provision of, or contributions to, infrastructure as identified in the Development Contributions SPD or successor documents; and xi. Development which is consistent with the diagram shown in figure 25. C. Development of the site will be informed by assessments and suitable mitigation related to: i. Arboricultural impact; ii. Archaeological and heritage impact; iii. Landscape and visual impact; iv. Ecological impact; v. Highways and transport; vi. Flood Risk and water and water recycling infrastructure; vii. Noise and Air Quality, and viii. Crime and disorder. WNLP objectives: 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12, 13 Figure 25: Development principles for Brackley, North of Radstone Fields Brackley, East of Radstone Road 7.5.17. The site lies on the northern edge of Brackley to the east of Radstone Road and comprises part of an agricultural field. 7.5.18. The topography of the site falls from north to south, with a 132kV pylon running across the northerly ridge. National Grid Electricity Distribution has identified a preference for this pylon to be retained in situ. An overground cable additionally traverses the site. 7.5.19. The site falls within a sand and gravel safeguarding area, as defined in the adopted Northamptonshire Minerals and Waste Local Plan. 7.5.20. The western, southern and eastern boundaries are formed of mature trees and hedgerow, which additionally include a small watercourse on the southern and western boundaries. In contrast, the northern extent of the allocation forms a non-defined part of a larger agricultural field. 7.5.21. Beyond the allocation boundary, to the south and west is structural landscaping associated with the recently completed Brackley North SUE; whereas to the east of the site is the disused Helmdon railway, which constitutes part of a Green Infrastructure corridor. Towards the north east of the site, and extending northwards, the Green Infrastructure corridor forms part of the Helmdon Disused Railway Site of Scientific interest. Appropriate mitigation will be required to address development impacts and recreational pressures that may arise on the SSSI. 7.5.22. HS2 is currently being constructed within 1km of the northern extent of the site.
Infrastructure & utilitiesSite allocationsTransport & travel📍 Brackley
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.