The human version (we wrote this, not the council)This section introduces the West Northamptonshire Local Plan. The Plan covers the whole area up to 2043. When adopted, it will replace the West Northamptonshire Joint Core Strategy and the Part 2 Plans for the former council areas. It follows the December 2024 version of the National Planning Policy Framework. Representations can be made from Monday 5 October 2026 until 23.59 on Monday 16 November 2026. The section lists earlier consultations and explains the Regulation 19 stage before independent examination. It says the existing plans run to 2029, and it outlines the Plan's 16 chapters.
OpenConsult / West Northamptonshire Plan Explorer
Site allocations
The specific sites the plan proposes to allocate for development, and what each allocation requires.
288 sections of the plan, in document order.
The human version (we wrote this, not the council)This policy allocates ten regeneration sites in Northampton to support its role as the Principal Urban Area. They will deliver housing, employment, leisure and other uses. A table lists each site and its main use. Examples include 35-45 Abington Street for residential, Cattlemarket Road for residential and hotel, FOUR Waterside for residential, hotel and offices, Greyfriars for residential, Market Walk for leisure, and the Railway Station Car Park and Railfreight for residential. Horizon House, St Peter's Way is listed for offices. St Edmund's Hospital is listed for residential.
The human version (we wrote this, not the council)This policy supports the University of Northampton at its Waterside Campus. The site is safeguarded for education and ancillary uses, and development should improve links with the wider Central Area. The Council will continue to support student accommodation and related uses. Proposals should respond to the riverside setting and green and blue infrastructure, and address flood risk, drainage and utility constraints. A site-specific Flood Risk Assessment is needed, meeting the Upper Nene design standard of a 0.5% probability event plus climate change allowance. Access for maintaining foul drainage infrastructure must be safeguarded.
The human version (we wrote this, not the council)This policy allocates land in Northampton for residential and residential-led development. A table lists 25 sites with indicative capacities, which depend on compliance with other policies. The largest are Land west of A43 at 2,900 homes, Land east of A43 at 1,950, Land East of Wooldale Road at 1,700, North of Buckton Fields at 1,500, and Greyfriars at 1,000. Land North of Newport Pagnell Road is also 1,000. Some sites are re-allocated from the Northampton Part 2 Local Plan or the Joint Core Strategy. Some have more detailed site policies.
The human version (we wrote this, not the council)This policy allocates sites in Northampton for employment use, which must accord with the Development Plan. A table lists the sites with area in hectares and indicative jobs. Sixfields East is 10.18 hectares with 871 jobs. Crow Lane is 2.92 hectares with 94 jobs. Martin's Yard is 1.4 hectares with 194 jobs. Land at Waterside Way is 0.98 hectares with 445 jobs. South of Junction 15, M1 is listed at 68 hectares under policy N23. The supporting text covers strategic distribution, including Northampton Gateway.
The human version (we wrote this, not the council)This site allocation covers the Greyfriars Development Area in Northampton town centre. It requires comprehensive, masterplanned, high density, residential-led mixed-use redevelopment. The Council will support around 1,000 homes, including apartments, houses and purpose-built student accommodation, alongside commercial, retail and leisure uses. Supported elements include a bus and coach interchange, a new town centre park, a linear park and better north to south links to the Market Square. Greyfriars road will be closed or partly closed. Proposals need a flood risk assessment, archaeological assessment and contributions to healthcare and transport.
The human version (we wrote this, not the council)This site allocation covers Northampton Railway Station and Railfreight. Proposals should create a town centre gateway and multimodal transport hub. The station and its facilities are safeguarded for current and future passenger services. A multi-storey car park is supported. Mixed-use development is supported on the station site, with about 280 homes and buildings no higher than nine storeys. On the railfreight site about 362 dwellings are supported, at three to six storeys, on land not needed for rail. Developers must protect the Northampton Castle scheduled monument, provide natural greenspace, carry out ecological and flood risk assessments, and contribute to healthcare and transport.
The human version (we wrote this, not the council)This site allocation covers Hill Farm Rise, Hunsbury Hill in Northampton, allocated for residential development of approximately 80 dwellings. Proposals must follow the diagram in Figure 8. They need an ecological survey and landscape assessment, covering established trees, possible priority grassland and a possible wildlife site. They must be sensitive to the adjoining Local Wildlife Site and keep rail network operational access. Design must reduce noise, particularly from the railway. Other requirements include better links to the Mereway neighbourhood centre, a flood risk assessment, a transport assessment covering the A45 and M1, and contributions to transport and healthcare.
The human version (we wrote this, not the council)This site allocation covers Land east of Wooldale Road in Northampton, allocated for residential development. A masterplan agreed by the Council must show how the site comes forward comprehensively. Proposals must provide approximately 1,700 dwellings, education provision, a local centre, open space, a leisure and sports contribution, and structural greenspace and wildlife corridors. Active travel and public transport are to be prioritised. Healthcare and transport contributions are required. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, including two years of overwintering bird surveys before submission. A site-specific Flood Risk Assessment is needed.
The human version (we wrote this, not the council)This site allocation covers Land north of Newport Pagnell Road in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 1,000 dwellings, education provision, a local centre, open space, a leisure and sports contribution, and structural greenspace and wildlife corridors. Active travel and public transport are to be prioritised, with healthcare and transport contributions. Assessments are required, including highways impact on the A45 and M1. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, with two years of overwintering bird surveys before submission.
The human version (we wrote this, not the council)This site allocation covers land east of the A43 in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 1,950 dwellings, open space and sports provision, education, and a new local centre. They must also provide a mobility hub, green corridors linking to Cowpasture Spinney, and full integration with the Northampton North SUE. Green buffers must keep a clear rural-urban transition and protect villages such as Overstone, Moulton and Sywell. Healthcare and transport contributions are required, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed.
The human version (we wrote this, not the council)This site allocation covers the remaining part of Northampton West, allocated for residential development. A masterplan agreed by the Council is required. Proposals must provide approximately 350 dwellings, open space and sports provision, and structural greenspace and wildlife corridors. These include protecting the 115m contour and a green buffer to Harpole and Harlestone. A mobility hub is required. A Transport Assessment must show safe access and capacity at Roman Road, Upper High Street, New Sandy Lane and the roundabout where Roman Road meets New Sandy Lane. Healthcare and transport contributions are required, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed.
The human version (we wrote this, not the council)This site allocation covers land north of Buckton Fields in Northampton, allocated for residential development. A masterplan agreed by the Council is required. Proposals must provide approximately 1,500 dwellings, education provision, a local centre with retail, community and health uses, and structural greenspace and wildlife corridors. A sustainable and integrated transport network and healthcare contributions are also required. Assessments must cover heritage, including the scheduled monument within the site and the Grade II Registered Park and Garden at Boughton Hall. Others cover ecology, Upper Nene Valley Gravel Pits Special Protection Area impacts, and highways impacts on the A508 Harborough Road, Brampton Lane and the North West Bypass.
The human version (we wrote this, not the council)This site allocation covers land south of Grange Park in Northampton, allocated for residential development. A masterplan agreed by the Council is required. Proposals must provide approximately 850 dwellings, open space, sports and education provision, and a sustainable transport network. They must also provide structural greenspace and wildlife corridors, and address impacts on the Upper Nene Valley Gravel Pits Special Protection Area. Healthcare and transport contributions are required. Heritage and landscape assessments must show that the rural setting of nearby historic villages is preserved, separation between settlements is maintained, and coalescence is avoided. TPO trees, hedgerows and the stream corridor must be kept.
The human version (we wrote this, not the council)This policy supports the extension of the Martin's Yard employment area in Northampton for employment purposes to meet local demand. The extension is restricted to the area shown in Figure 17. A Transport Assessment must test the existing highway and access. Ecological and green infrastructure enhancements and net biodiversity gains are required, given the site lies in the Brampton Valley Arm, immediately south of the Kingsthorpe Local Nature Reserve. A landscape barrier is needed between the employment area and the residual land. Applications need a flood risk assessment, sustainable drainage and improved water quality.
The human version (we wrote this, not the council)This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.
The human version (we wrote this, not the council)This site allocation covers land south of Junction 15 of the M1, allocated for 68 hectares of strategic warehousing. A masterplan covering the whole site must be prepared before any planning application. Two years of overwintering bird surveys are needed, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed. The design must reduce the effect of building scale and massing on local character. A strategic landscape assessment is required, respecting the setting of the Courteenhall registered park and garden. A detailed heritage impact assessment, agreed with Historic England, and a detailed ecological assessment are also required.
The human version (we wrote this, not the council)This section introduces the Daventry chapter. Daventry grew from about 4,000 people in 1950 to around 28,000 in 2021 after being used for overspill development from Birmingham. The chapter describes regeneration schemes such as the Abbey Retail Park, the iCon building and the Arc cinema, and green features such as the Country Park and Borough Hill. It covers housing, including 450 homes under construction at Micklewell Park and 4,000 homes allocated at Daventry North East. A 2022 study found town centre vacancy of 13.1%, below the national average of 14.1%. The strategy supports continued growth.
The human version (we wrote this, not the council)This site allocation covers the Micklewell Park Extension in Daventry, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery and full integration with the site to the south, which has permission and is under construction. Proposals must provide approximately 430 dwellings. They must keep the Green Wedge to the north and east and protect the Grand Union Canal Conservation Area and its setting. Provision is needed for public transport, walking, cycling and wheeling. Contributions are required for leisure and sports facilities and healthcare. Assessments must cover heritage, landscape, ecology, highways, flood risk, noise and air quality.
The human version (we wrote this, not the council)This site allocation sets out how land north of Middlemore in Daventry is allocated for residential development. Proposals must follow a masterplan agreed by the Council. They must provide approximately 720 dwellings. They must keep the route of the Braunston Tunnel as a green heritage corridor with a footpath and the ventilation shafts. Other requirements include greenspace and wildlife corridors, links to Middlemore, Micklewell Park and the Heartlands employment area, walking and cycling routes, open space, community facilities, and contributions to leisure, healthcare and transport. Assessments are needed on heritage, landscape, ecology, highways, flood risk, noise, air quality and other topics.
The human version (we wrote this, not the council)This site allocation re-allocates Daventry North East for residential development. Proposals must provide approximately 3400 dwellings. They need a masterplan agreed by the Council. They must also provide education, a local centre with community facilities and local employment, an open space network, and an extension to Daventry Country Park under policy D10. They need sustainable transport links to the town centre, Southbrook and Long Buckby Railway Station, towpath access with a contribution to the surface, and healthcare funding.
The human version (we wrote this, not the council)This site allocation covers land north and west of Daventry town centre. The eastern part, north of Eastern Way, is protected as Local Green Space, although parking and sport and play space may be provided there for Daventry Hill School. The western part is allocated for mixed uses: residential, office, hotel, leisure, restaurant or pub, and health. A masterplan agreed by the Council is required. Proposals must provide pedestrian and cycle links to the town centre, buildings that suit key views, quality public space to develop the area's tourism potential, and contributions to transport and healthcare. Assessments cover heritage, landscape, ecology, highways, flood risk, noise, crime and contamination.
The human version (we wrote this, not the council)This site allocation covers land off Newnham Drive, Daventry, for E(g), B2 or B8 uses. Proposals should design the layout so that neighbouring residents do not suffer adverse amenity impacts. They should relate well to the existing employment area and provide walking and cycling links to the rest of that area and to the neighbouring homes. They should make an appropriate contribution towards off site sustainable transport and highways mitigation, set out any water and water recycling mitigation and phasing needed, and comply with the Northamptonshire Minerals and Waste Local Plan.
The human version (we wrote this, not the council)This site allocation covers the former Council offices on Lodge Road, Daventry. Proposals to use the offices for town centre uses are encouraged. Re-use or redevelopment should make the best use of land while responding sensitively to the nearby Grade I listed Church of the Holy Cross. It should also respond positively to level changes and surrounding buildings, and keep mature landscaping along Eastern Way where possible. Development must be informed by assessments and mitigation covering archaeology and heritage, ecology, highways and transport, flood risk and water recycling, noise and air quality, and crime and disorder.
The human version (we wrote this, not the council)This site allocation covers the South East Gateway in Daventry, for E(g), B2 or B8 uses. A masterplan agreed by the Council is required. Proposals must provide a mix of unit sizes not exceeding 10,000 sq m, high quality design and an enhanced gateway into the town along the A45. They must respond to nearby heritage, including the Burnt Walls and Borough Hill Scheduled Monuments, and keep the area shown as a heritage buffer open in perpetuity. An archaeological desk based assessment is needed. Walking and cycling links to the Marches employment area and neighbouring homes, transport contributions and water infrastructure details are also required.
The human version (we wrote this, not the council)This site allocation supports proposals that enhance Daventry Country Park's recreation, leisure, health and wellbeing and cultural assets, as long as they protect, manage or enhance important habitats and heritage assets. Daventry North East (Policy D5) is expected to provide an extension to the Country Park and a link between the Grand Union Canal and the town centre. This should include linked green and blue space, nature recovery measures, a linear park with footpath and cycleway connections, and chances for recreation. Nearby development should preserve or enhance the setting of the Daventry Reservoir Conservation Area and the Grand Union Canal Conservation Area.
The human version (we wrote this, not the council)This policy supports measures that promote walking, cycling and wheeling in and around Brackley. This includes links within the settlement confines and between Brackley and surrounding rural settlements and employment areas. Priority is given to the measures identified in the most recent Brackley Local Cycling and Walking Infrastructure Plan. Existing active travel links will be retained and, where possible, improved and enhanced. Opportunities to enhance, promote and improve public transport links will also be supported.
The human version (we wrote this, not the council)This site allocation covers land at Brackley East, allocated for residential development. Proposals must provide approximately 350 dwellings and the realignment of Turweston Road. Other requirements include infrastructure provision or contributions, healthcare funding, improved public transport, a contribution to off site sustainable transport and highways mitigation, and a landscape buffer and noise mitigation to the A43. Archaeological and ecological assessments are needed, including for the Brackley Railway Embankment County Wildlife Site. The design must respect the Great Ouse landscape character area. Proposals must also manage flood risk, enhance green infrastructure and provide safe routes for pedestrians, cyclists and wheelers.
The human version (we wrote this, not the council)This site allocation covers land West of Brackley, allocated for residential development. A masterplan agreed by the Council must show how the site comes forward comprehensively and links with the neighbouring allocation, Policy B5. Proposals must provide approximately 700 dwellings, be designed to accommodate bus services, and encourage cycling, wheeling and walking. They must keep and strengthen boundary vegetation, keep Public Right of Way VA19, and provide an open space network. Mitigation is needed for impacts on the Local Wildlife Site. Provision includes more pitches at Brackley rugby club, healthcare and transport contributions, and development consistent with figure 24.
The human version (we wrote this, not the council)This site allocation covers land North of Radstone Fields in Brackley, allocated for residential development. A masterplan agreed by the Council must link the site with the West of Brackley allocation (Policy B4) and with Brackley's existing services, and must accommodate the utility infrastructure crossing the site. Proposals must provide approximately 450 dwellings and mitigate impacts on local and strategic highways. Strategic landscaping to the northwest should fit the development into the landscape and mitigate any sense of coalescence with Halse. Other requirements include walking and cycling encouragement, an open space network, healthcare and transport contributions, and assessments including arboricultural impact.