This section explains the case for growth at Long Buckby Station, on the Northampton Loop line of the West Coast Main Line. A new settlement of 1,280 to 5,000 homes was considered in 2021 but not taken forward in 2024. Higher housing need has since led to this location being identified. The Local Transport Plan, adopted March 2025, lists station improvements and platform lengthening by 2030. Growth will provide approximately 1,000 homes and about four hectares of employment land by Three Bridges Road. Part of the site is in a Mineral Safeguarding Area, and a more detailed archaeological desk based assessment is recommended.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Chapter 9: Making Great Places – Growth at Long Buckby Station
9.1. Introduction
9.1.1. Long Buckby Station is located on the Northampton Loop line of the West Coast
Main Line.
9.1.2. It currently provides a half hourly daytime service southward to Northampton,
Milton Keynes and London Euston and northwards to Coventry and Birmingham.
Services are more frequent during the peaks.
9.1.3. The Options consultation published in 2021 considered a new settlement at Long
Buckby with a capacity of between 1,280 and 5,000 homes. This option wasn’t
taken forward into the 2024 Regulation 18 plan because all of the additional
housing growth, then required, could be met at Northampton. With the increased
housing need outlined elsewhere in this plan, additional sustainable locations have
been identified to meet the need, including Long Buckby Station.
9.1.4. The station would benefit from investment to improve the offer as outlined in the
Council’s Local Transport Plan (LTP). Growth in this location provides an
opportunity to provide homes in a sustainable location, increase patronage at this
station and provide funding to contribute to the improvements needed at this
station.
9.1.5. Growth also provides the opportunity to further improve opportunities for active
travel between Daventry and Long Buckby Station.
9.1.6. Government policy supports proposals of this type. Paragraph 115 of the NPPF
states that ‘in assessing sites that may be allocated for development in plans, it
should be ensured that sustainable transport modes are prioritised...’. In November
2025 the Government announced its intentions to promote housebuilding around
railway stations.
9.2. Local Transport Plan and supporting documents
9.2.1. The Local Transport Plan (LTP) adopted by the Council in March 2025 includes a
programme of planned interventions to help deliver the objectives of the plan. For
Long Buckby, it identifies improvements
1 and platform lengthening as a short-term
action (by 2030) and speed and capacity improvements to the loop line by 2040.
9.2.2. The LTP also states that the council will advocate for more West Coast Main Line
train services to serve Northampton and Long Buckby to encourage more people
to consider rail as an alternative to the car where appropriate2.
9.2.3. Regarding bus transport, the plan identifies proposals for an enhanced service
1 Table 4-3 on page 39 of the West Northamptonshire Local Transport Plan 2025 to 2045
2 Component policy measures PO5b on page 51 of the Local Transport Plan 2025 to 2045
(frequency and operating hours) between Daventry and the West Coast mainline. 3
9.2.4. The LTP also identifies support for integrated bus and rail ticketing and
timetables4.
9.2.5. The Council’s Rail Action Plan, Mobility Hub Action Plan, and Active Travel Strategy
(June 2026) provides further support to the LTP.
9.2.6. As noted in the transport chapter, the plan is supported by a transport assessment
and Infrastructure Delivery Plan which have assessed the implications of the
proposals in the plan, and any mitigation that may be required.
9.2.7. These consider the opportunity to improve connectivity between parts of Long
Buckby and Daventry North East with the help of the Grand Union Canal towpath.
9.3. Growth at Long Buckby Station
9.3.1. Growth at Long Buckby Station will provide for approximately 1,000 homes and
about four hectares of employment land adjacent to the existing employment
area west of Three Bridges Road.
9.3.2. The development will meet some of its own infrastructure needs but will also
help to sustain the existing facilities in Long Buckby Village.
9.3.3. Further assessment will be required of the transport impacts of the development
including the access along Three Bridges Road.
9.3.4. Given the sustainability of this location, there may be opportunities to extend this
growth location in future local plans. Part of the site is within a Mineral
Safeguarding Area (MSA) under Policy 28 of the Minerals and Waste Local Plan.
Future development will need to demonstrate compliance with MWLP Policy 28
to ensure mineral deposits within MSAs are prevented from sterilisation by
incompatible non-mineral development.
9.3.5. A high level heritage impact assessment (HIA) for the site reviewed existing
historic environment evidence in order to assess the potential effects that could
arise from the allocation. Due to the archaeological potential of the site, the HIA
recommended that a more detailed desk based assessment is undertaken. This
will identify the nature of the archaeological resource, the need for any
additional investigation work and will inform an appropriate mitigation strategy.
All works should be agreed in advance with the Planning Archaeologists.
3 WNCLTPLL018 on page 131 of the Local Transport Plan 2025 to 2045
4 WNCLTPL L0096 on page 133 of the Local Transport Plan 2025 to 2045