The human version (we wrote this, not the council)This section explains the spatial strategy for West Northamptonshire. The main focus is regeneration of existing towns and use of previously developed land, with relatively limited growth on the edge of Northampton. The Council appraised eight broad spatial options. The two regeneration-focused options scored most favourably, though not all housing needs can be met within urban areas. The settlement hierarchy keeps Northampton as the Principal Urban Area, Daventry as the Sub Regional Centre, and Brackley and Towcester as Rural Service Centres. It also covers growth at Long Buckby Station and a hierarchy of rural villages.
OpenConsult / West Northamptonshire Plan Explorer
Homes & housing
How many new homes are planned, where they go, affordable housing requirements, housing mix, density and homes for older people.
295 sections of the plan, in document order.
The human version (we wrote this, not the council)This policy sets out where housing and economic development will go. Most will be in the Principal Urban Area of Northampton, mainly through regeneration of previously developed land, with limited peripheral growth. Daventry will see development of a lesser scale. Brackley and Towcester will rely on existing planned growth, regeneration and further planned peripheral growth. Growth at Long Buckby Station will use sustainable travel links to Daventry. Rural areas will have limited planned development, mostly through neighbourhood plans. Strategic employment growth will be on allocated sites along the M1 corridor. Priority goes to the most sustainable locations and to regeneration.
The human version (we wrote this, not the council)This policy requires high-quality, distinctive and inclusive places. Proposals must show how they meet the characteristics of well-designed places in the National Design Guide, with a Design and Access Statement where required. It sets requirements on context, identity, built form, movement, nature, public spaces, mixed uses, homes and buildings, resources and lifespan. All development must protect the amenity of existing and future occupiers, including privacy, daylight and avoiding overlooking. Backland and garden development is supported only where it does not harm character or neighbouring amenity. Development on contaminated land must include remediation.
The human version (we wrote this, not the council)This section introduces the Daventry chapter. Daventry grew from about 4,000 people in 1950 to around 28,000 in 2021 after being used for overspill development from Birmingham. The chapter describes regeneration schemes such as the Abbey Retail Park, the iCon building and the Arc cinema, and green features such as the Country Park and Borough Hill. It covers housing, including 450 homes under construction at Micklewell Park and 4,000 homes allocated at Daventry North East. A 2022 study found town centre vacancy of 13.1%, below the national average of 14.1%. The strategy supports continued growth.
The human version (we wrote this, not the council)This policy supports connectivity and active travel in Daventry. Measures to promote walking, cycling and wheeling will be supported, including links between the town centre, employment areas, services and homes, and links between Daventry and surrounding villages and Long Buckby Station. Active travel to the town centre, the country park and secondary schools is supported, with priority to routes in the latest LCWIP. Proposals that make best use of waterways and disused railway lines are supported. Where practical, proposals should include electric vehicle charging. The policy also supports public transport improvements, including regenerating Daventry bus station.
The human version (we wrote this, not the council)This section introduces Brackley, a historic market town of about 16,200 people close to the A43, M1 and M40. It notes that 1,717 homes were built in the town up to 31 March 2026, an average of 114 a year. Brackley North, which provided for up to 1,380 dwellings, was completed in 2023. The 9.5ha of employment land at Brackley East has been built and is occupied. The Brackley Business District is the focus for new employment. The town centre had a vacancy level of 10.9% in 2022, against a national average of 14.1%. The strategy supports continued growth in line with the town's role in the settlement hierarchy.
The human version (we wrote this, not the council)This policy supports measures that promote walking, cycling and wheeling in and around Brackley. This includes links within the settlement confines and between Brackley and surrounding rural settlements and employment areas. Priority is given to the measures identified in the most recent Brackley Local Cycling and Walking Infrastructure Plan. Existing active travel links will be retained and, where possible, improved and enhanced. Opportunities to enhance, promote and improve public transport links will also be supported.
The human version (we wrote this, not the council)This section introduces Towcester, a market town with a population of around 11,500 (census 2021), nearly 30% growth over 20 years. It sits at the crossroads of the A5 and A43, close to the M1 and M40. The town has built 2,311 homes up to 31 March 2026, an average of approximately 154 a year. Wood Burcote Court was completed in 2024. At Towcester Vale, reserved matters consent covers 2,116 dwellings, with 1,389 completed. The town centre vacancy level of 9% in 2022 is below the national average of 14.1%. The strategy supports continued growth in line with the town's role in the settlement hierarchy.
The human version (we wrote this, not the council)This policy supports National Highways improvements to the A5 corridor through Towcester. It also supports measures that promote walking, cycling and wheeling, including links within the settlement confines and between Towcester and surrounding rural settlements and employment areas. Priority is given to the measures identified in the most recent Towcester Local Cycling and Walking Infrastructure Plan. Existing active travel links will be retained and, where possible, improved and enhanced. Opportunities to enhance, promote and improve public transport links will also be supported.
The human version (we wrote this, not the council)This section explains the case for growth at Long Buckby Station, on the Northampton Loop line of the West Coast Main Line. A new settlement of 1,280 to 5,000 homes was considered in 2021 but not taken forward in 2024. Higher housing need has since led to this location being identified. The Local Transport Plan, adopted March 2025, lists station improvements and platform lengthening by 2030. Growth will provide approximately 1,000 homes and about four hectares of employment land by Three Bridges Road. Part of the site is in a Mineral Safeguarding Area, and a more detailed archaeological desk based assessment is recommended.
The human version (we wrote this, not the council)This section sets out the approach to rural areas, which are home to around a third of the area's population. It keeps the three tier rural settlement hierarchy from the WNJCS: Primary Service Villages, Secondary Service Villages and Other Villages, plus Small Settlements and Hamlets. Villages were scored on services, facilities and public transport, then reviewed. Development is directed to settlement confines, and a single confines method now applies across West Northamptonshire. Development outside the confines is allowed only in prescribed cases, such as a lack of a five year housing land supply, a Housing Delivery Test result below 75%, or a single self-build plot with a local connection.
The human version (we wrote this, not the council)This policy names the Primary Service Villages: Brixworth, Bugbrooke, Crick, Deanshanger, Long Buckby, Middleton Cheney, Roade, Weedon and Woodford Halse. Development should be within the village confines. Outside the confines, it is acceptable only if the site adjoins the confines and meets one of several tests, such as a housing land supply below five years, a rural exception site, a local needs site, economic development, or a single self-build plot with a local connection. All development must be of appropriate scale, avoid losing services, protect village character and open land, be walkable to services and protect residents' amenity. Neighbourhood plan development is also supported.
The human version (we wrote this, not the council)This policy names the Secondary Service Villages, including Badby, Barby, Braunston, Silverstone and Yelvertoft, among those listed. Development should be within the village confines. Outside the confines, it is acceptable only if the site adjoins the confines and meets one of several tests, such as a housing land supply below five years, a rural exception site, a local needs site, economic development, or a single self-build plot with a local connection. All development must be of appropriate scale, avoid losing services, protect village character and open land, be accessible on foot or by bike to services, and protect residents' amenity. Neighbourhood plan development is also supported.
The human version (we wrote this, not the council)This policy recognises the intrinsic character, beauty and tranquillity of the open countryside. Only listed forms of development are supported there. These include development essential to a rural business meeting Policy HO12, replacement of an existing building of similar size and use, agricultural development, and individual isolated dwellings of exceptional design quality. They also include optimal viable use of a heritage asset, reuse of redundant historic buildings, and conversion of traditional buildings that need no rebuilding. Extensions, essential infrastructure, rural economy development under Policy EC3, overnight lorry parking, rural exception and local needs sites, and Gypsy and Traveller sites that accord with Policy HO11 are also listed.
The human version (we wrote this, not the council)This policy sets minimum housing figures for rural parishes. Sites will be identified within or immediately adjoining village confines, through neighbourhood development plans or a development plan document. If draft neighbourhood plans making provision for the minimum numbers have not made demonstrable progress within two years of the Plan's adoption, the Council will allocate sites in a development plan document. Progress is then reviewed annually. A table gives a figure for each parish, for example Brixworth 211, Woodford cum Membris 162, Middleton Cheney 161, Deanshanger 147 and Roade 136. Boughton, Hackleton, Harpole and Long Buckby have a figure of 0.
The human version (we wrote this, not the council)This policy sets the housing requirement for West Northamptonshire for the plan period 2026 to 2043 at 42,704 homes. The plan will also provide an additional 5% to ensure choice and competition in the market for land. These homes will be delivered through allocations made in this Plan, other policies in this Plan that provide for new homes, existing commitments, and allocations in Neighbourhood Development Plans.
The human version (we wrote this, not the council)This section introduces the Homes chapter and the scale of housing the Plan must provide. Using the national Local Housing Need method, West Northamptonshire needs 2,512 dwellings per annum, making 42,704 in total. This is approximately 26% higher than average completions over the last five years. Adding the 5% buffer required by NPPF paragraph 78 gives a total of 44,839 homes over the Plan period 2026 to 2043. Most supply already comes from existing commitments, such as allocations in existing plans, planning permissions and neighbourhood plan allocations, with a windfall allowance. Further detail is in the Homes Background Paper, and a trajectory is at Appendix D.
The human version (we wrote this, not the council)This policy sets affordable housing requirements for sites of 10 or more dwellings. The rate is 10% in the Northampton and Daventry urban areas and 35% in the Towcester and Brackley urban areas and rural areas. Lower levels are acceptable only where evidence of viability or other constraints is agreed, and developments over 500 units should include an upward only review clause. Homes should be provided on site, designed to be indistinguishable from market homes, and owned and managed by a registered provider. They must stay affordable in perpetuity. The policy also supports community led schemes backed by a local housing needs survey.
The human version (we wrote this, not the council)This policy supports Build to Rent schemes in Northampton, and in other places where an identified need is shown. Applicants must show that all units are self-contained and let separately, and that at least 20% of dwellings are affordable private rent. Those homes must be offered at a minimum 20% discount to local market rents in perpetuity, and be broadly representative of the overall mix. Units must be in single ownership with a professional on-site management scheme. The homes must stay as build to rent for at least 15 years. A planning condition will require tenancies of 3 or more years to be offered.
The human version (we wrote this, not the council)This policy supports affordable housing on rural exception sites at Primary Service Villages, Secondary Service Villages and Other Villages, if they are of suitable scale, design and tenure. The number of homes must be justified by an up-to-date local housing needs survey or assessment, and must not exceed the need. Affordable housing must be the larger share, with any market housing the minimum needed for viability. A local connection test applies under the current West Northamptonshire Housing Allocation Policy. The site must immediately adjoin the confines of a rural settlement. Affordable homes must stay available and affordable in perpetuity for people in local housing need.
The human version (we wrote this, not the council)This policy supports development outside the confines at Primary Service Villages, Secondary Service Villages and Other Villages where it clearly meets a local housing need shown by an up-to-date housing needs survey or assessment. The site must immediately adjoin the confines, and the mix, type and tenure must precisely meet the identified need. Social rent, affordable rent and shared ownership homes must stay affordable in perpetuity. Local market homes need a marketing plan, with continuous marketing for a minimum of 12 weeks for first sales and six weeks for later sales. They may go to the open market only if no buyers are found.
The human version (we wrote this, not the council)This policy expects new homes to provide a mix of sizes, types and tenures to meet local needs. Developments of 10 or more dwellings should seek the target mix in a table, for example market homes of 5% one bedroom, 30% two bedrooms, 45% three bedrooms and 20% with four or more. Other mixes are acceptable if backed by more up-to-date local evidence. Developments of 500 or more dwellings should provide a range of specialist housing types. The Council supports housing for older people and for groups such as people with disabilities and care leavers, if it meets an identified need and is well located.
The human version (we wrote this, not the council)This policy sets standards for new homes. 5% of new homes must meet Building Regulations Part M4(2). Where the Council allocates or nominates occupants, 10% of homes must meet M4(3)(2)(b), and 5% of all new market dwellings must meet M4(3)(2)(a). These are applied across the housing mix, and may be waived where robust evidence shows a site is unsuitable, for example because of flooding or topography. The internal floor area and storage of all new build homes must meet National Space Standards. All new homes must comply with a water efficiency limit of 110 litres per person per day.
The human version (we wrote this, not the council)This policy covers self-build and custom build homes. On sites of more than 100 dwellings, 5% of plots should be provided as serviced plots. Plots left vacant 12 months after roads and utilities are installed can revert to other housing if marketing shows no interest. Serviced plots are also supported on other allocated or windfall sites, unless supply would exceed demand. Single self-build plots immediately adjoining the confines of Primary, Secondary and Other Villages are supported where a local connection is shown and the first occupant is the applicant. Outline applications for more than one dwelling need a design code covering listed matters.
The human version (we wrote this, not the council)This policy accepts accommodation for a rural worker where there is an essential need for the dwelling to ensure the function of the rural business. All listed criteria must be met: the need cannot be met in an existing settlement, dwelling or converted building; the scale matches the need; the activity is financially viable and well established; the siting, access and servicing suit the need; and the dwelling relates well to existing rural buildings or the countryside. Temporary accommodation for new rural enterprises is acceptable where there is essential need, so that long term financial sustainability can be assessed once the business is well established.
The human version (we wrote this, not the council)This policy covers cases where a developer says a proposal is unviable after meeting the Plan's policies. The Council requires evidence at application stage, including an independent viability assessment on terms it agrees and funded by the developer, using an open book approach. Where viability constraints are shown, the Council may prioritise contributions for essential infrastructure, then affordable housing, then other infrastructure. It may defer part of the contributions to a later date. It may also refuse permission if the development would be unsustainable without the unfunded infrastructure or affordable housing.
The human version (we wrote this, not the council)This section sets out how the Local Plan will be implemented and monitored. It lists what the Council must publish, including progress on plans, policies not being implemented, housing delivery, neighbourhood plans, Community Infrastructure Levy spending and duty to cooperate action. An annual Authority Monitoring Report will assess whether objectives are being met. The framework uses quantitative and qualitative indicators and links objectives, policies, indicators, targets, data sources, frequency, trigger points and responses. Tables cover themes such as spatial strategy, employment, infrastructure and viability. The Council now reports one housing land supply figure for West Northamptonshire.
The human version (we wrote this, not the council)This section is the glossary of terms in the Plan, set out as a table of terms and descriptions in alphabetical order. It defines planning terms such as accessible homes, active travel, affordable housing, Air Quality Management Area, Article 4 Direction, amenity green space, ancient woodland, biodiversity, Brownfield Land Register and build to rent. For example, active travel is making journeys in physically active ways like walking, wheeling, cycling or scootering. Ancient woodland is an area wooded continuously since at least 1600 AD.
The human version (we wrote this, not the council)This section lists the strategic policies of the Plan for the purposes of neighbourhood plans, grouped by chapter. They include the spatial strategy SP1, placemaking policies PL1, PL6 and PL7, the spatial strategies for Northampton, Daventry, Brackley and Towcester, and growth at Long Buckby, and rural policies R1 to R6. Homes policies HO1, HO7 and HO11 are listed. From the economic chapter it lists EC1 and EC2. From the environment chapter it lists EN1, EN6, EN7, EN9 and EN10. TR1, TR2 and IN1 complete the list.
The human version (we wrote this, not the council)This section is the housing trajectory, a set of tables showing expected new homes in each year from 2026/27 to 2042/43. The requirement is 2,512 homes a year, 42,704 in total, or 2,638 a year with the 5% buffer. Total expected supply over the plan period is 44,779 homes, against a cumulative requirement with the buffer of 44,839, a shortfall of 60 by the end of the period. Supply falls short in the early and late years and exceeds the requirement in the middle years. Further tables break the supply down by site for each area, starting with Northampton.