← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / D3

Site allocation D3

Daventry, Micklewell Park Extension

On pages 166 to 168 of the official PDF.

The human version

This site allocation covers the Micklewell Park Extension in Daventry, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery and full integration with the site to the south, which has permission and is under construction. Proposals must provide approximately 430 dwellings. They must keep the Green Wedge to the north and east and protect the Grand Union Canal Conservation Area and its setting. Provision is needed for public transport, walking, cycling and wheeling. Contributions are required for leisure and sports facilities and healthcare. Assessments must cover heritage, landscape, ecology, highways, flood risk, noise and air quality.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 166

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy D3 – Daventry, Micklewell Park Extension Site D3 is allocated for residential development. A. Proposals for this site must be informed by a Masterplan, agreed by the Council, that must demonstrate how the site will come forward comprehensively, and fully integrated with the site to the south which has extant planning permission and is under construction. B. Proposals for this site will make provision for all of the following; i. Approximately 430 dwellings; ii. Structural greenspace and wildlife corridors which protect and enhance the Grand Union Canal Conservation Area and its setting, and include appropriate landscape enhancements to mitigate the impact on the setting of Welton village and the Green Wedge; iii. Retention of the area of Green Wedge to the north and east of the site; iv. Necessary provision of or contributions to infrastructure including off-site contributions to leisure/sports facilities in the Daventry area; v. Provision for public transport; vi. Proposals to encourage walking, cycling and wheeling, taking advantage of the availability of active travel routes in the locality; vii. Appropriate funding contributions towards healthcare infrastructure provision; and viii. Development which is consistent with the diagram shown in figure 20 C. Development of the site will be informed by assessments and suitable mitigation related to: i. Archaeological and heritage impact; ii. Landscape and visual impact; iii. Ecological impact; iv. Highways and transport; v. Flood Risk and water and water recycling infrastructure; vi. Noise and Air Quality; vii. Crime and disorder; and viii. Minerals and waste. WNLP objectives: 1, 2, 3, 4, 5, 7, 8, 9, 10, 12, 13 Figure 20: Development principles for Daventry, Micklewell Park Daventry, North of Middlemore 6.5.6 The site is located north of Daventry town, the existing Middlemore residential area lies immediately to the south, to the east are the A361 and Micklewell Park development which is currently being built out. The site is predominantly agricultural land and contains well defined field boundaries, areas of woodland along its northern boundary and a sloping topography towards Braunston. To the west of the site is the Daventry to Braunston footpath and cycleway which runs alongside the disused railway line. An area of Green Wedge is located to the west and south west of the site. 6.5.7 A particular feature of the site is the Braunston Tunnel which forms part of the Grand Union Canal Conservation Area and is visible as a hedgerow lined track and two airshafts running east-west through the site, the west entrance to the tunnel is Grade II listed and outside the site boundary. The route of the Grand Union Canal Conservation Area should be retained as a green infrastructure heritage corridor as part of the development. This corridor should incorporate a footpath to link the tunnel portals and facilitate access to the towpath. The tunnel ventilation shafts are an integral part of the canal landscape and should be sensitively enhanced as part of the corridor treatment. The western end of the corridor should be retained as green space to preserve the rural character of the conservation area. 6.5.8 A high level HIA for the site reviewed existing historic environment evidence in order to assess the potential effects that could arise from the allocation. Due to the presence of the Braunston Tunnel, airshafts and archaeological potential within the site and proximity to a number of listed buildings, the HIA recommends that a more detailed archaeological desk based assessment is undertaken. This will identify the nature of the archaeological resource, the need for any additional investigation work and will inform an appropriate mitigation strategy. All programmes of work should be agreed in advance with the Planning Archaeologists and Historic England. 6.5.9 The site’s location adjoining Daventry means that access exists to a wide range of services, facilities and employment opportunities. The relationship with the existing urban area and the presence of the Grand Union Canal needs to be carefully considered and proposals will need to be informed by a masterplan, that will demonstrate how the site can come forward comprehensively. This includes structural greenspace and wildlife corridors which retain important existing heritage and landscape features including the Braunston Tunnel, hedgerows, woodlands, mature trees and drainage corridors. Landscape enhancements will be required to be in keeping with the landscape character type and should take topography into account. 6.5.10 The Grand Union Canal Transfer Project proposes to transfer water from the Midlands to the South East. The project would utilise existing canal infrastructure around Daventry. The project will be a Nationally Significant Infrastructure Project (NSIP) and the Development Consent Order is expected to be submitted in summer 2027. If it is approved, implications for this site will need to be addressed. 6.5.11 The masterplan will need to address the relationship and linkages of the development with Middlemore, Micklewell Park and Heartlands, including provision of active travel links and vehicular access from the A361.
Heritage & characterSite allocationsTransport & travel📍 Braunston📍 Daventry📍 Micklewell Park📍 Middlemore
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.