Site allocation D8

Daventry, Land off Newnham Drive

On pages 176 to 179 of the official PDF.

The human version

This site allocation covers land off Newnham Drive, Daventry, for E(g), B2 or B8 uses. Proposals should design the layout so that neighbouring residents do not suffer adverse amenity impacts. They should relate well to the existing employment area and provide walking and cycling links to the rest of that area and to the neighbouring homes. They should make an appropriate contribution towards off site sustainable transport and highways mitigation, set out any water and water recycling mitigation and phasing needed, and comply with the Northamptonshire Minerals and Waste Local Plan.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 176

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy D8 – Daventry, Land off Newnham Drive Site D8 is allocated for E(g), B2 or B8 uses. A. Proposals for this site should: i. Optimise the design and layout to ensure that development does not result in adverse amenity impacts on neighbouring residents; ii. Relate well to the existing employment area; iii. Provide walking and cycling links from the site to the remainder of the employment area and the neighbouring residential area; iv. Provide an appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the local plan’s Strategic Transport Assessment (2026); v. Set out further details of any required mitigation relating to water and water recycling infrastructure and any necessary phasing arrangements; and vi. Comply with the Northamptonshire Minerals and Waste Local Plan. WNLP objectives: 1, 2, 5, 7, 8, 9, 13, 14 Daventry, South East Gateway 6.6.11. The Daventry South East Gateway site is a priority for regeneration. The Gateway sites are located north and south of the A45 (London Road) to the south east of the town in a prominent gateway location. It is brownfield and greenfield land and currently features a mixture of uses which, whilst serving important functions in their own right, do not portray an attractive, welcoming arrival point into Daventry. This area therefore provides an opportunity to improve this important, strategic gateway to Daventry town to create a high quality environment and support the regeneration of the town. 6.6.12. The South East Gateway will provide a mix of unit sizes not exceeding 10,000 sq m to encourage a range of unit sizes and types to support the supply of local industrial units. This approach is supported by the HENA 2025 which states that it would be reasonable to seek a supply of non-strategic units at each settlement. The site comprises a number of parcels and it is important that development is informed by a masterplan to ensure it comes forward comprehensively. The site will incorporate high quality design to optimise the layout of the site and enhance the gateway into the town. Walking and cycling links to the adjacent Marches employment area and nearby residential areas will also be provided. 6.6.13. There are a number of heritage assets within and close to the site. The northern part of the site adjoins the Burnt Walls Scheduled Monument which is a fortified enclosure. The Scheduled Monument is of high heritage interest, and its wider setting includes Borough Hill Scheduled Monument, which lies outside the site to the north. The non-designated John of Gaunts Castle is in the southern part of the site and the non-designated historic farmstead, Daventry Wood Farm, is adjacent to the southern part of the site. 6.6.14. Burnt Walls was historically set within an open agrarian landscape and the scheduled monument derives considerable significance from its relationship with its hinterland. Land north and east of the monument still provides an open rural landscape setting. The setting to the west has been altered by urbanisation as Daventry has grown, however, the immediate setting remains open and connects Burnt Walls to the historic route way (the modern A45), which makes it important to the scheduled monument’s significance and is sensitive to change. The open land immediately west of Burnt Walls is shown as a heritage buffer within the Daventry South East Gateway allocation. Borough Hill, which is also a Scheduled Monument and Newnham Hill flank the site and form an important part of the setting of the town. The western part of the site has previously been quarried, however, there is potential for archaeological remains to be present in the remainder of the site. 6.6.15. A high level HIA for the site reviewed existing historic environment evidence in order to assess the potential effects that could arise from the allocation. Given the relationship to Burnt Walls, development presents the opportunity to integrate the site better with the surrounding townscape and context. Due to the archaeological potential of the site, the HIA recommends that a more detailed archaeological desk based assessment is undertaken. This will identify the nature of the archaeological resource, the need for any additional investigation work and will inform an appropriate mitigation strategy. All programmes of work should be agreed in advance with the Planning Archaeologists and Historic England. 6.6.16. Mitigation and enhancement opportunities include the thoughtful use of existing and new landscaping, retention and enhancement of boundary hedgerows, respect for the sloping nature of the site and surrounding area in designing building heights and ridgelines; and carefully positioning buildings to allow views and green spaces between them to help break up massing and manage visual impact. The part of the site north of the A45 and immediately west of Burnt Walls is identified as a heritage buffer to maintain the open character around the scheduled monument. This provides the opportunity to enhance views towards the monument and provide interpretation for the public. These mitigation and enhancement measures should be covered and taken forward in the assessments in support of a planning application. It is also considered that through sensitive design the redevelopment of the existing uses on the site could have potentially positive impact on the setting of nearby assets. It is not considered that site capacity would be significantly affected by the mitigation measures. 6.6.17. Part of the site is within the Catesby and Fawsley Special Landscape Area (SLA). The Special Landscape Area Study for the Daventry area (2017) sets out the special qualities that define this particular area of SLA and proposals will be expected to consider the impact on the special qualities outside the site. Once further details of the scheme emerge through detailed masterplanning work the precise boundary of the SLA in this location will be adjusted accordingly to exclude the area where built development will take place. 6.6.18. It will be important to ensure there is only limited harm to the landscape setting and development proposals will need to recognise the sensitivity of the location and provide appropriate green buffers to ensure the wider setting of Newnham Hill and the Borough Hill Scheduled Monument are protected and enhanced. Any development here should also refer to policies EN1, EN2, EN3, EN4, EN6 and EN7. 6.6.19. To assist with improvements at this gateway location, the relocation of the vehicle recycling facility will be supported subject to meeting the criteria in policy EC8 in the Economic Growth Chapter. 6.6.20. Existing water mains cross the site, and the site layout should be designed to take these into account. This existing infrastructure is protected by easements and should not be built over or located where access for maintenance and repair could be restricted. The existing water mains and sewers should be located in public highway or public open space. If this is not possible a formal application to divert Anglian Water’s assets may be required.
Design & placemakingHeritage & characterSite allocations📍 Daventry
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.