← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / D9

Site allocation D9

Daventry, South East Gateway

On pages 179 to 181 of the official PDF.

The human version

This site allocation covers the South East Gateway in Daventry, for E(g), B2 or B8 uses. A masterplan agreed by the Council is required. Proposals must provide a mix of unit sizes not exceeding 10,000 sq m, high quality design and an enhanced gateway into the town along the A45. They must respond to nearby heritage, including the Burnt Walls and Borough Hill Scheduled Monuments, and keep the area shown as a heritage buffer open in perpetuity. An archaeological desk based assessment is needed. Walking and cycling links to the Marches employment area and neighbouring homes, transport contributions and water infrastructure details are also required.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 179

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy D9 – Daventry, South East Gateway Site D9 is allocated for E(g), B2 or B8 uses. A. Development proposals for this site must be informed by a masterplan, agreed by the Council, that must demonstrate how the site can come forward comprehensively. B. Proposals for this site will make provision for all of the following: i. A mix of unit sizes not exceeding 10,000 sq m; ii. High quality design to optimise the layout of the site; iii. An enhanced gateway into the town along the A45; iv. Demonstration that they respond to the special qualities of the Special Landscape Area outside the site; v. Careful consideration of scale and massing and sympathetic design to mitigate the impacts on the setting of Burnt Walls and Borough Hill Scheduled Monuments and the non-designated John of Gaunts Castle and Daventry Wood Farm; vi. Retention of the openness of the area shown as a heritage buffer on the Policies Map in perpetuity to sustain the significance and setting of the Burnt Walls Scheduled Monument. Proposals for positive and appropriate ongoing land management and works that would better reveal the significance of Burnt Walls will be supported; vii. An archaeological desk based assessment to identify the nature of the archaeological resource and the need for any additional work or mitigation strategy. All programmes of work should be agreed in advance with the Planning Archaeologists; viii. Integration with the Marches Employment area; ix. Walking and cycling links from the Gateway to the Marches employment area and neighbouring residential areas; x. Walking and cycling links from the site to the remainder of the employment area and the neighbouring residential area; xi. An appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the local plan’s Strategic Transport Assessment (2026); xii. Details of any required mitigation relating to water and water recycling infrastructure and any necessary phasing arrangements; xiii. Safeguarding of suitable access for the maintenance of water supply infrastructure; and xiv. Compliance with the Northamptonshire Minerals and Waste Local Plan. WNLP objectives: 1, 2, 4, 7, 9, 13, 14, 15 6.7 Daventry Country Park 6.7.1. Daventry Country Park is a key component of the green infrastructure network which connects through the town to the wider countryside. It is a high quality green space that is jointly owned and managed by the Council and the Canal and River Trust and extends to approximately 37 hectares. It is centred on Daventry Reservoir within easy reach of residential areas and the town centre and contains trails, different types of habitats and various visitor facilities. It is well used, mainly by residents of the district but also from further afield, for informal exercise, education, children’s play, leisure, organised events and wildlife watching. Its importance for biodiversity and heritage are recognised by a number of statutory (Local Nature Reserve and Conservation Area) and non- statutory designations (Local Wildlife Site). 6.7.2. The boundary of the Daventry Reservoir Conservation Area extends beyond the country park to the north as far as the Grand Union Canal and was designated in recognition of its historic connection to the Canal as a feeder reservoir. The area beyond the country park contains a spillway and channel that are still used to feed the canal. 6.7.3. Although currently on the edge of the urban area, planned strategic developments to the north and east will effectively enclose the country park. It is important that green and blue links are maintained to the north and the wider countryside for the purposes of wildlife corridors, health and wellbeing and because of the historical link between the reservoir and the Grand Union Canal. Extensions to the country park towards the Grand Union Canal are secured through the Monksmoor development and planned in connection with Daventry North East. This will provide an increased area for informal recreation and wildlife habitats and will bring it within reach of around 5,000 new dwellings. However, the increased usage, together with visitors to the canal will need to be appropriately managed to protect the biodiversity and heritage value of the Country Park. More intensive use should be directed towards the less sensitive areas. 6.7.4. Daventry North East (Policy D5) will deliver a structural green corridor which will run close to the eastern boundary of the park and connect the town centre with the Grand Union Canal providing a high quality recreational route for pedestrians and cyclists.
Nature & environmentSite allocationsTransport & travel📍 Daventry
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.