← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / EC10

Site allocation EC10

Whittlebury, Land at Shacks Barn

On pages 292 to 294 of the official PDF.

The human version

This site allocation sets aside 10 ha at Shacks Barn, Whittlebury, for mixed employment development. A masterplan for the whole site is needed before any application. Uses will be E(g), B2 and B8, with supporting uses only if complementary, and an independent market assessment is required. Access uses the existing access only, with new footpaths and cycleways, public transport links and a Transport Assessment and travel plan. A heritage impact assessment is needed because of the Lordsfield Farm scheduled monument. Archaeological, landscape and visual, and crime prevention assessments are also required.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 292

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EC10 – Whittlebury, Land at Shacks Barn Site EC10 is allocated for 10ha of mixed employment generating development. A. An integrated, coordinated and comprehensive planning approach will be required for the employment site and a masterplan must be prepared, in consultation with the local planning authority, the local highway authority and other statutory undertakers prior to the submission of a planning application covering the development of the whole site. B. The uses on the site will be a mix of E(g) (Uses which can be carried out in a residential area without detriment to its amenity, including offices, research and development and light industrial uses), B2 (general industrial) and B8 (storage and distribution). Supporting uses may be included where they are demonstrated to be subservient and complementary in both scale and nature to the proposed E(g) or B class use. The overall mix of uses will be required to be supported by an independent market assessment. C. Access to the site will be based on the existing access only; and i. Provision of new footpaths and cycleways that link to existing networks; and ii. Good accessibility to public transport services should be provided for, including contributions to the cost of diverting existing routes through the site or to support existing local services to help promote sustainable travel as well as the enhancement of pedestrian cycling and walking links between the site and Towcester town; and iii. A Transport Assessment and travel plan will be required to assess the transportation implications and to identify appropriate mitigation measures. D. A detailed heritage impact assessment will be required for the whole site, to be agreed with the Local Planning Authority in consultation with Historic England where relevant to the scheduled monument, the assessment will: i. Inform the height of any proposed buildings, layout and extent of the proposed development, taking into account the site allocation in line with the relevant supplementary planning document; ii. Include a detailed assessment of the effects of the development of the site on the significance of the scheduled monument, Lordsfield Farm; iii. Consider the impacts on the designated and non-designated heritage assets (where applicable), and iv. Subject to the assessment being agreed, identify proportionate mitigation measures that ensure that the development avoids harm to significant heritage sites. v. The assessment and findings, including mitigation measures, must be included with any planning application. E. Prior to the submission of an application, a detailed archaeological assessment for the whole site will be undertaken to characterise archaeological remains, identify potential impacts and to inform an appropriate programme of archaeological mitigation which could involve preservation in situ by design or record or a combination of the two. The scope and methodology of this work will be agreed with the Local Planning Authority. F. A detailed strategic landscape and visual impact assessment of the whole site will be required to deliver a high quality landscaped setting within and around the boundary of the proposal. G. An assessment demonstrating compliance with the South Northamptonshire Employment Site Allocations Development Brief (October 2022), or any equivalent successor document will be required. H. Development proposals must be supported by an assessment of crime prevention and community safety considerations, identifying potential impacts and any measures necessary to address them through the design and layout of the site. WNLP objectives: 4, 10, 14, 15, 17 Northampton, land south of Junction 16 M1 12.12.8 Located approximately five miles from the centre of Northampton at Junction 16 of the M1 motorway, and benefiting from direct strategic road network access (A45 and M1), this site offers good highways connectivity for distribution, making it a prime location for national and international logistics and supply chain operations. The site is close to existing employment land which includes Panattoni Park to the north and Heygates Mill towards the east. It extends to approximately 50 ha. 12.12.9 The site contains mineral resources. Minerals extraction will be required prior to, or as part of the phased delivery of any employment development. The site lies within the impact area of a Site of Special Scientific Interest (SSSI), located to the south of the proposed boundary, although there are no designations within the site boundary itself. Any development will have to demonstrate that it will not have an adverse effect on the SSSI and will require appropriate ecological mitigation. 12.12.10 The southern boundary of the site is also bordered by the River Nene. Therefore, as well as the ecological detail, developments will need to take into account any flood risk associated with the river and ensure that appropriate mitigation and sustainable water drainage measures are incorporated to protect the site and the river itself. 12.12.11 The village of Nether Heyford is located less than 400 metres to the south-west of the site and has a conservation area at its core. The smaller hamlet of Upper Heyford sits close to the north-west boundary, with a mix of residential and agricultural properties outlining the sites border. Sensitive design, landscape buffers and green infrastructure will be required to protect the amenity and character of all neighbouring communities. 12.12.12 The location of the site is identified as suitable for strategic logistics and industrial development. It is important that the strategic B8 warehousing and logistics uses are supported, alongside ancillary uses which support the role and function of the area. 12.12.13 The Habitats Regulations Assessment identifies that the site has the potential to support functionally linked land associated with the Upper Nene Valley Gravel Pits SPA. Proposals will be required to undertake overwintering bird surveys and address any mitigation requirements identified through the assessment process.
Jobs & economySite allocationsTransport & travel📍 Nether Heyford📍 Northampton📍 Towcester📍 Whittlebury
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.