← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / EN16

Policy EN16

Development in the Nature Improvement Area

On pages 336 to 337 of the official PDF.

The human version

This policy covers development in the Nene Valley Nature Improvement Area. Development there will be permitted where it enables the functioning of the Nature Improvement Area and, where appropriate, contributes to opportunities for habitat creation or habitat management within it. The policy sets two tests. The first is that the development enables the area to function. The second is that, where appropriate, it adds to habitat creation or habitat management in the area. The policy links to Plan objectives 1 to 7.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 336

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EN16 – Development in the Nature Improvement Area Development within the Nene Valley Nature Improvement Area will be permitted where it: i. Enables the functioning of the Nature Improvement Area; and ii. Where appropriate, contributes to the opportunities for habitat creation and/or habitat management within the Nature Improvement Area. WNLP objectives: 1, 2, 3, 4, 5, 6, 7 13.19. River corridors 13.19.1. All river environments are an important resource for wildlife, the biodiversity network, leisure and recreation and are also an important link to the area's past and cultural heritage. The River Nene is a strategic river that together with the Grand Union Canal provides an important navigable function for West Northamptonshire, connecting the area to the rest of the waterway network. The River Nene contributes heavily to the area's sense of place, and the banks of the Nene are rich in heritage assets. The Nene offers opportunities to restore enhance and create wetland landscapes and other natural habitats. It also provides a focus for regeneration and the provision of accessible open space and Green and Blue Infrastructure as it passes through Northampton. 13.19.2. Across the plan area, there is significant potential to enhance the setting of the River Nene and its tributaries, and other river systems, such as for the Great Ouse, the River Cherwell (flowing into the River Thames) and the River Ise, both within the urban and rural context. Within the town of Northampton itself, the River Nene provides opportunities for sport, leisure and recreation such as canoeing and rafting, the Northampton Marina facilities at the River Nene's junction with the Grand Union Canal, and access to walks and cycle routes. 13.19.3. As the river opens up into the broad floodplains to the south of Northampton, and particularly in the areas that have previously been exploited for gravel extraction, there are increased opportunities for habitat creation and enhancement, especially those linked to the internationally designated Special Protection Area and priority habitats, such as wet grasslands. These areas also help to meet some of the flood risk management requirements, as set out above, by making space for water and providing an important resource for helping to provide the area with ways to adapt to climate change. 13.19.4. River Corridors are particularly important for biodiversity and Biodiversity Networks because they are specialist habitats with high habitat and nature value, and as they have a natural connectivity to their tributaries and their wildlife corridors/habitats. These GBI networks and biodiversity functions could be enhanced by river related measures, such as river restoration and bank improvements, water quality protection and Sustainable Farming/Sustainable Land Management. The project ‘Farming for the Future’ sets out measures to improve Sustainable Farming Sustainable Land Management in more detail. The Wildlife Trust for Beds, Cambridgeshire and Northamptonshire is also able to advise on land management and to a number of riverine Local Wildlife Sites. 13.19.5. Hard engineering approaches to riverbank protection will be discouraged and opportunities to apply soft engineering and natural flood management techniques are encouraged. This has multiple benefits for example for biodiversity, flood storage, Water Framework Directive objectives, heritage, genius loci and aesthetics. Where watercourses have been historically modified within or directly adjacent to a development, and where the opportunity arises, the watercourse should be restored, as part of good design, and where possible as habitat. Adequate attention to waterway design and buffers is resulting in better water quality, and a more natural environment with soft landscaping, thus benefiting wildlife and the river environment as a positive experience. 13.19.6. In recognition of the importance of the River Nene, the Environment Agency with its partners is producing the ‘Nene Water Management Strategy’. The Council is committed in the support of that project. 13.19.7. Contamination in or on land can present risks to the water environment (surface and groundwater), given the sensitive nature of the water environment in West Northamptonshire to pollution, especially where water gets removed from rivers for domestic use. Where land contamination is suspected or known to exist, an assessment must be undertaken by a ‘competent person’ to assess the risks. It may be necessary to undertake a site investigation to identify all potential risks from land contamination, and where unacceptable risk is identified, a remediation strategy needs to be provided before the determination of an application for development. All investigations and remediation must to be carried out in accordance with Land Contamination Risk Management guidance.
Flooding & waterHeritage & characterNature & environment📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.