← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire Plan Explorer

Flooding & water

Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.

139 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy deals with air quality. All development must consider its effect on local air quality and whether mitigation is needed during construction and afterwards. Where sensitive receptors are placed in an area of poor air quality, an air quality assessment is needed. Major developments, and those with biomass boilers or biomass or gas CHP, must show through an assessment that they are air quality neutral. All proposals should show how they will cut dust and transport and plant emissions, consider low emission travel, and use low emission heating and cooling.

The human version (we wrote this, not the council)This policy sets out how flood risk and surface water will be managed. Development is steered to the lowest flood risk areas through the Sequential Test, and an Exception Test applies in set cases. Site-specific flood risk assessments are needed for development in Flood Zones 2 and 3 and for sites of 1 hectare or more in Flood Zone 1. New development needs an 8m offset to Main Rivers and 9m to ordinary watercourses. All development must manage surface water using sustainable drainage systems. Habitable floor levels should be at least 600mm above the predicted flood level.

The human version (we wrote this, not the council)This policy supports the University of Northampton at its Waterside Campus. The site is safeguarded for education and ancillary uses, and development should improve links with the wider Central Area. The Council will continue to support student accommodation and related uses. Proposals should respond to the riverside setting and green and blue infrastructure, and address flood risk, drainage and utility constraints. A site-specific Flood Risk Assessment is needed, meeting the Upper Nene design standard of a 0.5% probability event plus climate change allowance. Access for maintaining foul drainage infrastructure must be safeguarded.

The human version (we wrote this, not the council)This site allocation covers Hill Farm Rise, Hunsbury Hill in Northampton, allocated for residential development of approximately 80 dwellings. Proposals must follow the diagram in Figure 8. They need an ecological survey and landscape assessment, covering established trees, possible priority grassland and a possible wildlife site. They must be sensitive to the adjoining Local Wildlife Site and keep rail network operational access. Design must reduce noise, particularly from the railway. Other requirements include better links to the Mereway neighbourhood centre, a flood risk assessment, a transport assessment covering the A45 and M1, and contributions to transport and healthcare.

The human version (we wrote this, not the council)This site allocation covers Land north of Newport Pagnell Road in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 1,000 dwellings, education provision, a local centre, open space, a leisure and sports contribution, and structural greenspace and wildlife corridors. Active travel and public transport are to be prioritised, with healthcare and transport contributions. Assessments are required, including highways impact on the A45 and M1. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, with two years of overwintering bird surveys before submission.

The human version (we wrote this, not the council)This site allocation covers Land west of the A43 in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 2,900 dwellings, education provision, a local centre with retail, community and health uses, open space, and structural greenspace and wildlife corridors. They must leave a gap between development and Moulton village and provide active travel links to it. Heritage effects, including on the Moulton conservation area, must be assessed. Healthcare and transport contributions are required. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, with overwintering bird surveys.

The human version (we wrote this, not the council)This site allocation covers The Green, Great Houghton in Northampton. Residential development of about 650 dwellings will be supported, subject to criteria. Two years of overwintering bird surveys are needed before submission, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed. Design must respect the Great Houghton Conservation Area, with a Heritage Impact Assessment. The main access should be from The Green west of Saucebridge Farm, limiting extra traffic towards Great Houghton village and Bedford Road. Proposals need air quality and noise assessments, an archaeological assessment, and a landscape vision protecting views of the Grade II* listed church.

The human version (we wrote this, not the council)This policy supports the extension of the Martin's Yard employment area in Northampton for employment purposes to meet local demand. The extension is restricted to the area shown in Figure 17. A Transport Assessment must test the existing highway and access. Ecological and green infrastructure enhancements and net biodiversity gains are required, given the site lies in the Brampton Valley Arm, immediately south of the Kingsthorpe Local Nature Reserve. A landscape barrier is needed between the employment area and the residual land. Applications need a flood risk assessment, sustainable drainage and improved water quality.

The human version (we wrote this, not the council)This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.

The human version (we wrote this, not the council)This policy sets standards for new homes. 5% of new homes must meet Building Regulations Part M4(2). Where the Council allocates or nominates occupants, 10% of homes must meet M4(3)(2)(b), and 5% of all new market dwellings must meet M4(3)(2)(a). These are applied across the housing mix, and may be waived where robust evidence shows a site is unsuitable, for example because of flooding or topography. The internal floor area and storage of all new build homes must meet National Space Standards. All new homes must comply with a water efficiency limit of 110 litres per person per day.

The human version (we wrote this, not the council)This policy covers Houses in Multiple Occupation. In Northampton, proposals are supported if fewer than 10% of dwellings within a 50m radius are HMOs, and they would not create a continuous frontage of two or more HMOs or sandwich a single self-contained home between two HMOs. Across West Northamptonshire, proposals must show they protect amenity and living standards, meet the Council's space standards, and provide car parking, secure cycle storage, refuse storage and external amenity space. They must not increase flood risk, and ground floor bedrooms are not allowed where flooding would put occupants at risk.

The human version (we wrote this, not the council)This policy supports proposals that deliver the aims of the West Northamptonshire Tree and Woods Strategy, the UK Tree Strategy and the England Tree Action Plan, to increase tree cover, protect woodland and connect people to trees. It supports expanding and linking woodland habitats, conserving ancient woodland and veteran trees, protecting high quality and amenity trees, and more street trees in urban areas. Tree planting should be targeted where green infrastructure benefits are greatest, including low-grade farmland and land needing remediation. It also supports sustainable public access to woodlands and positive woodland management.

The human version (we wrote this, not the council)This policy covers development in the Nene Valley Nature Improvement Area. Development there will be permitted where it enables the functioning of the Nature Improvement Area and, where appropriate, contributes to opportunities for habitat creation or habitat management within it. The policy sets two tests. The first is that the development enables the area to function. The second is that, where appropriate, it adds to habitat creation or habitat management in the area. The policy links to Plan objectives 1 to 7.

The human version (we wrote this, not the council)This policy protects and enhances the natural and cultural environment of river corridors and their tributaries. Proposals must show they understand the river's importance for biodiversity and natural capital. Development likely to harm a watercourse's functions and setting will not be permitted. In previously undeveloped areas, an undeveloped buffer of at least 10m from the top of the bank must be kept on both sides, planted with native species, with no new domestic gardens. A working methods statement and a long-term Landscape Ecological Management Plan are required. Culverting and hard bank revetment are not supported, de-culverting is supported, and groundwater must not be harmed.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.