Policy EN17

River corridors

On pages 337 to 339 of the official PDF.

The human version

This policy protects and enhances the natural and cultural environment of river corridors and their tributaries. Proposals must show they understand the river's importance for biodiversity and natural capital. Development likely to harm a watercourse's functions and setting will not be permitted. In previously undeveloped areas, an undeveloped buffer of at least 10m from the top of the bank must be kept on both sides, planted with native species, with no new domestic gardens. A working methods statement and a long-term Landscape Ecological Management Plan are required. Culverting and hard bank revetment are not supported, de-culverting is supported, and groundwater must not be harmed.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 337

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EN17 – River corridors A. The natural and cultural environment of the river corridors through the Plan area, including its tributaries, will be protected and enhanced in recognition of its important contribution to the area’s Green and Blue Infrastructure network, landscape, townscapes, regeneration, recreation and historic environment. B. Proposals for new development and habitat enhancement should demonstrate an understanding of the importance of the river for biodiversity and natural capital within and beyond the Plan area. C. Watercourses and associated land, such as natural and seminatural habitats close to them, play a pivotal role in maintaining ecological function not only for themselves, but also for the water environment and dependent wildlife, and also in the habitat connections of neighbouring green spaces, habitats and related wetland and water habitats. Therefore: i. Development proposals that are likely to have an adverse impact on the functions and setting of a current watercourse and its associated corridor will not be permitted. ii. Development should seek to conserve and enhance the ecological, landscape and recreational value of the watercourse and its associated corridor through good design and in line with the Water Framework Directive objectives, whenever possible. In previously undeveloped areas, an undeveloped buffer zone measuring a minimum 10m from the top of the riverbank is required to be retained/reinstated on both sides of the watercourse, in order to provide for the functioning of wildlife habitats, while being able to facilitate informal access for enjoyment of the river. For any construction and operational phases of development, development will need to include a working methods statement detailing how the buffer zone will be protected during construction together with a long-term Landscape Ecological Management Plan. iii. New domestic gardens and formal landscaping should not be incorporated into the buffer zone. The buffer zone should be planted with locally native species and appropriately managed under an agreed scheme. The buffer zone and river corridor should form an essential/valuable part of green infrastructure. iv. Developments that propose culverting of watercourses or hard bank revetment or prevent future opportunities for de-culverting and naturalisation of riverbanks will not be supported, and those that include de-culverting and naturalisation of riverbanks be supported. Proposals for new essential infrastructure will be supported. v. . Development will be not permitted unless the applicant can demonstrate that there will be no adverse impacts to groundwater. WNLP objectives: 1, 2, 3, 4, 5, 6, 7 13.20. Ground instability 13.20.1. There are areas across the Plan area that are prone to ground instability issues due to their underlying geological and geomorphological make up. Northampton Sand occasionally overlays Upper Lias Clay and this combination can cause the formation of landslides particularly where slopes have angles greater than seven degrees. A number of the ground stability issues encountered in this geological setting formed during the end of the last ice age and are considered to be in a state or near to a state of equilibrium. If however, these slopes are disturbed, by human activities or the ingression of water, these features could be reactivated. 13.20.2. The risk of landslide is increased by the following: • Local geology; • Natural springs in the area; • Slopes of over seven degrees; and • Human activity (e.g. building or diversion of water into slope). 13.20.3. Unfavourable slope conditions can practically be accommodated through engineering design. For instance, the risks presented by new development proposals, which can potentially create instability in adjacent existing infrastructure either through construction activity such as excavations, vibrations and operation of plant or machinery should also be considered. 13.20.4. The areas in West Northamptonshire where instability is suspected have been identified using data available from the British Geological Survey (BGS). This data identifies land on gradients that are greater than seven degrees. 13.20.5. When preparing planning applications, the developer will be required to establish if their proposal is in an area of known or potential ground instability using the data available from the BGS. If the proposal is in an area of known or potential ground instability the developer will be required to submit a ground stability report describing and analysing the issues relevant to ground instability and indicating how any issues will be mitigated against including remedial works. The ground stability report will be required to accompany the submission of the planning application. 13.20.6. Where land is affected by ground instability and is unsuitable for built development, in larger developments, proposals should consider alternative uses that support biodiversity, green infrastructure and ecological connectivity for those areas.
Flooding & waterInfrastructure & utilitiesNature & environment📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.