Site allocation N11

Northampton, Northampton Railway Station and Railfreight

On pages 119 to 122 of the official PDF.

The human version

This site allocation covers Northampton Railway Station and Railfreight. Proposals should create a town centre gateway and multimodal transport hub. The station and its facilities are safeguarded for current and future passenger services. A multi-storey car park is supported. Mixed-use development is supported on the station site, with about 280 homes and buildings no higher than nine storeys. On the railfreight site about 362 dwellings are supported, at three to six storeys, on land not needed for rail. Developers must protect the Northampton Castle scheduled monument, provide natural greenspace, carry out ecological and flood risk assessments, and contribute to healthcare and transport.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 119

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy N11 – Northampton, Northampton Railway Station and Railfreight A. Proposals will be supported which create a town centre gateway, anchor and multimodal transport hub, with better activation of the street scene and interactive elements such as water features, sculptures and playful elements, to create a visual link to the heritage of the area and to the wider Central Area. Schemes should: i. Create a sense of arrival and identity; ii. Diversify uses and facilities to unlock regeneration; iii. Create connections; iv. Promote active travel and safety; and v. Create a green place to live, work and play. B. The existing Northampton Railway Station building and associated buildings, platforms, tracks, infrastructure, security measures, car parking and associated services and facilities will be safeguarded to ensure that the provision of current and future accessible passenger railway services to and from Northampton will be maintained. This will also continue to contribute towards an increased modal shift towards rail usage whilst supporting the provision of on site and related employment. These safeguarded areas will include safeguarded road accessibility to allow for 24-hour servicing and emergency access to Northampton Railway Station via St Andrew’s Road. C. Subject to compliance with other policies in this Plan and material considerations, proposals to provide additional capacity to facilitate improved passenger railway services will be supported. D. To secure the protection, enhancement and enjoyment of the character and setting of the adjacent listed building and its two adjoining listed walls that are located within the existing railway station site, public realm will be created between the heritage assets and the station building. Any proposal should result in an improvement to the sense of arrival to the town centre. E. The development of a permanent and secure multi-storey car park on the site with access to the main railway station building will be supported in order to create sufficient on-site car parking, bicycle and motorcycle parking, as well as provision for people with / or affected by impaired mobility to cater for the future growing demand of rail usage. F. Proposals will be required to make an appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the local plan’s Strategic Transport Assessment (2026). G. The Council will support the delivery of mixed-use development including residential, a multi-storey car park, commercial offices, co-working spaces, hotel and ancillary Class E uses. A scheme no higher than nine storeys will be acceptable in this location. The Council will also support the delivery of about 280 homes. Railfreight H. On the railfreight site, the Council will support the delivery of about 362 dwellings, subject to analysis of capacity, on the residual areas not required for commercial goods and/ or passenger rail services. A scheme which ranges between three and six storeys is considered acceptable. Residual areas not required for rail related services and are suitable for employment use including offices. The whole site I. Scale and height should generally transition from a higher point at the station and lower towards the north. J. Development proposals will need to provide details of how accessible natural greenspace is to be provided at the northern end of the site. New development will also need to provide a contribution towards providing a woodland stepping-stone (a connected habitat) to the north of the site. K. Opportunities should be sought to improve water flow around the site by reducing surface-water runoff and introducing areas of floodplain to reduce the risk of flooding, absorb water and reduce sediment run-off through the introduction of Sustainable Drainage Systems (SuDS). L. Any development proposals need to demonstrate how the scheme is contributing towards improvements in pedestrian and cycle connections with the surrounding area, including connections to the town centre and to the green infrastructure network west of Chalk Lane. The following are to be incorporated into any master planning and/ or planning application proposals for the two sites: M. Development should be high quality, recognising the significance of the Northampton Castle scheduled monument on-site and the Castle Complex scheduled monument to the south-east of the site. On and off-site heritage assets should be protected and enhanced and design and capacity will be informed by detailed archaeological investigations and assessments in advance of development. Given the high sensitivity of both sites on heritage assets, specialist surveys will need to be undertaken, both with regards to the archaeological sensitivities as well as the possible contamination. N. Development should consider the following in an integrated manner: i. Securing permeability within the site for pedestrians and cyclists; ii. Improving safe connectivity, including direct pedestrian routes, between the site and Spring Boroughs residential area and the town centre; and iii. Exploring opportunities for development to enhance the site’s relationship to the Brampton Arm of the River Nene. O. A detailed ecological assessment will be required to identify sensitive ecological receptors. This should include an appropriate suite of habitats, including for Open Mosaic Habitat on previously developed land (OMHPDL), species surveys carried out, suitable mitigation measures identified, and an appropriate assessment of Biodiversity Net Gain within the site design making suitable BNG provisions on site with a view to achieving LNRS measures. P. Any development proposals need to demonstrate how they are contributing to improvements in air quality in the surrounding area. There are also opportunities improve water quality, particularly at the northern boundary of the railfreight site. Q. Development proposals for this site should be accompanied by a site-specific Flood Risk Assessment. Any proposal should also take into account the fact that the site is included within the Upper Nene Catchment Local standards for surface water drainage of 1 in 200 year plus an allowance for climate change to protect against pluvial flooding. R. Any proposal should include the safeguarding of suitable access for the maintenance of foul drainage infrastructure. S. Proposals will need to provide appropriate funding contributions towards healthcare infrastructure provision. WNLP Objectives: 1, 7, 9, 10, 11, 12, 14, 15, 17 Figure 7: Development principles for Northampton Railway Station (N3vii and N6vi) and Railfreight (N3ix and N6vii) Northampton, Hill Farm Rise, Hunsbury Hill (N6xii) 5.9.22. The site is approximately 4.44 hectares in size and is located in Hunsbury, south- west Northampton. It is surrounded by a mix of uses including the Mereway Neighbourhood Centre with Tesco Mereway, a library and a Church to the north- east, residential to the east and west and the railway line and a Local Wildlife Site to the south/ south-west. 5.9.23. The site adjoins a railway line, which then runs in a tunnel (Hunsbury Hill tunnel) under part of the site. The railway forms part of the Northampton Loop Line of the West Coast Main Line. Also adjoining the site is an area which is used for railway operational purposes including access. In addition, there is a significant number of trees on the site, particularly along the border. There is a possibility that the site also has some priority habitat grassland that may require protecting. The majority of the site is also a potential wildlife site.
Heritage & characterSite allocationsTransport & travel📍 Hunsbury📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.