Site allocation N15

Northampton, Land west of the A43

On pages 130 to 134 of the official PDF.

The human version

This site allocation covers Land west of the A43 in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 2,900 dwellings, education provision, a local centre with retail, community and health uses, open space, and structural greenspace and wildlife corridors. They must leave a gap between development and Moulton village and provide active travel links to it. Heritage effects, including on the Moulton conservation area, must be assessed. Healthcare and transport contributions are required. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, with overwintering bird surveys.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 130

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy N15 – Northampton, Land west of the A43 Site N15 Northampton, Land West of the A43 is allocated for residential development. A. Proposals for this site must be informed by a Masterplan, agreed by the Council that must demonstrate how the site can come forward comprehensively. B. Proposals for this site will make provision for all of the following; i. Approximately 2,900 dwellings; ii. Development which is consistent with the diagram shown in Figure 11; iii. Appropriate education provision of a scale and form sufficient to meet the needs arising from the development; iv. A local centre, including appropriately scaled retail provision, community facilities and health-related uses; v. Open space and appropriate contribution towards leisure/sports provision; vi. Structural greenspace and wildlife corridors which retain important existing landscape features including hedgerows, drainage corridors, woodlands and mature trees and include appropriate landscape enhancements in keeping with the Landscape Character Type; vii. Proposals to prioritise active travel and public transport modes through the delivery of a sustainable and integrated transport network, based on Policies PL6 and TR1; viii. Provide for a gap between any development and Moulton village; ix. Active travel links with the facilities in Moulton Village; x. Appropriate healthcare infrastructure contributions, which may include financial contributions or new primary care infrastructure. Where necessary, land may be required; xi. An appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the Local Plan’s Strategic Transport Assessment (2026); and xii. Upper Nene Valley Gravel Pits Special Protection Area impacts, including the requirement for sensitive design to avoid the displacement of birds due to operational activity and the demonstration of compliance with the requirements of Policy EN15. C. Proposals for the site will be informed by assessments and suitable mitigation related to: i. Archaeological impact; ii. Heritage impact: addressing potential effects on the existing listed building or potential assets and the surrounding villages, including conservation area in Moulton Village; iii. Landscape and visual impact; iv. Ecological impact; v. Highways and transport including cumulative impact of the scheme on the A43; vi. Flood Risk and water and water recycling infrastructure; vii. Noise and Air Quality including the impacts of noise and pollution from the A43; viii. Crime and disorder; and ix. Minerals and waste. D. Prior to submission, two years of overwintering bird surveys shall be undertaken to determine whether the site is used by overwintering Golden Plover / Lapwing and to identify whether it acts as functionally linked land to the Upper Nene Valley Gravel Pits Special Protection Area. If the site is found to be functionally linked land, appropriate mitigation will be required for the loss of habitat and the application accompanied by a Construction Environmental Management Plan (CEMP) that includes measures that avoid the displacement of protected birds from construction noise and construction activity including, where appropriate, restrictions on the timing of works. E. Subject to detailed assessment (including an assessment of contaminated land), development on this site should maximise the use of Sustainable Drainage Systems (SuDS) to reduce the rate of surface water run off. F. Any proposal for this site should be accompanied by a site-specific Flood Risk Assessment considering the Plan’s Strategic Flood Risk Assessment. Any proposal should also take into account the fact that the site is included within the Upper Nene Catchment Local standards for surface water drainage of 1 in 200 year plus an allowance for climate change to protect against pluvial flooding. WNLP Objectives: 1, 9, 10, 12 Figure 11: Development principles for Northampton, West of the A43 (N6xvi) Northampton, East of A43 (N6xvii) 5.9.44. The majority of this site was included in the version of this plan which was consulted on in spring 2024. This plan proposes a northward extension and an increased capacity. 5.9.45. The WNJCS allocated the Northampton North Sustainable Urban Extension (SUE) as one of eight strategic extensions around Northampton, intended to deliver a balanced mix of homes, jobs, community facilities and green infrastructure. The southern part of the SUE, has planning permission in its entirety and has now been substantially implemented, delivering new housing, green infrastructure and supporting transport improvements. 5.9.46. To ensure the continued and coordinated delivery of growth at the northern edge of Northampton, the remaining part of Northampton North SUE, which doesn’t yet have the benefit of planning permission, is reallocated in this Local Plan, together with additional adjacent land to the north. 5.9.47. The extended site is a sustainable location for development beyond the existing urban area, benefiting from its proximity to employment areas at Round Spinney and Moulton Park, and good access to the A43 corridor. The local plan’s Strategic Transport Assessment identifies opportunities to build upon existing sustainable transport infrastructure and improve accessibility by walking, cycling and public transport. Development of the remaining land will consolidate the earlier phases and deliver a coherent, high-quality and well-connected neighbourhood. 5.9.48. The site occupies an area of gently undulating arable farmland which rises slightly from the south-west towards the north and east. The landscape is generally of low to medium sensitivity, as identified in the Northampton Landscape Sensitivity and Green Infrastructure Study (2013). The area’s relatively contained topography and presence of mature tree belts— particularly Cowpasture Spinney (a 50–60 metre wide belt along the eastern edge) and a significant area of mature trees protected by Tree Preservation Orders (TPOs) provide a high degree of visual containment from longer-distance views, although openness increases towards the north. These natural features form important landscape elements and ecological corridors. 5.9.49. While parts of the site are of low ecological interest, these woodland belts and watercourses are locally significant habitats. Cowpasture Spinney is designated as a Local Wildlife Site. Proposals for the site must protect and enhance these features, providing opportunities for biodiversity enhancement and habitat connectivity through the creation of new green corridors and open spaces. Particular regard should be had to the protection and reinforcement of woodland, tree belt and hedgerow networks associated with the A43 corridor, recognising their role in supporting biodiversity, habitat connectivity, landscape character, flood resilience and climate adaptation. 5.9.50. The site is well located in relation to existing employment areas offering opportunities for sustainable travel patterns between homes, workplaces, and education. The implemented phase has already begun to deliver elements of a sustainable transport network. The remaining land will build upon this framework, enhancing connections for public transport, cycling and walking, and providing safe and direct routes to adjoining neighbourhoods and the town centre. 5.9.51. Given its proximity to the A43, proposals must address potential impacts from traffic noise and air quality. Proposals will therefore need to be supported by detailed assessments and incorporate mitigation measures— for example, strategic planting, landscaped buffers, and building orientation— to ensure a high-quality living environment. 5.9.52. The reallocated, extended, site must be informed by assessments of landscape and visual impact, ecology, and flood risk. 5.9.53. Sustainable drainage measures should build on the natural watercourse network of Billing Brook and provide multifunctional green spaces that also support biodiversity, visual amenity, and climate resilience. 5.9.54. To secure a coherent extension, the whole of the allocation must be planned and delivered in a comprehensive and coordinated manner, through an agreed masterplan and infrastructure delivery plan. This will ensure that transport, utilities, and social infrastructure are delivered in step with housing and that the completed development forms a distinctive and integrated neighbourhood on the northern edge of Northampton.
Flooding & waterNature & environmentTransport & travel📍 Moulton📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.