← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / N20

Site allocation N20

Northampton, South of Grange Park

On pages 150 to 153 of the official PDF.

The human version

This site allocation covers land south of Grange Park in Northampton, allocated for residential development. A masterplan agreed by the Council is required. Proposals must provide approximately 850 dwellings, open space, sports and education provision, and a sustainable transport network. They must also provide structural greenspace and wildlife corridors, and address impacts on the Upper Nene Valley Gravel Pits Special Protection Area. Healthcare and transport contributions are required. Heritage and landscape assessments must show that the rural setting of nearby historic villages is preserved, separation between settlements is maintained, and coalescence is avoided. TPO trees, hedgerows and the stream corridor must be kept.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 150

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy N20 – Northampton, South of Grange Park Site N20 is allocated for residential development. A. Proposals for this site must be informed by a Masterplan agreed by the Council. B. Proposals for this site will make provision for all of the following: i. Approximately 850 dwellings; ii. Development which is consistent with the diagram shown in Figure 16; iii. Upper Nene Valley Gravel Pits Special Protection Area impacts, including the requirement for sensitive design to avoid the displacement of birds due to operational activity and the demonstration of compliance with the requirements of Policy EN15 iv. Appropriate open space/sports provision, education provision and other infrastructure, as identified through the Strategic Transport Assessment and other relevant evidence base documents, to support access to day-to-day services within comfortable walking and cycling distances; v. Provision of a sustainable and integrated transport network that prioritises active travel and public transport modes, in accordance with Policies PL6 and TR1; vi. Structural greenspace and wildlife corridors which retain important existing landscape features including hedgerows, drainage corridors, woodlands and mature trees and include appropriate landscape enhancements in keeping with the Landscape Character Type; vii. Appropriate funding contributions towards healthcare infrastructure provision; and viii. An appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the Local Plan’s Strategic Transport Assessment (2026). C. Proposals for the site will be informed by assessments and suitable mitigation related to: i. Archaeological impact; ii. Heritage impact: Demonstration that development preserves the rural setting of nearby historic villages, maintains separation between settlements, and protects locally valued views, including those experienced from Hackleton and Quinton; iii. Landscape and visual impact: A landscape-led masterplan responding to the undulating landform, incorporating substantial structural planting, safeguarding the TPO woodland adjoining existing development, providing landscape buffers to the country park, and protecting key rural views. Development must avoid coalescence and reinforce the rural edge of Northampton; iv. Ecological impact: Retention and enhancement of the TPO trees, hedgerows and the stream corridor, with biodiversity-led green infrastructure that delivers measurable Biodiversity Net Gain. Proposals must protect and enhance local ecological networks and create new habitats integrated into open space provision; v. Highways and transport: A Transport Assessment demonstrating safe access, capacity at key routes and junctions including Wootton Road, connection to the existing Grange Park residential area and M1 Junction 15; vi. Flood Risk and water recycling infrastructure: A strategy for the management of surface water flooding, utilising sustainable drainage systems that enhance the stream corridor, blue–green infrastructure and water quality. Proposals must ensure adequate foul drainage and water recycling infrastructure is in place; vii. Noise and air quality: including mitigation of noise and air quality impacts from the M1; viii. Crime and disorder; and ix. Minerals and waste. D. Applications will need to consider the recreational impact of the development on the Upper Nene Valley Gravel Pits Special Protection Area. Liaison with Natural England and the council will be required at the outset to establish the type of specific on-site open space that is required. This could include a Suitable Alternative Natural Greenspace (SANG) or Accessible High Quality Semi Natural Greenspace) or other agreed typology. E. Prior to submission, two years of overwintering bird surveys shall be undertaken to determine whether the site is used by overwintering Golden Plover / Lapwing and to identify whether it acts as functionally linked land to the Upper Nene Valley Gravel Pits Special Protection Area. If the site is found to be functionally linked land, appropriate mitigation will be required for the loss of habitat and the application accompanied by a Construction Environmental Management Plan (CEMP) that includes measures that avoid the displacement of protected birds from construction noise and construction activity including, where appropriate, restrictions on the timing of works. WNLP Objectives: 1, 7, 9, 10, 12, 13 Figure 16: Development principles for Northampton, South of Grange Park (N6xxi) Northampton, Martin’s Yard extension (N7iii) 5.9.92. Martin’s Yard is an existing safeguarded employment area which is predominantly occupied by local light engineering, waste disposal and recycling companies. They provide a valuable service for the local community, and there are very few areas which offer these services in Northampton. There are ongoing requirements from existing and interested occupiers to expand and invest in the area. Its expansion will contribute towards meeting demand as well as modernise the area and improve the ecological value of the residual land not required for employment. 5.9.93. The area which is proposed for extension is a vacant site of around 1.4ha, which was previously used for landfill. It contains superficial deposits of clay, silt and gravel. It is currently scrubland and marshland and is dominated by semi- improved grassland and scrub containing Japanese knotweed and disturbed ground. It is located within a Local Wildlife Site and the Brampton Valley Arm of the sub regional Green Infrastructure corridor. There needs to be careful management for the lifetime of the development to ensure that the LWS does not become degraded. To the north is the Kingsthorpe Local Nature Reserve. 5.9.94. The former Northampton to Market Harborough railway corridor lies in the wider area and is now largely occupied by the Brampton Valley Way. The West Northamptonshire Council Rail Action Plan (adopted in June 2026) identifies the route as having potential strategic transport value and proposes that further feasibility work be undertaken to consider its future use as a rail corridor. Development proposals should therefore have regard to any potential interaction with strategic transport infrastructure and demonstrate that future transport options are not unnecessarily prejudiced. 5.9.95. The site lies adjacent to established employment, waste management and recycling uses within Martin's Yard. Future development proposals should have regard to the operational requirements of these existing uses and seek to avoid the creation of land use conflicts that could prejudice their continued operation. Proposals should demonstrate, where necessary, how potential impacts arising from existing activities, including noise, dust, odour and vehicle movements, have been appropriately considered in accordance with relevant policies of the Northamptonshire Minerals and Waste Local Plan.
Nature & environmentSite allocationsTransport & travel📍 Grange Park📍 Hackleton📍 Kingsthorpe📍 Northampton📍 Wootton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.