The human version (we wrote this, not the council)
This policy deals with air quality. All development must consider its effect on local air quality and whether mitigation is needed during construction and afterwards. Where sensitive receptors are placed in an area of poor air quality, an air quality assessment is needed. Major developments, and those with biomass boilers or biomass or gas CHP, must show through an assessment that they are air quality neutral. All proposals should show how they will cut dust and transport and plant emissions, consider low emission travel, and use low emission heating and cooling.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy PL4 – Air quality
A. All development is required to consider whether there will be an impact on local air
quality and if this needs to be mitigated in the construction and post development
phases.
B. Where a development will introduce sensitive receptors into an area of poor air
quality, an air quality assessment will need to be undertaken to establish the impact
on the sensitive receptors and how this impact can be mitigated through
development design.
C. For all major developments, and developments involving biomass boilers, biomass or
gas CHP an air quality assessment shall be undertaken that demonstrates that the
development will be air quality neutral.
D. All development proposals should demonstrate how they propose to reduce
construction/demolition dust, reduce transport and plant emissions both in the
operational and development phase, consider low emission travel and use low
emission heating and cooling systems.
WNLP objectives: 1, 7
4.8. Flood risk
4.8.1. The NPPF requires that the planning system should take full account of all
climate impacts including the increased frequency and severity of flooding
and this policy is part of a wider strategy to minimise the impact of flooding
in the area.
4.8.2. To ensure that potential risk of flooding from all sources is taken into
account at every stage of the planning process the following documents and
agencies have been consulted in the development of the flood risk policy
PL5: Environment Agency, Lead Local Flood Authority, National Planning
Policy Framework, National Planning Practice Guidance Flood Risk and
Coastal change and DEFRA guidance 'Local planning authorities: strategic
flood risk assessment'
4.8.3. Flooding can have significant impacts on public health and wellbeing,
including displacement, adverse effects on mental health, damp and mould
growth, and long-term consequences for vulnerable communities.
Consistent with the National Planning Policy Framework (NPPF) and
Planning Practice Guidance (PPG), development should be directed to areas
at the lowest risk of flooding through the application of the Sequential Test.
Where development in areas of flood risk cannot be avoided, appropriate
mitigation measures will be required to ensure that development is safe for
its lifetime, taking account of the effects of climate change, without
increasing flood risk elsewhere. Development should be designed to be
resilient to current and future flood risk and contribute to the sustainable
management of flood risk
4.8.4. Flood risk is a significant concern for West Northamptonshire with the rivers
Nene, Tove, Great Ouse and their tributaries, the canal network and
reservoirs prominent features of the landscape.
4.8.5. West Northamptonshire Council, as the Lead Local Flood Authority (LLFA)
under the Flood and Water Management Act 2010, is responsible for
developing, maintaining and applying a strategy for local flood risk
management. The Council also has a key role in promoting the use of
sustainable drainage systems (SuDS) to manage surface water flood risk. In
January 2023, the Government announced its intention to implement
Schedule 3 of the Flood and Water Management Act 2010, which will make
SuDS mandatory for new developments. Once implemented, these
requirements are expected to be delivered through the building regulations
approval regime.
4.8.6. To accompany the preparation of the Local Plan, West Northamptonshire
Council has undertaken Level 1 and Level 2 Integrated Water Management
Studies (IWMS) which incorporates a Strategic Flood Risk Assessment and
considers all elements of water management and flooding. These were
prepared in consultation with the Environment Agency and relevant water
and sewerage Companies (Anglian, Thames and Severn Trent Water) and
replace the West Northamptonshire SFRA (Part 1) which was produced by
Northamptonshire County Council (NCC) in 2017.
4.8.7. Applicants and decision makers should liaise with the Council as LLFA and
review the current guidance available on the website for latest advice.
4.8.8. Once completed, development proposals will need to comply with the IWMS
recommendations as well as the latest national guidance to address current
and future flood risks with appropriate environmental change allowances.
4.8.9. Development will be required to take account of the Sequential and
Exception Tests as set out in the NPPF and National Planning Practice
Guidance. The aim of the Sequential Test is to steer new development to
areas with the lowest probability of flooding. Figure 2, below, details the
approach that will need to be taken. A fuller explanation of what constitutes
essential infrastructure, water compatible, highly vulnerable, more
vulnerable, and less vulnerable is set out within the national Planning
Practice Guidance
.
Figure 2: Application of the exception test to plan preparation Source: PPG – Accessible
version
4.8.10. All new development, including regeneration proposals, will need to
demonstrate that there is no increased risk of flooding to existing
properties, and proposed development is (or can be) safe and shall seek to
improve flood risk management.
4.8.11. All proposals must demonstrate that they will assist in the management of
flood risk, ensure flood risk is not increased elsewhere and provide flood
risk reduction/betterment. Proposals must have regard to relevant guidance
(or successor documents) for flood risk management and standards for
surface water produced by the LLFA and Anglian Water, Severn Trent and
Thames Water.
4.8.12. It is not possible to eliminate all the risk of flooding. The Northamptonshire
Local Flood Risk Management Strategy produced by the LLFA, sets out a
framework of measures to manage local flood risk. The strategy sets out a
collaborative approach to reducing flood risk within Northamptonshire. The
design standard for both surface and fluvial water in the Upper Nene
Catchment (through Northampton and within the Nene catchment upstream
of Northampton) is the 0.5% probability (1 in 200 chance of occurring in any
given year) event plus climate change. Surface and fluvial water attenuation
should be provided up to this standard.
4.8.13. The 2025 National Sustainable Drainage Standards introduced a new
framework for how surface water drainage must be designed, delivered and
maintained for most developments in England. Where flood risk
management requires the use of sustainable drainage systems to manage
surface water run-off, these systems should:
a. take account of advice from the lead local flood authority;
b. have appropriate proposed minimum operational standards;
c. have maintenance arrangements in place to ensure an acceptable
standard of operation for the lifetime of the development; and
d. where possible, provide multifunctional benefits.
4.8.14. The Council is currently undertaking an Integrated Water Management
Strategy. These evidence base documents are likely to include policy
recommendations relating to water use, water quality, flooding, sustainable
drainage, water efficiency and re-use. The Council will review the
recommendations and include them, when relevant, in the draft policies.
The Environment agency and MHCLG support water efficiency within
developments.