Policy PL4

Air quality

On pages 53 to 57 of the official PDF.

The human version

This policy deals with air quality. All development must consider its effect on local air quality and whether mitigation is needed during construction and afterwards. Where sensitive receptors are placed in an area of poor air quality, an air quality assessment is needed. Major developments, and those with biomass boilers or biomass or gas CHP, must show through an assessment that they are air quality neutral. All proposals should show how they will cut dust and transport and plant emissions, consider low emission travel, and use low emission heating and cooling.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 53

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy PL4 – Air quality A. All development is required to consider whether there will be an impact on local air quality and if this needs to be mitigated in the construction and post development phases. B. Where a development will introduce sensitive receptors into an area of poor air quality, an air quality assessment will need to be undertaken to establish the impact on the sensitive receptors and how this impact can be mitigated through development design. C. For all major developments, and developments involving biomass boilers, biomass or gas CHP an air quality assessment shall be undertaken that demonstrates that the development will be air quality neutral. D. All development proposals should demonstrate how they propose to reduce construction/demolition dust, reduce transport and plant emissions both in the operational and development phase, consider low emission travel and use low emission heating and cooling systems. WNLP objectives: 1, 7 4.8. Flood risk 4.8.1. The NPPF requires that the planning system should take full account of all climate impacts including the increased frequency and severity of flooding and this policy is part of a wider strategy to minimise the impact of flooding in the area. 4.8.2. To ensure that potential risk of flooding from all sources is taken into account at every stage of the planning process the following documents and agencies have been consulted in the development of the flood risk policy PL5: Environment Agency, Lead Local Flood Authority, National Planning Policy Framework, National Planning Practice Guidance Flood Risk and Coastal change and DEFRA guidance 'Local planning authorities: strategic flood risk assessment' 4.8.3. Flooding can have significant impacts on public health and wellbeing, including displacement, adverse effects on mental health, damp and mould growth, and long-term consequences for vulnerable communities. Consistent with the National Planning Policy Framework (NPPF) and Planning Practice Guidance (PPG), development should be directed to areas at the lowest risk of flooding through the application of the Sequential Test. Where development in areas of flood risk cannot be avoided, appropriate mitigation measures will be required to ensure that development is safe for its lifetime, taking account of the effects of climate change, without increasing flood risk elsewhere. Development should be designed to be resilient to current and future flood risk and contribute to the sustainable management of flood risk 4.8.4. Flood risk is a significant concern for West Northamptonshire with the rivers Nene, Tove, Great Ouse and their tributaries, the canal network and reservoirs prominent features of the landscape. 4.8.5. West Northamptonshire Council, as the Lead Local Flood Authority (LLFA) under the Flood and Water Management Act 2010, is responsible for developing, maintaining and applying a strategy for local flood risk management. The Council also has a key role in promoting the use of sustainable drainage systems (SuDS) to manage surface water flood risk. In January 2023, the Government announced its intention to implement Schedule 3 of the Flood and Water Management Act 2010, which will make SuDS mandatory for new developments. Once implemented, these requirements are expected to be delivered through the building regulations approval regime. 4.8.6. To accompany the preparation of the Local Plan, West Northamptonshire Council has undertaken Level 1 and Level 2 Integrated Water Management Studies (IWMS) which incorporates a Strategic Flood Risk Assessment and considers all elements of water management and flooding. These were prepared in consultation with the Environment Agency and relevant water and sewerage Companies (Anglian, Thames and Severn Trent Water) and replace the West Northamptonshire SFRA (Part 1) which was produced by Northamptonshire County Council (NCC) in 2017. 4.8.7. Applicants and decision makers should liaise with the Council as LLFA and review the current guidance available on the website for latest advice. 4.8.8. Once completed, development proposals will need to comply with the IWMS recommendations as well as the latest national guidance to address current and future flood risks with appropriate environmental change allowances. 4.8.9. Development will be required to take account of the Sequential and Exception Tests as set out in the NPPF and National Planning Practice Guidance. The aim of the Sequential Test is to steer new development to areas with the lowest probability of flooding. Figure 2, below, details the approach that will need to be taken. A fuller explanation of what constitutes essential infrastructure, water compatible, highly vulnerable, more vulnerable, and less vulnerable is set out within the national Planning Practice Guidance . Figure 2: Application of the exception test to plan preparation Source: PPG – Accessible version 4.8.10. All new development, including regeneration proposals, will need to demonstrate that there is no increased risk of flooding to existing properties, and proposed development is (or can be) safe and shall seek to improve flood risk management. 4.8.11. All proposals must demonstrate that they will assist in the management of flood risk, ensure flood risk is not increased elsewhere and provide flood risk reduction/betterment. Proposals must have regard to relevant guidance (or successor documents) for flood risk management and standards for surface water produced by the LLFA and Anglian Water, Severn Trent and Thames Water. 4.8.12. It is not possible to eliminate all the risk of flooding. The Northamptonshire Local Flood Risk Management Strategy produced by the LLFA, sets out a framework of measures to manage local flood risk. The strategy sets out a collaborative approach to reducing flood risk within Northamptonshire. The design standard for both surface and fluvial water in the Upper Nene Catchment (through Northampton and within the Nene catchment upstream of Northampton) is the 0.5% probability (1 in 200 chance of occurring in any given year) event plus climate change. Surface and fluvial water attenuation should be provided up to this standard. 4.8.13. The 2025 National Sustainable Drainage Standards introduced a new framework for how surface water drainage must be designed, delivered and maintained for most developments in England. Where flood risk management requires the use of sustainable drainage systems to manage surface water run-off, these systems should: a. take account of advice from the lead local flood authority; b. have appropriate proposed minimum operational standards; c. have maintenance arrangements in place to ensure an acceptable standard of operation for the lifetime of the development; and d. where possible, provide multifunctional benefits. 4.8.14. The Council is currently undertaking an Integrated Water Management Strategy. These evidence base documents are likely to include policy recommendations relating to water use, water quality, flooding, sustainable drainage, water efficiency and re-use. The Council will review the recommendations and include them, when relevant, in the draft policies. The Environment agency and MHCLG support water efficiency within developments.
Design & placemakingFlooding & waterInfrastructure & utilities📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.