Site allocation T3

Towcester, North of Burcote Road

On pages 200 to 205 of the official PDF.

The human version

This site allocation covers land north of Burcote Road, Towcester, allocated for residential development. A masterplan agreed by the Council must show how the site comes forward comprehensively and fits with the Towcester South SUE. Proposals must provide approximately 1,400 dwellings and mitigate impacts on local and strategic highways. They need noise mitigation for the A43, must be designed for bus services, and must keep and improve Public Right of Way SB15. They must provide structural greenspace and wildlife corridors, open space, community facilities, leisure and sports provision, and contributions to healthcare and transport. Several impact assessments are required.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 200

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy T3 – Towcester, North of Burcote Road A. Site T3 is allocated for residential development. B. Proposals for this site must be informed by a Masterplan, agreed by the Council, that must demonstrate how the site will come forward comprehensively, and fully integrated with the Towcester South SUE, which remains under construction. C. Proposals for this site will make provision for all of the following: i. Approximately 1,400 dwellings; ii. Mitigation of any associated impacts on the local and strategic highways networks; iii. Noise mitigation associated with the A43 Strategic Road Network; iv. Be designed to accommodate bus services; v. Proposals to encourage cycling, wheeling and walking, taking advantage of the availability of active routes in the locality, including the retention and enhancement of Public Right of Way (SB15) and provision of links with the proposed Shacks Barn Farm employment area; vi. An appropriate contribution towards off site sustainable transport and highways mitigation measures as set out in the Local Plan’s Strategic Transport Assessment (2026); vii. Structural greenspace and wildlife corridors which retain important existing landscape features including hedgerows, woodlands, mature trees and drainage corridors and include appropriate landscape enhancements in keeping with the landscape character type; viii. Retention and appropriate strengthening of existing site boundary vegetation to provide appropriate screening from the surrounding area; ix. Integration with the existing services and facilities provided in the Towcester SUE and Towcester town; x. Appropriate infrastructure including open space, community facilities, leisure/sports provision; xi. Provide appropriate funding contributions towards health care infrastructure; xii. Other necessary contributions to infrastructure as identified in the Development Contributions SPD; and xiii. Development which is consistent with the diagram shown in Figure 27. D. Development of the site will be informed by assessments and suitable mitigation related to: i. Archaeological and heritage impact; ii. Landscape and visual impact; iii. Ecological impact; iv. Highways and transport; v. Flood Risk and water and water recycling infrastructure; vi. Noise and Air Quality; vii. Crime and disorder, and viii. Minerals and waste. WNLP objectives: 1, 2, 3, 4, 5, 7, 8, 9, 10, 12, 13 Figure 27: Development principles for Towcester, North of Burcote Road 8.6. Employment and Economic Growth 8.6.1. In accordance with the Spatial Strategy for this Plan, sufficient additional employment land will be provided at Towcester in the plan period, through the delivery of previously allocated sites along with any windfall opportunities that may arise within the settlement confines. 8.6.2. Towcester employment sites that were allocated in the South Northamptonshire Part 2 Local Plan and re-allocated in this Plan comprise: • Land at Bell Plantation (identified as Policy AL1 in South Northamptonshire Local Plan), • Land at Woolgrowers Field (identified as Policy AL2 in South Northamptonshire Local Plan), and • Land at Tiffield Lane (identified as Policy AL3 in South Northamptonshire Local Plan). 8.6.3. At 1st April 2026, the planning situation at each of these sites, was: • Land at Bell Plantation – hybrid and outline consents granted, with some Reserved Matters applications under consideration; • Land at Woolgrowers Field – outline planning consent granted; • Land at Tiffield Lane – hybrid planning consent approved for the allocation, along with Reserved Matters approvals on parts of the site. Construction has legally commenced. 8.6.4. It is expected that the planning status of these formerly allocated sites will continue to progress alongside the development of this West Northamptonshire Local Plan. Where this progress is consistent with the consented applications, it is appropriate that the approved schemes proceed in accordance with the consented development principles, parameters and technical considerations that have been established in their granted consents. However, should new planning applications be brought forward that materially depart from the currently approved planning consents, it is appropriate that the previous policy approach, with minor alterations as detailed in previous iterations of this plan, and identified in Policies T4 to T6 be maintained. (Note: Should circumstances evolve as this plan proceeds towards adoption, this approach will be reviewed). 8.6.5. In consequence, it would be expected that they shall be accompanied and supported by an independent study providing market-evidence on the proportion of E(g) (Uses which can be carried out in a residential area without detriment to its amenity), B2 (general industrial) and B8 (storage and distribution) required, with supporting uses that are demonstrably subservient and complementary in both scale and nature to an existing or proposed class use. This study shall be undertaken by an independent expert. It shall provide advice on the appropriate mix of uses in terms of demand and achieving a range and mix. The scope of the study will be agreed between the Local Planning Authority and the applicant prior to its commencement. 8.6.6. The allocations shall be brought forward with regard to a variety of site specific design and place shaping principles in addition to those required in the wider policies of this Plan, as well as being in accordance with adopted Supplementary Planning Documents, including the South Northamptonshire Employment Site Allocations Development Brief (October 2022), or any equivalent successor document. 8.6.7. A detailed Heritage Impact Assessment will be required for each site including detailed consideration of any archaeological impacts including the need for initial archaeological assessment, including in relation to the archaeological potential of the sites due to their proximity to the Roman Road (Watling Street), including field evaluation to identify areas of archaeological activity and to develop an appropriate mitigation strategy. This may lead to archaeological mitigation which could involve preservation in situ by design or record or a combination of the two. Both the heritage and archaeological assessments need to be undertaken in advance of the submission of any planning applications so as to inform the master planning work. The assessment for the Bell Plantation and Tiffield Lane sites must also include an assessment of the heights of new buildings and any impact on the Easton Neston Grade II* Registered Park and Garden (RPG) and other heritage assets. 8.6.8. The Northamptonshire Bus Strategy (April 2018) expects that all employment developments are provided with a high quality bus service from first occupation, both to reduce low-occupancy car travel, peak time highways impacts, and overall car dependency and their associated emissions. They also permit access to employment opportunities for a wide range of people and are essential to social inclusion. 8.6.9. In line with the general principle that developers should be required to mitigate the impacts of their own proposals, the Council will, within the constraints imposed by the Community Infrastructure Levy Regulations, expect developers to fund any new bus-related infrastructure required to improve access to their development, and to fund the resources required for the provision of any altered, extended or new bus services required until such a time as the anticipated revenue makes them commercially sustainable. In line with best practice, the Council will generally require all major developments to demonstrate that bus services can be accessed at stops within a 400m (about 10 minutes) walk of any part of the development. Internal development layout and urban design should have full regard to the location of existing bus stops and clearly signal where new stops are to be provided. Higher density development near existing or proposed bus stops is strongly recommended. However, it is accepted that achieving the 400m target may not always be strictly achievable. Developers will be expected to demonstrate that the great majority of their development is within 400m of a reasonable and safe walking route of bus stops served by regular services to the nearest major facilities and centres. Where this is not the case, new stops and/or service diversions shall be provided by the developer. To achieve higher levels of modal shift, it is recommended that the majority of occupiers are within 250m of stops, through careful consideration of urban design and density. Early dialogue with the Council will be required to determine whether a diversion of existing routes to the site is feasible or a contribution to support existing routes is preferred. 8.6.10. Employment land has also been allocated within the Towcester South SUE mixed- use development, which remains to be delivered. Towcester, Land at Bell Plantation 8.6.11. The Bell Plantation site is located at the A43/A5 junction, north of Towcester and represents an appropriate employment location for the provision of additional small and medium sized commercial buildings close to the town as its planned expansion takes place. The strategic road network and local distributor routes can be readily accessed from this area, so avoiding lorry movements through residential areas. Development in this area provides an opportunity for high visibility economic investment. Approximately 4ha of the site is developed as a mixed use that has expanded from its former predominant use as a garden centre. 8.6.12. The Bell Plantation site provides an opportunity for the creation of a new and improved community facility for use by the Towcester Town Football Club. The Club was formed in 1988 and is now a Chartered Standard Community Club. Currently the teams play on the recreation ground in Towcester as well as on pitches in Greens Norton and Pattishall. This is because there are no facilities currently available within the town itself and the club does not own any land or facilities. The Club itself continues to grow but this will be severely limited by the lack of dedicated pitch provision in the future, and it will be unable to meet the demands of the growing population. The South Northamptonshire Playing Pitch Strategy (2018) referred to the proposal for a new home for Towcester Town Football Club and supported the allocation of a 6ha site for football at the Bell Plantation. The delivery of this site was considered to be a high priority for action, which remains the case in the updated West Northamptonshire Council Playing Pitch Strategy and Action Plan, April 2024. 8.6.13. The site reserved for the Football Club should be as close to the main built-up part of the town as feasible (subject to suitable topography) and meet the needs of the Club in the future without detriment to any nearby residents. The design and layout of the employment element of the mixed-use site should be compatible with, and not prejudice the delivery of, the football facilities. 8.6.14. The provision of land for the Town Football Club on the Bell Plantation site is an important step towards the provision of such an important facility for the community of Towcester. It is also critical to ensure that the project is delivered on the ground. The South Northants Playing Pitch Strategy (2018), updated by the West Northamptonshire Council Playing Pitch Strategy and Action Plan 2024, evidences the need for additional pitch provision within Towcester and supports the provision of facilities at Bell Plantation. Northamptonshire Football Association and the Football Foundation are supportive of the proposals to provide additional pitch provision and continue to assist in the ongoing dialogue surrounding the funding of the facilities. However, ownership of, or long leasehold interest in, a site is a pre-requisite for several funding bodies, and a development plan allocation or planning permission is a relevant consideration for others. Consequently, these are important steps in the delivery of the project. Nevertheless, inclusion of the football facilities in updates to the Local Authority’s Infrastructure Delivery Plan taken together with the possibility that the project may be funded in part by contributions from the Community Infrastructure Levy evidence both the commitment to and the deliverability of the allocation. The delivery of the facilities will be closely monitored. 8.6.15. The Council adopted a Supplementary Planning Document in 2022 to provide further guidance on the development of this and other employment allocations in the South Northamptonshire Part 2 plan. The SPD considers landscape and visual considerations related to the development of these sites; sets out a detailed assessment of each site and then sets out a development framework covering matters such as access and movement, green infrastructure, building height, scale and massing. As set out in part K of policy T4 any application will need to include an assessment of how the proposals comply with the guidance set out in the SPD.
Infrastructure & utilitiesSite allocationsTransport & travel📍 Greens Norton📍 Towcester
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.