Policy T3 – Towcester, North of Burcote Road
A. Site T3 is allocated for residential development.
B. Proposals for this site must be informed by a Masterplan, agreed by the Council, that
must demonstrate how the site will come forward comprehensively, and fully integrated
with the Towcester South SUE, which remains under construction.
C. Proposals for this site will make provision for all of the following:
i. Approximately 1,400 dwellings;
ii. Mitigation of any associated impacts on the local and strategic highways networks;
iii. Noise mitigation associated with the A43 Strategic Road Network;
iv. Be designed to accommodate bus services;
v. Proposals to encourage cycling, wheeling and walking, taking advantage of the
availability of active routes in the locality, including the retention and enhancement of
Public Right of Way (SB15) and provision of links with the proposed Shacks Barn Farm
employment area;
vi. An appropriate contribution towards off site sustainable transport and highways
mitigation measures as set out in the Local Plan’s Strategic Transport Assessment
(2026);
vii. Structural greenspace and wildlife corridors which retain important existing landscape
features including hedgerows, woodlands, mature trees and drainage corridors
and include appropriate landscape enhancements in keeping with the
landscape character type;
viii. Retention and appropriate strengthening of existing site boundary
vegetation to provide appropriate screening from the surrounding area;
ix. Integration with the existing services and facilities provided in the Towcester SUE and
Towcester town;
x. Appropriate infrastructure including open space, community facilities, leisure/sports
provision;
xi. Provide appropriate funding contributions towards health care infrastructure;
xii. Other necessary contributions to infrastructure as identified in the Development
Contributions SPD; and
xiii. Development which is consistent with the diagram shown in Figure 27.
D. Development of the site will be informed by assessments and suitable mitigation related
to:
i. Archaeological and heritage impact;
ii. Landscape and visual impact;
iii. Ecological impact;
iv. Highways and transport;
v. Flood Risk and water and water recycling infrastructure;
vi. Noise and Air Quality;
vii. Crime and disorder, and
viii. Minerals and waste.
WNLP objectives: 1, 2, 3, 4, 5, 7, 8, 9, 10, 12, 13
Figure 27: Development principles for Towcester, North of Burcote Road
8.6. Employment and Economic Growth
8.6.1. In accordance with the Spatial Strategy for this Plan, sufficient additional
employment land will be provided at Towcester in the plan period, through the
delivery of previously allocated sites along with any windfall opportunities that
may arise within the settlement confines.
8.6.2. Towcester employment sites that were allocated in the South Northamptonshire
Part 2 Local Plan and re-allocated in this Plan comprise:
• Land at Bell Plantation (identified as Policy AL1 in South Northamptonshire Local
Plan),
• Land at Woolgrowers Field (identified as Policy AL2 in South Northamptonshire
Local Plan), and
• Land at Tiffield Lane (identified as Policy AL3 in South Northamptonshire Local
Plan).
8.6.3. At 1st April 2026, the planning situation at each of these sites, was:
• Land at Bell Plantation – hybrid and outline consents granted, with some
Reserved Matters applications under consideration;
• Land at Woolgrowers Field – outline planning consent granted;
• Land at Tiffield Lane – hybrid planning consent approved for the allocation, along
with Reserved Matters approvals on parts of the site. Construction has legally
commenced.
8.6.4. It is expected that the planning status of these formerly allocated sites will
continue to progress alongside the development of this West Northamptonshire
Local Plan. Where this progress is consistent with the consented applications, it is
appropriate that the approved schemes proceed in accordance with the
consented development principles, parameters and technical considerations that
have been established in their granted consents. However, should new planning
applications be brought forward that materially depart from the currently
approved planning consents, it is appropriate that the previous policy approach,
with minor alterations as detailed in previous iterations of this plan, and identified
in Policies T4 to T6 be maintained. (Note: Should circumstances evolve as this
plan proceeds towards adoption, this approach will be reviewed).
8.6.5. In consequence, it would be expected that they shall be accompanied and
supported by an independent study providing market-evidence on the proportion
of E(g) (Uses which can be carried out in a residential area without detriment to
its amenity), B2 (general industrial) and B8 (storage and distribution) required,
with supporting uses that are demonstrably subservient and complementary in
both scale and nature to an existing or proposed class use. This study shall be
undertaken by an independent expert. It shall provide advice on the appropriate
mix of uses in terms of demand and achieving a range and mix. The scope of the
study will be agreed between the Local Planning Authority and the applicant prior
to its commencement.
8.6.6. The allocations shall be brought forward with regard to a variety of site specific
design and place shaping principles in addition to those required in the wider
policies of this Plan, as well as being in accordance with adopted Supplementary
Planning Documents, including the South Northamptonshire Employment Site
Allocations Development Brief (October 2022), or any equivalent successor
document.
8.6.7. A detailed Heritage Impact Assessment will be required for each site including
detailed consideration of any archaeological impacts including the need for initial
archaeological assessment, including in relation to the archaeological potential of
the sites due to their proximity to the Roman Road (Watling Street), including
field evaluation to identify areas of archaeological activity and to develop an
appropriate mitigation strategy. This may lead to archaeological mitigation which
could involve preservation in situ by design or record or a combination of the
two. Both the heritage and archaeological assessments need to be undertaken in
advance of the submission of any planning applications so as to inform the
master planning work. The assessment for the Bell Plantation and Tiffield Lane
sites must also include an assessment of the heights of new buildings and any
impact on the Easton Neston Grade II* Registered Park and Garden (RPG) and
other heritage assets.
8.6.8. The Northamptonshire Bus Strategy (April 2018) expects that all employment
developments are provided with a high quality bus service from first occupation,
both to reduce low-occupancy car travel, peak time highways impacts, and
overall car dependency and their associated emissions. They also permit access
to employment opportunities for a wide range of people and are essential to
social inclusion.
8.6.9. In line with the general principle that developers should be required to mitigate
the impacts of their own proposals, the Council will, within the constraints
imposed by the Community Infrastructure Levy Regulations, expect developers to
fund any new bus-related infrastructure required to improve access to their
development, and to fund the resources required for the provision of any altered,
extended or new bus services required until such a time as the anticipated
revenue makes them commercially sustainable. In line with best practice, the
Council will generally require all major developments to demonstrate that bus
services can be accessed at stops within a 400m (about 10 minutes) walk of any
part of the development. Internal development layout and urban design should
have full regard to the location of existing bus stops and clearly signal where new
stops are to be provided. Higher density development near existing or proposed
bus stops is strongly recommended. However, it is accepted that achieving the
400m target may not always be strictly achievable. Developers will be expected
to demonstrate that the great majority of their development is within 400m of a
reasonable and safe walking route of bus stops served by regular services to the
nearest major facilities and centres. Where this is not the case, new stops and/or
service diversions shall be provided by the developer. To achieve higher levels of
modal shift, it is recommended that the majority of occupiers are within 250m of
stops, through careful consideration of urban design and density. Early dialogue
with the Council will be required to determine whether a diversion of existing
routes to the site is feasible or a contribution to support existing routes is
preferred.
8.6.10. Employment land has also been allocated within the Towcester South SUE mixed-
use development, which remains to be delivered.
Towcester, Land at Bell Plantation
8.6.11. The Bell Plantation site is located at the A43/A5 junction, north of Towcester and
represents an appropriate employment location for the provision of additional
small and medium sized commercial buildings close to the town as its planned
expansion takes place. The strategic road network and local distributor routes
can be readily accessed from this area, so avoiding lorry movements through
residential areas. Development in this area provides an opportunity for high
visibility economic investment. Approximately 4ha of the site is developed as a
mixed use that has expanded from its former predominant use as a garden
centre.
8.6.12. The Bell Plantation site provides an opportunity for the creation of a new and
improved community facility for use by the Towcester Town Football Club. The
Club was formed in 1988 and is now a Chartered Standard Community Club.
Currently the teams play on the recreation ground in Towcester as well as on
pitches in Greens Norton and Pattishall. This is because there are no facilities
currently available within the town itself and the club does not own any land or
facilities. The Club itself continues to grow but this will be severely limited by the
lack of dedicated pitch provision in the future, and it will be unable to meet the
demands of the growing population. The South Northamptonshire Playing Pitch
Strategy (2018) referred to the proposal for a new home for Towcester Town
Football Club and supported the allocation of a 6ha site for football at the Bell
Plantation. The delivery of this site was considered to be a high priority for
action, which remains the case in the updated West Northamptonshire Council
Playing Pitch Strategy and Action Plan, April 2024.
8.6.13. The site reserved for the Football Club should be as close to the main built-up
part of the town as feasible (subject to suitable topography) and meet the needs
of the Club in the future without detriment to any nearby residents. The design
and layout of the employment element of the mixed-use site should be
compatible with, and not prejudice the delivery of, the football facilities.
8.6.14. The provision of land for the Town Football Club on the Bell Plantation site is an
important step towards the provision of such an important facility for the
community of Towcester. It is also critical to ensure that the project is delivered
on the ground. The South Northants Playing Pitch Strategy (2018), updated by
the West Northamptonshire Council Playing Pitch Strategy and Action Plan 2024,
evidences the need for additional pitch provision within Towcester and supports
the provision of facilities at Bell Plantation. Northamptonshire Football Association
and the Football Foundation are supportive of the proposals to provide additional
pitch provision and continue to assist in the ongoing dialogue surrounding the
funding of the facilities. However, ownership of, or long leasehold interest in, a
site is a pre-requisite for several funding bodies, and a development plan
allocation or planning permission is a relevant consideration for others.
Consequently, these are important steps in the delivery of the project.
Nevertheless, inclusion of the football facilities in updates to the Local Authority’s
Infrastructure Delivery Plan taken together with the possibility that the project
may be funded in part by contributions from the Community Infrastructure Levy
evidence both the commitment to and the deliverability of the allocation. The
delivery of the facilities will be closely monitored.
8.6.15. The Council adopted a Supplementary Planning Document in 2022 to provide
further guidance on the development of this and other employment allocations in
the South Northamptonshire Part 2 plan. The SPD considers landscape and
visual considerations related to the development of these sites; sets out a
detailed assessment of each site and then sets out a development framework
covering matters such as access and movement, green infrastructure, building
height, scale and massing. As set out in part K of policy T4 any application will
need to include an assessment of how the proposals comply with the guidance
set out in the SPD.