The human version (we wrote this, not the council)
This site allocation covers Land at Bell Plantation, Towcester. It is allocated for 35ha of mixed employment development, together with 6ha for a Towcester Town Football Club home ground. Uses are a mix of E(g), B2 and B8 with supporting uses. A masterplan is required before any planning application. Access to the employment site will be from the A5, and the developer must provide road access to the football club site. Community Infrastructure Levy money may part fund the club. The policy requires a transport assessment, travel plan, new footpaths and cycleways, and heritage, archaeological and landscape assessments, including the impact on the Easton Neston Registered Park and Garden.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy T4 – Towcester, Land at Bell Plantation
A. Site T4 is allocated for 35ha of mixed employment generating development together
with 6ha of land for the creation of a Towcester Town Football Club home ground. A
variety of employment types will be sought to reflect the need for diversity and
resilience in the local economy as expressed in the Council’s economic growth strategy.
B. An integrated, coordinated and comprehensive planning approach will be taken for the
site and a masterplan must be prepared, in consultation with the local planning
authority and the local highway authority, Towcester Town Council and other statutory
undertakers prior to the submission of a planning application covering the development
of the whole site.
C. The uses on the site will be:
i. A mix of E(g) (Uses which can be carried out in a residential area without detriment to
its amenity), B2 (general industrial) and B8 (storage and distribution) with supporting
uses that are demonstrably subservient and complementary in both scale and nature to
an existing or proposed B class use; and
ii. 6ha to be provided within the allocated site for Towcester Town Football Club with the
precise location dependent on suitable topography.
D. The design and layout of the employment element of the mixed use site should be
compatible with, and not prejudice the delivery of, the football facilities.
E. The football club may, in part, be funded by contributions from the Council’s Community
Infrastructure Levy.
F. Access to the employment site will be from the A5; and
i. Access to the football club site will be provided by the developer of the employment part
of the site, from either within the employment site or from a new separate access on
the A5 and provide an unfettered road access point to the edge of the football club site;
and
ii. Good accessibility to public transport services should be provided for, including
contributions to the cost of diverting existing routes through the site or to support
existing local services and promote sustainable travel; and
iii. A Transport Assessment and travel plan will be required to assess the transportation
implications of the proposed development and to identify appropriate mitigation
measures; and
iv. New footpaths and cycleways will be provided that link to existing networks and safe
crossing points on the A43.
G. A detailed heritage impact assessment will be required for the whole site, to be agreed
with the Local Planning Authority in consultation with Historic England, prior to the
design of the scheme in order to inform the height of any proposed buildings, layout
and extent of the development. This will explicitly include an assessment of the height
of any new buildings and impact on the Easton Neston Grade II* Registered Park and
Garden as well as detailed consideration of any impacts on designated and non-
designated heritage assets and subject to the assessment being agreed, a programme
of informed mitigation should be included with any application.
H. Prior to the submission of an application, a detailed assessment for the whole site will be
required to characterise archaeological remains and identify direct impact of
development proposals to inform design and a programme of archaeological mitigation.
I. A detailed strategic landscape assessment of the whole site will be required to deliver a
high quality landscaped setting within and around the boundary of the proposal.
J. Proposals will be required to provide utilities up to the edge of the site for the football
club.
K. An assessment demonstrating compliance with the South Northamptonshire
Employment Site Allocations Development Brief (October 2022), or any equivalent
successor document will be required.
WNLP objectives: 1, 2, 3, 4, 7, 8, 9, 10, 13, 14, 15
Towcester, Land at Woolgrowers Field
8.6.16. The Woolgrowers Field also lies to the north of Towcester at the A5/A43 junction.
The site is close to existing commercial uses including a car showroom, the
existing Bell Plantation mixed-use development, a petrol filling station and a
building goods supplier.
8.6.17. The Council adopted a Supplementary Planning Document in 2022 to provide
further guidance on the development of this and other employment allocations in
the South Northamptonshire Part 2 plan. The SPD considers landscape and
visual considerations related to the development of these sites; sets out a
detailed assessment of each site and then sets out a development framework
covering matters such as access and movement, green infrastructure, building
height, scale and massing. As set out in part H of policy T5 any application will
need to include an assessment of how the proposals comply with the guidance
set out in the SPD.