← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / T5

Site allocation T5

Towcester, Land at Woolgrowers Field

On pages 207 to 208 of the official PDF.

The human version

This site allocation covers Land at Woolgrowers Field, Towcester. It is allocated for mixed employment development, with a variety of types sought. A masterplan is required before any planning application. Uses are a mix of E(g), B2 and B8 with supporting uses. Access will be from the A5 and/or the Greens Norton Road. The policy requires good public transport access, a transport assessment and travel plan, and new footpaths and cycleways with safe crossing points on the A43. It also requires heritage, archaeological and strategic landscape assessments, and an assessment of compliance with the South Northamptonshire Employment Site Allocations Development Brief (October 2022).

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 207

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy T5 – Towcester, Land at Woolgrowers Field A. Site T5 is allocated for mixed employment generating development. A variety of employment types will be sought to reflect the need for diversity and resilience in the local economy as expressed in the Council’s economic growth strategy. B. An integrated, coordinated and comprehensive planning approach will be required for the employment site and a masterplan must be prepared, in consultation with the local planning authority, the local highway authority and other statutory undertakers prior to the submission of a planning application covering the development of the whole site. C. The uses on the site will be a mix of E(g), (Uses which can be carried out in a residential area without detriment to its amenity), B2 (general industrial) and B8 (storage and distribution) with supporting uses that are demonstrably subservient and complementary in both scale and nature to an existing or proposed B class use. D. Access to the employment site to be from the A5 and/or the Greens Norton Road; and i. Good accessibility to public transport services should be provided for, including contributions to the cost of diverting existing routes through the site or to support existing local services and promote sustainable travel; and ii. A Transport Assessment and travel plan will be required to assess the transportation implications of the proposed development and to identify appropriate mitigation; and iii. New footpaths and cycleways will be provided that link to existing networks and safe crossing points on the A43. E. A detailed heritage impact assessment will be required for the whole site to be agreed with the Local Planning Authority in consultation with Historic England, prior to the design of the scheme in order to inform the height of any proposed buildings, layout and extent of the development. This will explicitly include an assessment of the height of any new buildings and impact on the Easton Neston Grade II* Registered Park and Garden as well as detailed consideration of any impacts on designated and non- designated heritage assets and subject to the assessment being agreed, a programme of informed mitigation should be included with any application. F. Prior to submission of an application, a detailed assessment for the whole site will be required to characterise archaeological remains and identify direct impact of development proposals to inform design and a programme of archaeological mitigation. G. A detailed strategic landscape assessment of the whole site will be required to deliver a high quality landscaped setting within and around the boundary of the proposal. H. An assessment demonstrating compliance with the South Northamptonshire Employment Site Allocations Development Brief (October 2022), or any equivalent successor document will be required. WNLP objectives: 1, 2, 3, 4, 7, 8, 9, 10, 13, 14, 15 Towcester, Land at Tiffield Lane 8.6.18. The site is located to the north of Towcester, next to the A43, and adjoins the urban area of Towcester town adjacent to the Bell Plantation employment allocation. Development on the land will therefore form a natural expansion to the urban area of a sustainable town and adjoin an employment cluster. The land will also create a significant number of jobs to support recent housing development in the area. 8.6.19. Proposals must allow improvements to the dangerous road crossings at Northampton Road/A43 and Tiffield Lane/A43, and any scheme either approved or forthcoming, will only be progressed if there is demonstrable support from the highways authorities. Evidence will also need to be provided that the Highways Authority is satisfied with the proposed road improvements and traffic implications, through transport modelling and travel plans. 8.6.20. The Council adopted a Supplementary Planning Document in 2022 to provide further guidance on the development of this and other employment allocations in the South Northamptonshire Part 2 plan. The SPD considers landscape and visual considerations related to the development of these sites; sets out a detailed assessment of each site and then sets out a development framework covering matters such as access and movement, green infrastructure, building height, scale and massing. As set out in part H of policy T6 any application will need to include an assessment of how the proposals comply with the guidance set out in the SPD.
Jobs & economySite allocationsTransport & travel📍 Greens Norton📍 Northampton📍 Towcester
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.