← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / TR1

Policy TR1

Sustainable transport vision

On pages 345 to 348 of the official PDF.

The human version

This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 345

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy TR1 – Sustainable transport vision A. Development proposals must demonstrate compliance with the following sustainable transport principles: i. Prioritising safe, direct and inclusive walking, wheeling, cycling and public transport use over private car use for trips made to everyday services and facilities such as schools, community facilities, open spaces and shops both on and off-site; ii. Ensuring it is located within or is well-connected to existing or deliverable strategic public transport corridors that can be enhanced; and iii. Supporting the national ambition for increased walking, wheeling and cycling, including the objective of 50% of journeys in towns being made by active travel by 2030, through compliance with Active Travel England Standing Advice. Transport mode hierarchy (in order of priority) B. To achieve the above vision all developments must demonstrate they have considered the following sustainable transport hierarchy in the development and operation of transport infrastructure and services as appropriate for each specific location: i. Enabling access to services and opportunities without the need for motorised travel through spatial planning and enhancing digital access; ii. Active travel for people of all abilities (walking, wheeling, cycling, and horse riding); iii. Public and community transport (bus, scheduled coach, rail and community transport); iv. Taxi, shared and private hire vehicles (with priority given to zero emission vehicles); v. Zero emission private vehicles (cars, vans, and motorcycles); and vi. Freight and fleet vehicles, including trucks and lorries (with priority given to low and zero emission vehicles), private vehicles with tailpipe emissions (for example, those using internal combustion engines). Infrastructure standards C. Proposals must demonstrate and achieve the following sustainable travel principles: i. Provide safe, inclusive and secure walking, wheeling and off-street cycle routes on allocated and major sites, connecting all dwellings to key destinations; ii. Provide secure cycle parking spaces per dwelling, in accordance with LTN 1/20 or successor documents; iii. Enable public transport penetration within larger sites and provide supporting last-mile active travel infrastructure including cycle parking spaces with new planned bus-stops; iv. Provide connected street networks and hierarchy of routes as guided under NMDC-2, prioritising low-traffic neighbourhoods and reduce dominance of motorised vehicles; v. Consider car-free development as a starting point in sustainable locations. In other locations, to minimise private car use, supported by robust evidence and incorporating electric vehicle charging infrastructure in accordance with national requirements; vi. Proposals within existing centres must not generate parking demand that would result in unacceptable impacts on the local highway network, public realm, active travel infrastructure or sustainable travel principles; vii. Provide shared and flexible parking solutions, to make efficient use of land and support active travel, public realm and mixed-use development; and viii. The provision of mobility hubs to support everyday needs of local residents and provide an alternative for private car usage on short distance routes. Transport impact assessment standards D. Applicants must demonstrate that the proposals will not have severe adverse impacts on the transport network through the following assessments and supporting information: i. For all developments (as required through the local validation checklist): A transport assessment/statement demonstrating how the proposal responds to the sustainable transport principles set out in Policy TR1; and ii. For major developments: • An Active Travel Assessment aligned with the latest Active Travel England guidance and design principles as guided under NMDC-2 and Policy PL6; • A robust Travel Plan demonstrating measurable modal shift away from private car use; and • A public transport strategy. E. Transport Assessments/Statements and Travel Plans must demonstrate delivery of the transport vision, account for cumulative and future impacts, and ensure that there will not be an unacceptable impact on highway safety, or that the residual cumulative impacts of the development on the road network, following mitigation, will not be severe, taking into account all reasonable future scenarios. WNLP objectives: 1,7,8,9,10 14.5. Strategic connections 14.5.1. West Northamptonshire’s strategic rail and road connections make the area economically attractive for distribution, logistics and other industries which rely on national and international connections, including being home to Daventry International Rail Freight Terminal (DIRFT) and Northampton Gateway at junction 15 of the M1. However, these connections (M1, A45 and A43) are also attractive for local trips which increases congestion around junctions and on the strategic road network, with freight and passengers causing congestion on the rail network (West Coast Main Line). The West Northamptonshire LTP (2025) and England Economic Heartland’s ‘Rail Strategic Objectives’ (October 2023) set out the priorities for railway transport for West Northamptonshire. 14.5.2. To ensure that the road network remains efficient and can serve the strategic demand, it will be important to make improvements to carefully manage more local movements to enhance capacity. At the strategic level ‘Smart Motorways’ which include use of former hard shoulders have been introduced on some sections of the national motorway network. Locally, this includes the M1 between J13 and J19. 14.5.3. The West Northamptonshire LTP details key interventions locally and was informed by England Economic Heartland’s Peterborough – Northampton – Oxford Connectivity Study (December 2022) and the Oxford – Milton Keynes Connectivity Study (December 2022) which set out the priorities for road transport for West Northamptonshire. 14.5.4. In the case of the A45 and A43 trunk roads in the area, National Highways have implemented or are proposing to implement traffic management measures and related junction modifications in conjunction with development coming forward in these corridors. 14.5.5. On the A43, junction improvements have been required to enable housing and employment growth at Towcester, Silverstone and Brackley. The Northampton Growth Management Scheme (NGMS) for the M1/A45 sets out necessary mitigation measures on the A45 between the M1 Junction 15 and Great Billing Junction required to support growth at Northampton. The partner councils have agreed a Memorandum of Understanding (MoU) with National Highways on the delivery of NGMS with the agreement outlining a mechanism for using S106 planning obligations and CIL to deliver the schemes. The NGMS also considers the staging of developer contributions to support the viability of developments. The specific developer funded measures on the A45 and A43 are set out in the Infrastructure Delivery Plan. 14.5.6. The West Coast Mainline provides the key north-south rail link for England and into Scotland but is particularly congested around Northampton and Long Buckby where freight and passenger services share the same lines. As demand from passengers and freight on the line increases, there may be a conflict between users. Whilst the area benefits from this strategic rail link (West Coast Mainline via the Northampton loop), the range of destinations available, the frequency and speed of connections is weaker than nearby settlements such as Coventry, Rugby and Milton Keynes which are of a similar population size. It should be noted that once High Speed 2 is built and operational, this is expected to release some capacity on the West Coast Mainline. 14.5.7. West Northamptonshire is also serviced by the Chiltern Line with a station at Kings Sutton. This is a smaller station which serves the more rural areas in the west of the Plan area, however services from here into London are less frequent than on the West Coast Main Line. 14.5.8. Development and infrastructure planning should take account of the cumulative impacts of growth on strategic transport corridors, including the M1, A43, A45 and West Coast Main Line, working collaboratively with National Highways, neighbouring authorities and other transport providers. 14.5.9. Delivery of the strategic transport priorities identified in Policy TR2 will require cross-boundary collaboration with neighbouring authorities, National Highways, Network Rail, train operators, England's Economic Heartland and other stakeholders to address connectivity, capacity and investment requirements across the wider region.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Brackley📍 Daventry📍 DIRFT📍 Kings Sutton📍 Long Buckby📍 Northampton📍 Silverstone📍 Towcester
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.