← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire Plan Explorer

DIRFT

5 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy allocates sites in Northampton for employment use, which must accord with the Development Plan. A table lists the sites with area in hectares and indicative jobs. Sixfields East is 10.18 hectares with 871 jobs. Crow Lane is 2.92 hectares with 94 jobs. Martin's Yard is 1.4 hectares with 194 jobs. Land at Waterside Way is 0.98 hectares with 445 jobs. South of Junction 15, M1 is listed at 68 hectares under policy N23. The supporting text covers strategic distribution, including Northampton Gateway.

The human version (we wrote this, not the council)This site allocation sets aside 50 ha south of Junction 16 of the M1, Northampton, for strategic B8 warehousing and logistics. A masterplan is needed before any application. Proposals must follow minerals extraction and restoration policies, use low-carbon design, offer training, and provide public transport and active travel. Landscape buffers must separate the site from Nether Heyford and Upper Heyford. Applicants must show no adverse effect on the nearby SSSI, and deliver biodiversity net gain. Heritage, noise, lighting, transport, flood risk and crime assessments are required. Two years of overwintering bird surveys must check links to the Upper Nene Valley Gravel Pits Special Protection Area.

The human version (we wrote this, not the council)This site allocation covers land east of the M1 for strategic B8 warehousing and logistics, as an extension of the Daventry International Rail Freight Terminal (DIRFT). A masterplan is needed before any application. Proposals must use low-carbon design, offer training, and provide for public transport and active travel. Landscape buffers must protect Crick, Clay Coton, Lilbourne and Yelvertoft. Heritage, landscape, noise, lighting, transport, flood risk and crime assessments are required. All vehicle access must go through the existing DIRFT site west of the M1, and drainage should maximise Sustainable Drainage Systems.

The human version (we wrote this, not the council)This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.

The human version (we wrote this, not the council)This policy allows two routes shown on the policies map to be investigated for future transport use: the former Northampton to Market Harborough railway line, which would need part of the North West Relief Road to be realigned, and the former Northampton to Brackmills railway line. Schemes must make compensation for any loss of habitat. The Market Harborough route must also include a parallel walking and cycling route. Consideration will also be given to a Northampton Northern Orbital Road.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.