← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / TR3

Policy TR3

Future transport schemes

On pages 352 to 353 of the official PDF.

The human version

This policy allows two routes shown on the policies map to be investigated for future transport use: the former Northampton to Market Harborough railway line, which would need part of the North West Relief Road to be realigned, and the former Northampton to Brackmills railway line. Schemes must make compensation for any loss of habitat. The Market Harborough route must also include a parallel walking and cycling route. Consideration will also be given to a Northampton Northern Orbital Road.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 352

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy TR3 – Future transport schemes A. The following routes, as shown on the policies map, may be investigated for future transport use: i. Former Northampton to Market Harborough railway line (which would necessitate a re- alignment of part of the North West Relief Road and a bridge over the line); and ii. Former Northampton to Brackmills railway line. B. Schemes would need to make compensatory provision for any loss of habitat, and in the case of Northampton to Market Harborough, a parallel opportunity for cycling and walking will need to be provided. C. Consideration will also be given to the provision of a Northampton Northern Orbital Road. WNLP objectives: 8,9 14.7. Overnight lorry parks 14.7.1. There is a high level of lorry traffic in West Northamptonshire due to the area being a major location in the UK for a large number of companies that rely on lorry movements including logistics and warehousing. 14.7.2. Daventry International Rail Freight Terminal (DIRFT) is located at junction 18 of the M1 where it meets with the A5. Other major employment sites are also set alongside junctions 15, 15A and 16 of the M1 motorway. 14.7.3. The following, formal overnight lorry parks are in West Northamptonshire: • Red Lion Truck Stop, Weedon Road, Harpole • The Super Sausage Car and Lorry Park, Northampton • Truckstop Roadchef, Northampton M1 J15A • DIRFT III Lorry Park, Lilbourne • Night Owl – North of DIRFT on A5 In addition, planning permission exists for a lorry park to the north-east of Junction 1 on the A14. 14.7.4. New lorry parks would be supported at appropriate locations and with evidence that there is a need for further lorry parking facilities. The Council will seek to ensure that future overnight lorry parking provision is planned and delivered in locations that support the effective operation of the strategic freight network, including West Northamptonshire's role within the wider Golden Triangle logistics area, and address identified gaps in provision identified through evidence of current and future demand. 14.7.5. Park Mark Freight is a recognised accreditation scheme which promotes safe, secure and well-managed parking facilities. Overnight lorry parks should be designed and operated to minimise opportunities for crime and enhance the safety and wellbeing of drivers. Applicants should demonstrate how the development has incorporated recognised good practice, including Secured by Design principles where appropriate. Measures may include suitable site layout, lighting, surveillance, access control, boundary treatments, landscaping and driver welfare facilities. Proposals should also minimise adverse environmental effects, including noise, lighting and vehicle emissions, having regard to relevant environmental policies in the Plan.
Health, schools & communityJobs & economyTransport & travel📍 Daventry📍 DIRFT📍 Harpole📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.